MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:Safety Evaluation
MONTHYEARML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21063A0162021-03-0808 March 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Alternative to 10 CFR 50.55a(z)(2) ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20133K0932020-05-14014 May 2020 Relief from the Requirements of the ASME Code ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19240B1122019-09-0909 September 2019 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19136A3862019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code 2023-09-19
[Table view] |
Text
UNITED STATES WASHINGTON, D.C. 20555-0001 September 9, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 - PROPOSED ALTERNATIVE TO THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE (EPID L-2019-LLR-0007)
Dear Mr. Hanson:
By letter dated January 31, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19031C900), Exelon Generation Company, LLC (Exelon, the licensee) requested to use an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), associated with snubber examination at Braidwood Station, Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(z)(1 ), the licensee requested to use the proposed alternative on the basis that it provides an acceptable level of quality and safety.
The U.S. Nuclear Regulatory Commission (NRC or Commission) staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Exelon has adequately addressed all regulatory requirements in 10 CFR 50.55a(z)(1). Therefore, the NRC staff authorizes the use of the alternative request 14-RS-1 for Braidwood Station, Unit 1, for the fourth 10-year inservice inspection (ISi) interval snubber program which started on August 29, 2018, and is scheduled to end on July 28, 2028, and for Braidwood Station, Unit 2, for the fourth 10-year ISi interval snubber program, which started on November 5, 2019, and is scheduled to end on October 16, 2028.
All other ASME OM Code requirements for which relief was not specifically requested and approved remain applicable.
B. Hanson If you have any questions, please contact the Project Manager, Joel Wiebe at 301-415-6606 or via e-mail at ~:::;.:;.:..:c-'-====.;;,.=.::.a*
isa M. Regner, Acting Branch Chief Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-457
Enclosure:
Safety Evaluation cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST TO USE ALTERNATIVE 14-RS-1 REGARDING SNUBBER EXAMINATIONS EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. 50-456 AND 50-457
1.0 INTRODUCTION
By letter dated January 31, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19031C900), Exelon Generation Company, LLC (Exelon, the licensee) submitted an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code),
associated with snubber examination at Braidwood Station (Braidwood), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1 ), the licensee requested to use proposed alternative 14-RS-1 on the basis that the alternative provides an acceptable level of quality and safety.
The Braidwood, Unit 1, fourth 10-year inservice inspection (ISi) and snubber inservice examination and testing interval started on August 29, 2018, and is scheduled to end on July 28, 2028. The Braidwood, Unit 2, fourth 10-year ISi and snubber inservice examination and testing interval started on November 5, 2018, and is scheduled to end on October 16, 2028.
2.0 REGULATORY EVALUATION
As required by 10 CFR 50.55a(g), "lnservice Inspection Standards Requirements for Operating Plants," ISi of certain ASME Code Class 1, 2, and 3 components must be performed in accordance with that specified in Section XI of ASME Boiler Pressure Vessel (BPV) Code (or ASME OM Code for snubber examination and testing) and applicable addenda incorporated by reference in the regulations.
As required by 10 CFR 50.55a(b)(v)(B), "OM Condition: Snubbers, Second Provision," the licensee must comply with the provisions for examination and testing snubbers in Subsection ISTD of the ASME OM Code and make appropriate changes to their technical specifications or licensee-controlled documents when using 2006 Addenda and later editions and addenda of the Section XI of the ASME BPV Code."
Enclosure
As required by 10 CFR 50.55a(z), alternatives to the requirements of paragraph (g) of 10 CFR 50.55a may be used, when authorized by the Nuclear Regulatory Commission (NRC), if the licensee demonstrates: (1) the proposed alternatives provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Proposed Alternative 14-RS-1 The licensee requested to extend snubber examination and testing frequency requirements of the ASME OM Code for all snubbers within the scope of the Braidwood, Units 1 and 2, snubber programs as permitted by ASME OM Code Case OMN-13, Revision 2 ..
Applicable Code Edition/Addenda The applicable ASME BPV Code edition and addenda for Braidwood, Units 1 and 2, fourth 10-year ISi interval is the 2013 Edition with no Addenda. Therefore, per 10 CFR 50.55a(b)(3)(v)(B), the applicable requirement for snubber inservice examination and testing is the 2012 Edition of the ASME OM Code with no Addenda.
Applicable Code Requirements ISTD-4252, "Subsequent Examination Intervals," (c}, states "The duration of examination intervals following the completion of the second refueling outage shall be in accordance with Table ISTD-4252-1."
ISTA-3130, "Application of Code Cases," (b}, states, "Code Cases shall be applicable to the edition and addenda specified in the test plan."
