MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable1998-04-15015 April 1998 Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] |
Text
ATTACHMENT2 TO PLA-4173 Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 610/774-5151 Robert G. Byram Senior Vice President Nuclear 610/774-7502 Fax: 610/774-5019 FEB 07 1SS4 Director of Nuclear Reactor Regulation Attention: Mr. C. L. Miller, Project Director Project Directorate 1-2 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO QUESTIONS FOR ENVIRONMENTAL ASSESSMENT FOR POWER UPRATE WITH INCREASED CORE FLOW Docket Nos. 50-387 PLA-4092 FILES A17-2/R41-2/P88-1 and 50-388
Dear Mr. Miller:
This letter responds to questions from the staff regarding the environmental assessment for power uprate with increased core flow. Although your questions were directed at the effects of the Unit 3 power<isuprate, these responses are applicable to the combined effects of both Units 1 and Unit'2 o'peratmg at power uprate conditions.
The responses to the staff's questions are provided below:
- 1. River Water and Circulating Water System Provi<he the effects of additional <vithdra<val of river <voter and an increase in the blowdown rate from the natural draft cooling tower, for the proposed uprated power operation.
The maximum withdrawal rate from the river will increase from the current value of 38,800 gpm to 40,700 gpm after power uprate, an increase of 5%. The maximum blowdown rate will increase from the current value of 10,300 gpm to 10,800 gpm, an increase of 5%.
':After reviewing the additional water withdrawal requirements and increased blowdown rate from the natural draft cooling towers at the Susquehanna SES (SSES) associated with power'uprate, PP&L determined that there will be no adverse effects to the river flow or river biota. This conclusion is based on two factors. First, the projected number of fish
r l
0 I ~
~ % ' aa
ATTACHMENT2 TO PLA-4173 FILES A17-2/R41-2/ PLA4092 P88-1 Mr. C.L. Miller l
estimated to be impinged per day would increase from 20 to 21 and the number of larvae estimated to be entrained would increase by only 13,000 to 363,000 per day.
Biologically, these estimated increases represent a negligible impact to the river ecosystem. Second, the maximum cooling tower blowdown flow after power uprate is estimated to increase by only 5% which mounts to 500 gpm. This amounts to less than
~ 5% of the average river flow.
Identify the change in the temperature of the cooling water blowdown.
The cooling blowdown from the cooling tower basin is through a diffuser into the river.
The characteristics of the cooling tower are such that there is greater air flow through the tower'caused by the higher circulating water return temperature at power uprate conditions. This increased air flow removes the additional heat load resulting in neglige ble cooling tower basin temperature changes.
Discuss any adverse impacts on the terrestrial environment due to the additional drift omissions from the cooling tower on local soils and vegetation.
Estimates, assuming that both SSES cooling towers are operating at the original 100%
power~ level for a year, would result in 58,000 pounds of solids per year as salt drift, spread over a large area. Modelling indicated the heaviest localized deposition of solids would be 3 pounds/acre/year (SSES Environmental Report Section 5.3.4). The power uprate should have no impact on these estimates, especially with the conservatism built into the model by assuming 100% capacity factor. Note also that the design cooling tower drift is a function of circulating water flow which is not changing for power uprate.
Studies on the possible effects of salt drift have been conducted at the SSES since 1977.
These studies have included monthly examination of natural vegetation during the growing season (1977 to date), annual quantitative vegetation studies (1977 to date), a two-year study on the effect of simulated salt drift on corn and soybeans (1985-86), and annual forest inspections since 1982.
l The rqonthly examinations have utilized several transects (salt drift transects) in the vicinity of the power station for possible salt damage to natural vegetation and incidence of parasitic plant diseases. The annual vegetation studies consider possible long-term changes in forest utilized salt spray approximating the composition of the cooling tower drift from the SSES at "worst case" concentration on agricultural crops in two fields.
None of the studies have found evidence for damage to agricultural cropsor natural vegetation from salt drift. It should be noted that the water used at the SSES (from the Susquehanna River) does not contain the same salts as brackish water used at estuarine cooing tower; its effects are more like plant micronutrients. The natural vegetation studies
ATTACHMENT2 TO PLA-4173 FILES A17-2/R41-2/ PLA4092 P88-1 Mr. C.L. Miller over 15 years have found no salt drift damage and plant diseases in accordance with host presence and location. The simulated salt drift studies utilized concentrations estimated at 5 and 10 times maximum salt drift concentration in the SSES plume. It is therefore unlikely that salt drift damage would occur from an approximate 5% consumptive rise in water, usage.
Identify any changes in cooling tower water chemistry and intake canal velocity.
ThereIwill be no changes to the cooling tower water chemistry as a result of power uprate. The pre-uprate levels of cycles of concentration will be maintained. Since there will be a 5% increase in blowdown flow, there will be a 5% increase in chemical discharge to the river.
The velocity of the intake water will increase by 5% to .37 A/sec with power uprate which is below the recommended intake design velocity of 0.5 ft/sec.
Address any increased noise levels attributed towards power uprate.
