Category:Code Relief or Alternative
MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2021-01-25025 January 2021 Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19136A3862019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19141A0202019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19155A0602019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds RS-19-015, Relief Request 14-RS-1 to Implement Code Case OMN-132019-01-31031 January 2019 Relief Request 14-RS-1 to Implement Code Case OMN-13 ML18347B4192019-01-17017 January 2019 Relief Request I4R-03, Relief from ASME Requirements for the Fourth 10-Year Inservice Inspection Interval Related to Degraded Canopy Seal Welds Associated with Control Rod Drive Mechanism ML18318A3342019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18331A0372019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18305A3602018-12-0606 December 2018 Relief from the Requirements of the American Society of Mechanical Engineers Code RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1)2018-10-11011 October 2018 Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2018-09-24024 September 2018 Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) ML17249A2982017-11-13013 November 2017 Relief from the Requirements of the ASME Code (CAC No. MF9597; EPID L-2017-LLR-0021) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17095A2682017-03-31031 March 2017 Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request ML17054C2552017-03-15015 March 2017 Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16162A2112016-06-29029 June 2016 Request for Use of Alternative ML16109A3372016-04-27027 April 2016 Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718) ML14303A5062014-12-10010 December 2014 Relief from the Requirements of the ASME Code to Extend the Reactor Vessel Inservice Inspection Interval ML13016A5152013-01-30030 January 2013 Relief from the Requirements of the ASME Code for the Third 10-Year Interval of Inservice Inspection ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML12108A1232012-04-19019 April 2012 Safety Evaluation in Support of the Third 10-Year Inservice Inspection Interval Request for Relief 13R-08 (Tac Nos. ME6024 and ME6025) ML1113306532011-06-0606 June 2011 Unacceptable with Opportunity to Supplement Alt. to ASME Code Requirements for Repair of Reactor Vessel Head Penetrations (TACs ME6071, ME6072, ME6073, and ME6074) ML1105909212011-03-0303 March 2011 Relief Request from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1011905272010-05-11011 May 2010 Relief Request 13R-06 for Detailed Visual Examination During Appendix J Pnuematic Leakage Testing ML1012301792010-05-10010 May 2010 Relief Request I3R-03 for Examination of Structural Weld Overlays ML1008504952010-03-26026 March 2010 Application Accepted - Braidwood & Byron Relief Request Re. ASME Code Case N-729-1 (TACs ME3510 - ME3513) RS-10-046, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2010-03-12012 March 2010 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1004806992010-03-0808 March 2010 Relief Request 12R-50 for Second 10-Year Inservice Inspection Interval 2024-07-23
[Table view] Category:Letter
MONTHYEARML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) 05000456/LER-2024-001, Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open2024-07-0303 July 2024 Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23
[Table view] Category:Safety Evaluation
MONTHYEARML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21063A0162021-03-0808 March 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Alternative to 10 CFR 50.55a(z)(2) ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20133K0932020-05-14014 May 2020 Relief from the Requirements of the ASME Code ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19240B1122019-09-0909 September 2019 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code 2024-09-10
[Table view] |
Text
April 14, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD NUCLEAR GENERATING STATION, UNITS 1 AND 2 -
RELIEF REQUEST RV-1 FOR THE THIRD INTERVAL INSERVICE TESTING PROGRAM (TAC NOS. MD7415 AND MD7416)
Dear Mr. Pardee:
By letter dated November 16, 2007 (Agencywide Documents Access and Management System Accession No. ML073230623), Exelon Generation Company, LLC (the licensee),
submitted Relief Requests (RR) RV-1 for the third 10-year inservice testing (IST) at Braidwood Station, Units. 1 and 2 (Braidwood). The licensee requested relief from a valve exercise requirement in the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers, Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code). Specifically, RR RV-1 requested relief from an ASME OM Code requirement in ISTC-3520 for containment recirculation sump isolation valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B.
The Nuclear Regulatory Commission (NRC) staff has reviewed the licensees analysis in support of its RR and concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 55a(a)(3)(i), the NRC staff authorizes the proposed alternative in RR RV-1, for the third 10-year IST interval at Braidwood. The RR authorized for the third 10-year IST interval will begin on July 28, 2008, and end on July 28, 2018.
The NRC staff's safety evaluation is enclosed.
Sincerely,
/RA/
Russell Gibbs, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosure:
Safety Evaluation cc w/encl: See next page
Mr. Charles G Pardee April 14, 2008 Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD NUCLEAR GENERATING STATION, UNITS 1 AND 2 -
RELIEF REQUEST RV-1 FOR THE THIRD INTERVAL INSERVICE TESTING PROGRAM (TAC NOS. MD7415 AND MD7416)
Dear Mr. Pardee:
By letter dated November 16, 2007 (Agencywide Documents Access and Management System Accession No. ML073230623), Exelon Generation Company, LLC (the licensee),
submitted Relief Requests (RR) RV-1 for the third 10-year inservice testing (IST) at Braidwood Station, Units. 1 and 2 (Braidwood). The licensee requested relief from a valve exercise requirement in the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers, Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code). Specifically, RR RV-1 requested relief from an ASME OM Code requirement in ISTC-3520 for containment recirculation sump isolation valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B.
