ML18044A090
| ML18044A090 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/14/2017 |
| From: | Jesse Seymour, Bielby M NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Seymour J | |
| Shared Package | |
| ML17152A386 | List: |
| References | |
| 50-454/OL-17, 50-455/OL-17 | |
| Download: ML18044A090 (1) | |
Text
ES-301 Operatins Test Qualitv Checklist Form ES-301-3 Facilitv: '8,,ç^
Date of Examinalion: 1219rl tt4 ooeratinq Test Number: 2ot7'Jol
- 1. General Griteria lnitials a
b*
ic a.
The sam operating test conforms to the previously approved outline; changes are consistent with 1 0 CFR function LÚ4 n hte\\
b.
There is no day-to-day repetition between this and other operating tests to be administered d
this examination t/7 4 lltc.t c.
The shall not icate items from the audit D.1.a rt,r4 ttoA d.
Overlap with the written examination and between different parts of the operating test is within e limits.
tlI t4 W e.
It appears that the operating test will differentiate between competent and less-than-competent aoolicants at the desiqnated license level.
,/N A tlttq 2.
Criteria a.
Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues siatements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable ft tl
{ilq b.
Ensure that any changes from the previously approved systems and administrative walkthrough ougines (Formi ES-301 -1 and ES-301 -2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC exam s and Form ES-201-2 W A rnç
- 3. Simulator Griteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4. and a copv is attached.
w7 n
ínqt Printed N Date
- a. Author
- b. Facility Reviewer (.)
- c. NRC Chief Examiner (#)
- d. NRC Supervisor lsq tottul 20-
- The facility licensee signature is not applicable for NRC-developed tests.
- The indeóendent NRC reviewer initials items in column "c"; the chief examiner conculrence is required.