ML18191A301

From kanterella
Jump to navigation Jump to search
Wppss Nuclear Project No. 2, Schedule for Submission of Requested Additional Information
ML18191A301
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/24/1975
From: Stein J
Washington Public Power Supply System
To: Butler W
Office of Nuclear Reactor Regulation
References
G02-75-20
Download: ML18191A301 (6)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

Public Power DATE OF DOC DATE REC'D LTR TWX FILE'ROM:Washington RPT OTHER Supply Richland, Wash 1-24-75 1-28-75 xxxx TO: ORIG CC OTHER SENT AEC PDR Dr, W.R. Butler 1-signed SENT LOCAL PDR xxx CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

1 50-397 DESCRIPTION: ENCLOSURES:

Ltr ref our ltk4-75 ltr furn requested info for WPPSS Nuclear Project No. 2 ~ ~ ~ ~ ~ ~

W1 L lt PLANT NAME:

L J Hanford g2 FOR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) Zl EMANN (L) REGAN (E)

W+Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPE LS W/ Copies W/ Copies W/ Copies W/ Copies KNI EL (L) PURPLE (L) YOUNGBLOOD (E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTR I BUTIQN T H REVIEW DENTON LIC ASST A/T IND RC PDR HROEDER GR IMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A MACCARY GAMM ILL H. GEARIN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P; KREUTZER (E)

+SIAMBUSSO SHAO SPANGLER J LEE (L) PLANS BOYD STE LLO NVI RO vs MAIGRET (L) MCDONALD CHAPMAN OORE (L) HOUSTON S. REED (E)

EYOUNG (L) NOVAK ULLER M. SERVICE (L) DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GQLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L) KLECKER

~EG QPR LAINAS PROJECT LDR G. WILLIAMS(E) EISENHUT FILE 5 REGION (2) BENAROYA V. WILSON (L) WI GG I NTON T.R. WILSON VOLLMER HAR LESS R. INGRAM (L)

STEE LE EXTERNAL DISTRIBUTION LOCAL PDR Richland, Wash P D R-SAN/LA/N(Y y-)

1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 1 NSIC (BUCHANAN) 1 W. PENNINGTQN, Rm E-201 GT 1 BROOKHAVEN NAT LAB 1 ASLB 1 CONSULTANTS 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/B LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

ACRS HOLDING/SENT Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT

~ ~

P

~ ~

~ ~ ~ ~ ~

Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND. WASHINGTON 99$ 52 PHONE (509) 846.868'I January 24, 1975 G02-75-20 Docket No. 50-397 Dr. W. R. Butler, Chief BWR Projects Branch No. 1-2 Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20545

Subject:

WPPSS NUCLEAR PROJECT NO. 2 SCHEDULE FOR SUBMISSION OF RE VESTED ADDITIONAL INFORMATION

Reference:

Letter, W. R. Butler to J. J. Stein, dated January 14, 1975.

Dear Dr. Butler:

The referenced letter requested a schedule by. which'PPSS planned to submit information for resolution of your comments on WPPSS reports regarding outstanding Post Construction Permit items. We have the fol-lowing dates established for providing the requested information:

1. Resolution of comments on Dr ell-Wetwell Leaka e report to be submitted in two parts:

~ Structural Engineering information to be submitted on March 1, 1975.

~ Mechanical Systems information to be skbmitted on May 1, 1975.

2. Resolution of comments on Protection A ainst Pi e Breaks Inside Containment to be submitted on March 15, 1975.
3. Resolution of comments on Protection A ainst Pi e Breaks Outside Containment to be submitted on March 15, 1975.

Dr. W. R. Butler, Chief Page 2 of 2 January 24, 1975 G02-75-20

~

, 4. Resolution of comments on Sacrificial Shield Wall to be submitted in two parts:

~ Information regarding pressure calculations and structural criteria for Sacrificial Wall base design to be supplied on February 15, 1975.

~ Sacrificial Shield Wall design information to be supplied May 15, 1975.

Please do not hesitate to contact us if you have any questions regarding these scheduled dates.

Very truly yours, J. TEIN Ma aging Director JJS:GLG:vlm cc: JJ Byrnes - Burns and Roe, Inc.

BW Kennedy - Bonneville Power Administration JJ Verderber - Burns and Roe, Inc.

4 1I I

t