ML18005A335
| ML18005A335 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/22/1988 |
| From: | Watson R CAROLINA POWER & LIGHT CO. |
| To: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML18005A336 | List: |
| References | |
| NLS-88-043, NLS-88-43, NUDOCS 8803160244 | |
| Download: ML18005A335 (3) | |
Text
~
REG LATORY INFORMATION DISTRIB 'ON SYSTEM (RIDS) 1 ACCESSION NBR: 88031OB0244 DOC. DATE: 88/02/22 NOTARIZED:
NQ FACIL: 50-400 Shearon Harris Nuclear Power Plant>
Unit 1> Carolina AUTH. NAME AUTHOR AFFILIATION WATSON> R. A.
Carolina Poujer 5 Light Co.
RECIP. NAME RECIPIENT AFFILIATION VERRELLI> D. M.
Region 2>
Ofc of the Director~ ~~a&
SUBJECT:
Forwards listed documents in response to 880204 request re 880307-11 planned insp of plant environ qualification program.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED: LTR I
ENCLj SIZE:
+
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Application for permit reneeal filed.
DOCKET 5 05000400 05000400
'.t "a
RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS DEDRO NRR/DLPG/PEB11B NRR/DOEA DIRiiE NRR/DREP/RPB 10A NRR/PMAS/ILRB12 OGC 15-B-18 RES/DRPS DIR EXTERNAL:
LPDR NSIC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 BUCKLEY> B E
k *
- EOD NRR MORISSEAU> D 1
NRR/DLPG/GABiOA 1
NRR/DREP /EPB 10D 2
g g NRR/DRIS DIRVA2 1
OE L3EGE N> J
~EM'~L 02 1
RGN2 FILE 01 1
1 +
NRC PDR I
COPIES LTTR ENCL I~
1 1~
5 n
5 TOTAL NUMBER QF COPIES REQUIRED'TTR 24 ENCL
~'
rt
=
t r
, ~
1I
gFPQQ Carollntt Plower S Light Company n
~
gQ FEB 2 2 1088 SERIAL: NLS-88-003 Mr. David M. Verrelli, Chief Reactor Projects Branch I Division of Reactor Projects, Region II United States Nuclear Regulatory Commission 101 Marietta Street, NW Suite 3100 Atlanta, GA, 30301 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-63 EQUIPMENT QUALIFICATIONINSPECTION
Dear Mr. Verrelli:
In a letter dated February 0, 1988Property "Letter" (as page type) with input value "05000400/LER-1986-001-03, :on 861030,turbine Bldg Stack Monitor RM-1TV-3536-1 Declared Inoperable.Caused by Personnel Failure to Complete Surveillance Testing.Personnel Instructed on Responsibilities.W/Undated Ltr"February 0, 1988" contains a sequence that could not be interpreted against an available match matrix for date components." contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., you cpnfirmed that on March 7 through 1 1, 1988, you willconduct an inspection of the Shearoh Harris Nuclear Power Plant (SHNPP)
Environmental Qualification (EQ) Program.
You requested that certain documents be provided to you two weeks prior to the inspection.
On February 12, 1988 we contacted your staff to discuss your request.
The request included documents associated with the reviews of operating reactor EQ Programs that the NRC Staff conducted during 1983.
The Harris Plant was not an operating reactor at the time and was not required to submit such documents.
Your staff concurred that such documents are not required for SHNPP.
In this letter, we provide you with the documents that are applicable to SHNPP:
l.
Pr ocedures (Attachment 1)
PLP-108, Environmental Qualification Program (10CFR50.09)
DG-VIII.30, Preparatiort and Control of SHNPP EQ Master List MOD-103, Engineering Evaluations AP-010, Criteria for Qualified Safety Reviewers AP-618, 3ustification for Continued Operation DG-VIII.19, Equipment Qualification Documentation Review Guidelines AP-609, Review of Incoming NRC/INPO Correspondence AP-031, Operational Experience Feedback AP-026, Corrective Action Program MMM-025, Maintenance Environmental Qualification Program TMM-100, Determination of Technical and QA Requirements for Procurement Document TMM-110, Receiving, Packing, Storage, and Maintenance Requirements for Spare Parts, Materials, and Components CQAD 80-1, Procedure for Corporate QA Audits OQA-201, Surveillance Program 1
R 411 Fayettevilte Street
~
P., O. Box 1551 o Aateirtn N
C. 27602 8803ih0244 880222 PDR
- DOCK 05000400 8
1 Mr. David M. Verr~
NLS-88-003 / Pageos
~
k C
AP-610, Processing Vendor Recommendations, Vendor Manual Revisions, and Equipment Technical Information AP-600, Plant Change Request Initiation TMM-002, Equipment Qualification Coordinator Responsibilities 2.
NRC Safet Evaluation Re orts (SER) (Attachment 2)
SHNPP SER, NUREG-1038, Supplement No. 3, Appendix H, Conformance to Regulatory Guide 1.97, May 1986 SHNPP SER, NUREG-1038, Supplement No. 0, Section 3.11, Environmental Qualification of Electrical Equipment, October, 1986 3.
Master List (Attachment 3)
~
Version in effect at time of inspection 0.
Environmental Parameters (Attachment 0)
FSAR Figures 3.11.0-1, 3.11.0-2, 3.11.0-3, and 3.11.0-0 FSAR Figures 3.11.6-1, 3.11.6-2, and 3.11.6-3 FSAR Appendix 3.11.B, Environmental Zone Maps FSAR Appendix 3.11.C, Supplemental Environmental Qualification of Inside Containment Safety-Related Electrical Equipment FSAR Appendix 3.11.E, Supplemental Environmental Qualification of Safety-Related Electrical Equipment Inside the Main Steam Tunnel If you have any questions, please contact Mr. Pedro Salas at (919) 836-8015.
Yours very truly,
/Zccc~~
R. A. Watson Vice President Harris Nuclear Project PS/mf (5381PSA)
Enclosures
"~ '
5 i
Cco Mr. B. C. Buckley Dr. J. Nelson Grace Mr. G. F. Maxwell Mr. Uldis Potapovs