Interim Deficiency Rept Re Pipe Support Design Drawings. Final Rept Will Be Provided in Apr 1981
ML18030A411
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/22/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
ER-100450-10050, MCAR-1-36, PLA-514, NUDOCS 8007290455
Download: ML18030A411 (3)


Text

REGULA fORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8007290455 DOC,DATE: 80/07/22 NOTARIZED! NO DOCKET FACIL: =... Susquehanna Steam Electric Station~ Unit li Pennsylva 05000387 usquehanna Steam Electric Station< Unit 2i,Pennsylva 05000388 AU AUTHOR AFFILIATION CUR T I S, N. ur, Pennsylvania Po~er 8 Light Co ~

RECIP ~ NAME 'ECIPIENT AFFILIATION

SUBJECT:

Interim de4iciency rept re pipe suppor t design drawings0 Final r ept ail be provided in Apr 1981.

I DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR ~

TITLE: Conetructi on Oeficfency Reoort (IOCFR50,55E)

ENCL SIZE:

i40TES:Send 18E Send ICE 3

3 copies copies FSAR FSAR 8

8 al all l

amends'5000387 amends ~

05000388 REC IP IEi'lT COPIES REC IP IEiN T COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION; A/0 LICEiJSNG 21 YOUNGBLOODEB 15 RUSHBROOKgM ~ 20 STARKiR ~ 14 INTERNAL: AD/RC I/IE 1 AEOD 0/DIH HUM FAC S 1 D IR E HUi9 FAG SF Y EOO Il STAFF 07 1 EQUIP QUAL BRi6 FIELD COOR/IE13 1 IKE 05 LIC QUAL BR 1 MPA 08 f5'RC PDR 02 1 OELD 23 REV BR 1 QA BR 10 RA F I 01 1 RUTHERFORDgH,IE OS DEV 11 EXTERNAL: ACRS 16 1 LPDR 03 NSIC 1 TOTAL NUMBER OF COPIES REQUIRED: I.TTR 40 ENCL

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr {215) 821 ~ SIS I NORMAN W. CURTIS Vice President- Enpineerinp 8 Ccnsrrucricn. Nuclear 821 5381 July 22, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Comtnission 631 Park Avenue King'of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE IN THE STATUS OF A DEFICIENCY ON PIPE SUPPORT DESIGN DRAWINGS ERs 100450/100508 FILE 840-4/900-10 PLA-514

Reference:

PLA-391 dated September 5, 1979 PLA-462 dated March 24, 1980

Dear Mr. Grier:

This supplements the above listed correspondence and provides an update on the projected completion date.

Our architect engineer, Bechtel Power Corporation, has advised us that a final report on the defective condition (MCAR 1-36) will not be available until at least March of 1981.

Consequently we expect to provide the Commission with our final report in April, 1981.

Very truly yours, N..~ ~ Curtis Construction-Nuclear Vice President-Engineering &

FLW:mcb P,o/1 5

i/o PENNSYLVANIA POWER 8 LIGHT COMPANY

.8007898

@gal

Mr. Boyce H. Grier July 22, 1980 cc: Mr. Victor Stello (15)

Director-Office of Inspection & Enforcement U . S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. 0. Box 52 Shickshinny, Pennsylvania 18655