Sound level monitoring was conducted at both near site (less than 1 mile) and far site locations (greater than 1 mile) from the Susquehanna SES site from 1972 and 1985. This survey was conducted prior to and during construction and during one and two unit operation. The two Cooling Towers were identified to be one of the major site noise sources. The cumulative effects of all noise sources associated with station operation were determined to be less than the U.S. Environmental Protection Agency recommended day-night equivalent sound level limit of 55 dBA at all monitoring locations. It is not expected that this level will be exceeded at any of the locations with the 'possible exception of an area approximately 2,200 feet southeast of the Cooling Towers where the measured sound level including a nighttime weighting factor of +10 dBA was 54 dBA.
Sound levels will be monitored at power rate conditions.
Discuss any changes to thc river water discharge flow rate, velocity, temperature or thermal plume, or chemical composition due to power upratc. Also address thc effects of power uprating on the National Pollutant Discharge Elimination System (NPDES) permit.
As indicated previously, water discharge flow from power uprate may increase 5% above the design discharge rate to 10,800 gpm. This is well below the maximum flow of 16,000 gpm reviewed in the SSES Environmental Report (Table 3.3-1) and, therefore, the additional flow from power uprate is not considered to be an adverse impact to the river.
'I I
0 0
ATTACHMENT2 TO PLA-4173 4 FILES A17-2/R41-2/ PLA4092 P88-1 Mr. C.L. Miller At the Susquehanna SES cooling tower blowdown discharges into the river through a diffuser pipe located on the river bottom. Velocity of this discharge was calculated in Appendix G, Thermal Discharge, Response 1, pages THE-1.1 and 1.2 of the Environmental Report. Water discharges through 72-4" ports into the river. The velocity associated with a 10,000 gpm discharge was'calculated to be 5.83 fps and rounded to 6 fps. This rounded off value was used when preparing SSES Environmental Report. The velocity associated with a 10,800 gpm discharge is also approximately 6 @s.
Thermal plume studies conducted in the fall, winter, and spring of 1986-87 indicated a maximum temperature rise of 1'F within an 80 foot mixing zone from the diffuser pipe.
Present Pennsylvania Department of Environmental Resources water quality criteria states that ambient river temperature rise from thermal discharges shall not cause the temperature in the receiving water body to rise more than 2'F in one hour. The thermal discharges from the cooling tower blowdown from power uprate will not exceed this water quality criteria.
Chemical composition of the blowdown after power uprate will not exceed the NPDES permit limits.
- 2. Plant Fuel Management System The increase in spent fuel pool heat load is due to thc proposed increase in power level and the use of high density spent fuel storage racks. Address any environmental impacts from the releases of the radioactive materials.
The environmental impacts from radioactive materials releases have been reviewed both in the FSAR and Environmental Report. Power uprate will not significantly change the quantities previously evaluated.
Environmental impacts from releases of radioactivity are discussed in PP&L Licensing Topical Report NE-092-001, in Sections 8.6.1 (Radiation Levels) Normal Operation, 8.6.2, (Radiation Levels) Post-operation and Accident and 9.2, Design Bases Radiological
'ccidents.
Discuss any changes in the liquid radwaste quantities or activity levels due to the proposed power uprate.
Liquid radwaste throughput may increase up to 5% to a level which is within the processing capability of the system.
ATTACHMENT2 TO PLA-4173 FILES A17-2/R41-2/ PLA4092 P88-1 Mr. C.L. Miller The activity levels of some radwaste streams containing coolant activation products may increase up to 10%, due to the 4.5% core flux increase and a 5% crud increase to the reactor which are assumed to occur.
Since the power uprate level of 3441 MWt is not significanly different from that analyzed previously, it is not anticipated there will be a significant increase in radiological effluents. Also, pre-power uprate technical specification limits will be maintained.
- 3. Other Systems Discuss any significant increase due to the proposed power uprate in the makeup require'ments for the reactor coolant system, component cooling water system, condensate and feedwater system, turbine plant cooling system, auxiliary steam system, water treatment plant, and the fire protection system.
There is no significant increase in makeup requirements for any of the systems listed.
The reactor coolant and feedwater systems will operate at a slightly higher pressure after power uprate so that any incidental leakage from these systems will increase. Incidental leakage from these systems has historically been small, and the increase will be less than two percent, thus the increase will not be significant with respect to the ability of the makeup capability of the water treatment plant. The leakage from the reactor coolant system is monitored and regulated by a plant technical specification. The plant technical specification value does not change for power uprate thus total allowable leakage will be unaffected.
The only affect of power uprate on the component cooling water system and turbine plant cooling water system from power uprate is an increased heat load; inventory makeup is not affected.
Makeup requirements for the auxiliary steam system and the fire protection system are unaffected by power uprate.
Identify if there are any changes needed to the environmental protection plan.
There are no changes required to the Environmental Protection Plan for the Susquehanna SES. Chapter 3, Consistency Requirements, Section 3.1, Plant Design Operations, of this plan discusses how proposed changes need to be addressed. Through the PPEcL Unreviewed Environmental Question Program, changes such as that of power uprate will be reviewed.
ATTACHMENT2 TO PLA-4173 FILES A17-2/R41-2/ PLA-4092 P38-1 Mr. C.L. Miller Should you have further questions, please call Mr. W.W. Williams at (610) 774-5610.
Very truly yours, (Signed) R. G.. BYRAM R. G. Byram cc: NRC Document Control Desk (original)