ML18044A090

From kanterella
Jump to navigation Jump to search
2017 Byron Station Initial License Examination Form ES-301-3
ML18044A090
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/14/2017
From: Jesse Seymour, Bielby M
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Seymour J
Shared Package
ML17152A386 List:
References
50-454/OL-17, 50-455/OL-17
Download: ML18044A090 (1)


Text

ES-301 Operatins Test Qual itv Checklist Form ES-301-3

'8,,ç^ Date of Examinalion: 1219rl tt4 ooeratinq Test Number:

2ot7'Jol Facilitv:

lnitials

1. General Griteria i

a b* c

a. The operating test conforms to the previously approved outline; changes are consistent with sam 1 0 CF R function LÚ4 n hte\
b. There is no day-to-day repetition between this and other operating tests to be administered t/7 4 lltc.t d this examination
c. The shall not icate items from the audit D.1.a rt ,r4 ttoA tlI t4
d. Overlap with the written examination and between different parts of the operating test is within e limits. W
e. It appears that the operating test will differentiate between competent and less-than-competent ,/N A tlttq aoolicants at the desiqnated license level.
2. Criteria
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-ft tl {ilq detailed expected actions with exact criteria and nomenclature system response and other examiner cues siatements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walkthrough ougines (Formi ES-301 -1 and ES-301 -2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC exam s and Form ES-201-2 WA rnç
3. Simulator Griteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4. and a copv is attached.

w7 n ínqt Printed N Date

a. Author 20-
b. Facility Reviewer (.)
c. NRC Chief Examiner (#)
d. NRC Supervisor

' lsq tottul

  • The facility licensee signature is not applicable for NRC-developed tests.
  1. The indeóendent NRC reviewer initials items in column "c"; the chief examiner conculrence is required.