The Nuclear Regulatory Commission (NRC) staff has reviewed the licensees analysis in support of its RR and concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 55a(a)(3)(i), the NRC staff authorizes the proposed alternative in RR RV-1, for the third 10-year IST interval at Braidwood. The RR authorized for the third 10-year IST interval will begin on July 28, 2008, and end on July 28, 2018.
The NRC staff's safety evaluation is enclosed.
Sincerely,
/RA/
Russell Gibbs, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrLAEWhitt RidsOgcRp RidsNrrDorlLpl3-2 RidsAcrsAcnw&nMailCenter RidsNrrRgn3MailCenter RidsNrrDciCptb RidsNrrPMMThorpe-Kavanaugh RidsNrrDorlDpr STingin, NRR DJackson, EDO, Region III Adams Accession No. ML080370181 *SE dated NRR-088 OFFICE LPL3-2/PM LPL3-2/LA DCI/CPTB/BC OGC LPL3-2/BC NAME MThorpe-Kavanaugh EWhitt JMcHale* RGibbs DATE 02/11/08 02/11/08 01/14/08 02/14/08 04/14/08 OFFICIAL RECORD COPY
Braidwood Station, Units 1 and 2 cc:
Corporate Distribution Via e-mail Exelon Generation Company, LLC Illinois Emergency Management Agency Via e-mail Division of Nuclear Safety Via e-mail Braidwood Distribution Exelon Generation Company, LLC Will County Executive Via e-mail Via e-mail Mr. Dwain W. Alexander, Project Manager Attorney General Westinghouse Electric Corporation Springfield, IL 62701 Via e-mail Via e-mail Ms. Bridget Little Rorem Ms. Lorraine Creek Appleseed Coordinator RR 1, Box 182 Via e-mail Manteno, IL 60950 Howard A. Learner Chairman, Ogle County Board Environmental Law and Policy Post Office Box 357 Center of the Midwest Oregon, IL 61061 Via e-mail Braidwood Resident Inspector U.S. Nuclear Regulatory Commission
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO RELIEF REQUEST RV-1 THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457
1.0 INTRODUCTION
By letter dated November 16, 2007 (Agencywide Documents Access and Management System Accession No. ML073230623), Exelon Generation Company, LLC (the licensee), submitted Relief Request (RR) RV-1 for the third 10-year inservice testing (IST) program interval at Braidwood Station, Units 1 and 2 (Braidwood). The licensee requested relief from a valve exercise requirement in the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers, Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code). Braidwoods third 10-year IST interval is scheduled to begin on July 29, 2008, and end on July 28, 2018.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 55a, requires that IST of certain ASME OM Code Class 1, 2, and 3 pumps and valves be performed at 120-month (10-year) IST program intervals in accordance with the specified ASME OM Code incorporated by reference in the regulations. Alternatives to the ASME OM Code may be been authorized or relief may be requested by the licensee and granted by the NRC pursuant to paragraphs (a)(3)(i), (a)(3)(ii), or (f)(6)(i) of 10 CFR 50.55a. In accordance with 10 CFR 50.55a(f)(4)(ii),
licensees are required to comply with the requirements of the latest edition and addenda of the ASME OM Code incorporated by reference in the regulations 12 months prior to the start of each 120-month IST program interval.
In proposing alternatives or requesting relief, the licensee must demonstrate that: (1) the proposed alternatives provide an acceptable level of quality and safety; (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety; or (3) conformance is impractical for the facility. Section 50.55a, of 10 CFR authorizes the NRC staff to approve alternatives and to grant relief from ASME OM Code requirements upon making necessary findings.
Braidwoods third 10-year IST interval is scheduled to begin on July 29, 2008. The program will be in accordance with the 2001 Edition through 2003 Addenda of the ASME OM Code. By letter dated November 16, 2007, the licensee submitted RR RV-1 for the third 10-year IST program interval at Braidwood.
Enclosure
The NRCs findings with respect to granting, authorizing, or denying the IST program RR are given below:
3.0 TECHNICAL EVALUATION
RR RV-1 The licensee has requested relief from an ASME OM Code requirement in ISTC-3520 for Units 1 and 2 containment recirculation sump isolation valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B. These are ASME OM Code Category B valves and provide an isolation boundary between the suctions of the residual heat removal (RHR) and containment spray (CS) pumps, and the containment recirculation sumps. These valves are located outside containment and are opened or closed to control the flow path from the containment recirculation sump to the RHR and CS pumps. The licensees analysis in support of its request for relief from the test requirement is described in the licensees letter dated November 16, 2007. A description of the RR and the NRC staffs evaluation follows.
