Forwards Final Exercise Rept for 930630,full-participation Plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to DC Cook NPP
ML17334B533
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/14/1995
From: Hepler O
Federal Emergency Management Agency
To: Spessard R
NRC (Affiliation Not Assigned)
Shared Package
ML17332A690 List:
References
NUDOCS 9503080358
Download: ML17334B533 (2)


Text

qCV Mq~

q Federal Emergency Management Agency Washington, D.C. 20472 Mr. R. Lee Spessard, Director Division of Technical Support Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Spessard:

Enclosed is a copy of the final exercise report for the June 30, 1993, full-participation plume exposure pathway exercise of the offsite radiological emergency response plans site-specific to the D.C. Cook Nuclear Power Plant. The State of Michigan and Berrien County participated in this exercise. The Indiana Michigan Power Company also participated. The final exercise report was prepared by the Federal Emergency Management Agency (FEMA) Region V staff.

A copy of this report will be provided to the State of Michigan by the FEMA Region V staff.

There were no Deficiencies or Areas Requiring Corrective Action identified during the June 30, 1993, exercise.

Based on the results of the June 30, 1993, exercise, the offsite radiological emergency response plans and preparedness for the State of Michigan and affected local jurisdiction, site-specific to the D.C. Cook Nuclear Power Plant can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site. Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological emergency response plans and preparedness for the State of Michigan site-specific to the D.C. Cook Nuclear Power Plant, granted on September 28, 1983, will remain in effect.

If you should have any questions, please contact Dr. Anne Marie T.

SuPrise, Chief, State and Local Regulatory Evaluation and Assessment Branch, at (202) 646-4065.

Sincerely,

0. Meg Director Hepler, III Exercises Division Preparedness, Training, and Exercises Directorate Enclosure ATZACHMENT