Interim Deficiency Rept Re Cable Pulling Activities.Requests Extension Until 800301 to File Final Definitive Rept
ML18031A329
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/10/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
PLA-429, NUDOCS 7912140265
Download: ML18031A329 (4)


Text

RKGULATORY <FORMATION DISTRIBUTION SY M 'RIDS)

FACIL:

AUT

~

ACCESSION NBR:791?140265 Susquehanna 50~388 Susquehanna DOC,DATE: 79/12/16 NOTaRIZKD~ No Steam Electric StationK Unit 1i Pennsylva Steam Electric Stationi 0nit 2i Pennsylva AUTHOR AFF II. I A T ION DOCKET 05000387 05000388 C UR T IS K i4 ~ 'IN ~ Pennsylvania Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFILIATION

SUBJECT:

Interim aef ici ency r ept re cabl e pul l ing acti vi t i es Requests extension until 800301 to file final definitive rept.

~

OISTRISUTION COOK T S0195 COPIES RECEIVKOTCTR TI TLE! Const r uct i on De f i c i ency Report

/ KNCI. P. SIZKI (10CFR50 ~ 55K)

NOTES: OC AO Q +K 8 C'Y 5 FSIRR I I Q+5 RKC IP IKNT COPIES RKC IP IKNT COP IKS ID LOOK/NAME I.TTR EN L ID COOK/NAME LTTR ENC L ACTIONS PM ~MWR BC4-~~% 5 20 LA <W~+ + 1 1

15 21 AOL ~i 1 1

INTERNAL: 01 EG F IL 02 i4RC PDR 05 I 07 EDO 8 STAFF 08 MPA 09 DEPY DIR Of M 10 QAB 11 STANORDS DEV 12 JOROANKK/IE 13F IELO COOR/IK 16 AO FOR ENGR 17 AD PLANT SYS 17 AD REAC SFTY 22 0IR DPM 23 OELO AD/SI TK TECH DIRECTOR OSK GKOSC I EI4CES BR 18C SYS BR MATL KNG BR MECH KNG BR POWER SYS BR S HANAUFR STRUCT ENG BR EXTEHI4AL~ 03 LPDR 1: 04 NSIC 1 24 ACRS 16 1 Rgai

~g.G 5'd 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ KNCL

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (218) &21-818'I NORMAN W. CURTtS Vice President-Engineertng iL Construction 821-5381 December 10, L979 Mr. Boyce H. Grier Director, Region I U. S. Nuclear ReguLatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY ZN CABIZ PULLING ACTZVZTIES (STATUS UPDATE)

ERs 100450/100508 FILE 840-4 PLA-429

Dear Mr. Grier:

The damage sustained by safety related cables during cable pulling activities and reported in our PLA-383 of July 17, 1979 to the Commission under the provisions of 10 CFR 50.55(e) remains under investigation. Our architect engineer, Bechtel Corporation, has recently provided PPaL a preliminary report which is not yet suitable for formal submittaL.

Bechtel has further indicated that a final report is forthcoming by December 3Lr 1979. Therefore, we request an extension from the originally scheduled date until March 1, 1980 for subnittaL of a final definitive report.

We will continue to aggressively pursue this problem and will advise the Commission of the results of our evaluation once the final report is available from Bechtel.

Very truly yours, N. W. Curtis Vice President-Engineering & Construction F'

ARS tmcb K~1 PENNSYLVANIA POWER tL LIGHT COMPANY g/o V918140

Mr. Boyce H. Grier December 10, 1979 cc: Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny, Pennsylvania 18655 Mr. G. McDonald Office of Management Information & Pxogram Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Victor Stello (15)

Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555