ASME OM Code Case OMN-13, Revision 2, "Performance-Based Requirements for Extending Snubber lnservice Visual Examination Interval at LWR Power Plants."
Reason for Request
The licensee states:
ISTA-3130(b) states, "Code Cases shall be applicable to the edition and addenda specified in the test plan." ASME has approved Code Case OMN-13, Revision 2, "Performance-Based Requirements for Extending Snubber lnservice Visual Examination Interval at LWR Power Plants," in ASME OM Code 2012 Edition.
This Code Case OMN-13, Revision 2 is unconditionally approved for use in Regulatory Guide (RG) 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code," Revision 2. The Braidwood Units 1 and 2, code of record for the fourth ISi interval for snubbers examination and testing is the ASME OM Code 2012 Edition. However, Code Case OMN-13, Revision 2, states in the Applicability section that it is applicable to ASME OM Code 1995 Edition through 2011 Addenda. Braidwood will be implementing the ASME OM Code 2012 Edition for its Snubber Programs and proposes to also implement Code Case OMN-13, Revision 2, for extending the examination interval for snubbers.
Proposed Alternative The licensee proposes to use ASME OM Code Case OMN-13, Revision 2, with the 2012 Edition of the ASME OM Code in lieu of the 1995 Edition through 2011 Addenda of the ASME OM Code, as stated in the applicability section of Code Case OMN-13, Revision 2. The proposed alternative will be utilized for the Braidwood, Units 1 and 2, fourth ISi 10-year interval for snubber inservice examination and testing.
3.2 NRC Staff Evaluation The 2012 Edition of the ASME OM Code, Section ISTD-4252(c), requires snubber examination intervals following the second refueling outage to be in accordance with intervals specified in Table ISTD-4252-1. The snubber visual examination interval can be extended up to 48 months by meeting the requirements as specified in the Table ISTD-4252-1 and its notes. The ASME OM Code Case OMN-13, Revision 2, allows an extension of the visual examination interval beyond the interval allowed in Table ISTD-4252-1. ISTA-3130(b), requires Code Cases shall be applicable to the edition and addenda specified in the test plan. The licensee has proposed to use ASME OM Code Case OMN-13, Revision 2, to extend the visual examination interval beyond the interval allowed by Table ISTD-4252-1 for all snubbers in the snubber/ISi programs.
Specifically, the licensee proposes to apply ASME OM Code Case OMN-13, Revision 2, to the 2012 Edition of the ASME OM Code in lieu of the 1995 Edition through 2011 Edition, to extend the visual inspection frequency of snubbers in the ISi program.
Application of ASME OM Code Cases is addressed in 10 CFR 50.55a(b)(6) through references to RG 1.192, Revision 2, "Operation and Maintenance Code Case Acceptability, ASME OM Code, which lists acceptable and conditionally acceptable Code Cases for implementation in the ISi interval for Snubber program. RG 1.192, Revision 2, shows Code Case OMN-13, Revision 2, in Table 1 as acceptable for use without conditions. Code Case OMN-13, Revision 2, was published with the 2012 Edition of the ASME OM Code, and it is applicable to the 1995 Edition through the 2011 Addenda of the ASME OM Code. There is no technical reason for prohibiting the use of the Code Case OMN-13, Revision 2 with the 2012 Edition of the ASME OM Code.
Further NRC staff review of the 2012 Edition of the ASME OM Code and Code Case OMN-13, Revision 2, confirmed that there are no changes in the applicable Code sections referenced within the Code Case OMN-13, Revision 2. Therefore, the NRC staff concludes that the licensee's proposed alternative provides an acceptable level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff determined that for alternative request 14-RS-1 for Braidwood, Units 1 and 2, the proposed alternative provides an acceptable level of quality and safety for the snubbers. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)( 1) for request 14-RS-1. Therefore, the NRC staff authorizes the use of the alternative request 14-RS-1 for Braidwood, Unit 1, for the fourth 10-year ISi interval snubber program which started on August 29, 2018, and scheduled to end on July 28, 2028, and for Braidwood, Unit 2, for the fourth 10-year ISi interval snubber program, which started on November 5, 2019, and are scheduled to end on October 16, 2028.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable.
Principal Contributor: Gurjendra S. Bedi, NRR Date of issuance: September 9, 2019
ML192408112 *via email OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DMLR/MPHB/BC NAME JWiebe SRohrer SBailey*
DATE 09/04/19 08/29/19 08/07/19 OFFICE NRR/DORL/LPL3/BC (A) NRR/DORL/LPL3/PM NAME LRegner JWiebe DATE 09/05/19 09/09/19