3.1 ASME OM Code Requirements Paragraph ISTC-3510, Exercising Test Frequency, of the ASME OM Code requires Category B valves to be exercised every 3 months, unless the conditions provided by ISTC-3521, Category A and Category B Valves, are used to justify an alternative exercise frequency. ISTC-3521(e) states that if exercising is not practical during plant operation or cold shutdowns, it may be limited to full-stroke exercising during refueling outages.
The licensee has requested relief from the requirement in ISTC-3521(e) for valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B.
3.2 Licensees Basis for Relief Relief is requested pursuant to 10 CFR 50.55a(a)(3)(i), as the proposed alternative would provide an acceptable level of quality and safety.
Under normal plant operating conditions, the RHR and CS systems are filled with borated water and the containment recirculation sumps are maintained in a dry state. Exercising valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B requires the RHR and CS pumps for a given train to be removed from service and the suction lines drained to prevent water flow from the refueling water storage tank and associated system piping into the normally empty containment recirculation sump. It takes approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to drain the RHR and CS systems, exercise the valves, and refill and restore the systems to their normal configuration. An estimated 600 gallons of radioactive, borated water is drained and must be processed by the radioactive waste systems. This same amount of borated water must be used to refill the system. This sequence of events is required whether the testing is done online or during a refueling outage.
The availability of the RHR and CS systems can be optimized by exercising the containment recirculation sump valves during scheduled work windows for the RHR system. Due to improvements in the logistics of planning and executing work, some maintenance of the RHR system is performed online (i.e., Mode 1). At other times, the nature of the maintenance to be performed requires that the maintenance be performed during a refueling outage. The scope of the work on the system, the scheduling of work windows in the planning process, system
availability requirements, personnel resources, and maintenance of an acceptable risk profile are impacted when this work is performed.
In order to minimize the number of drain and refill evolutions and the processing of radioactive, borated water described previously, it is advantageous to exercise the containment recirculation sump valves during the same drain and refill evolution used to perform system maintenance.
3.3 Licensees Proposed Alternative Testing The licensee proposes to exercise the containment recirculation sump valves 1SI8811A 1SI8811B, 2SI8811A and 2SI8811B at a frequency of every 18 months plus a 25 percent grace period instead of exercising the valves at a frequency of every refueling outage.
3.4 NRC Staffs Evaluation of Relief Request The proposed relief would allow the addition of containment recirculation sump valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B IST exercise activities to RHR system maintenance windows where these valves can be exercised along with other activities that have been risk assessed. This request seeks to allow the same alternative to testing currently conducted during refueling outages to be performed during maintenance windows for operation at power.
In its RR, the licensee stated that due to improvements in the logistics of planning and executing work, some maintenance of the RHR system is performed on line (i.e., Mode 1). At other times, the nature of the maintenance to be performed requires that the maintenance be performed during a refueling outage. In order to minimize the number of drain and refill evolutions and the processing of radioactive, borated water described previously, it is advantageous to exercise the containment recirculation sump valves during the same drain and refill evolution used to perform RHR system maintenance. Therefore, the availability of the RHR and CS systems can be optimized by exercising the containment recirculation sump valves during scheduled work windows for the RHR system. The licensee also stated that if there is not an online system maintenance work window that requires the piping to be drained, the valves will be exercised during a refueling outage.
The risk associated with maintenance activities is controlled by the licensee. Prior to performing either online or shutdown testing, its effect on risk must be evaluated in accordance with the requirements of 10 CFR 50.65(a)(4), Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. Section 50.65(a)(4) states, in part, before performing maintenance activities (including but not limited to surveillance, post-maintenance testing, and corrective and preventive maintenance), the licensee shall assess and manage the increase in risk that may result from the proposed maintenance activities.
Allowing these valves to be exercised online or during a refueling outage at an 18-month frequency (with a 25 percent allowance for flexibility in scheduling) should reduce overall RHR and CS system/train out-of-service time, and thus, will provide an acceptable level of quality and safety.
4.0 CONCLUSION
Based on the above evaluation of RR RV-1, the NRC staff concludes that the licensees alternative provides reasonable assurance of the operational readiness of containment recirculation sump isolation valves 1SI8811A, 1SI8811B, 2SI8811A and 2SI8811B and provides an acceptable level of quality and safety. Therefore, RR RV-1 is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the third 10-year IST interval at Braidwood, which will begin on July 28, 2008 and end on July 28, 2018.
Principal Contributor: S. Tingen, NRR Date: April 14, 2008