Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
ACCESS ION NBR: 9312020446 DOC. DATE: 5'3/1 1/24 NOTARIZED: YES DOCKET 0 FACIL.: 50-315 Donald C. Cook Nuclear Powe> Planti Unit li Indiana M 05000315 50-316 Donald C: Cook Nuclear Power Planti Unit'i Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICV i E. Indiana Mi chigan Power Co. < formeT lg Indiana 0 Michigan Ele REC IP. NAMF REC lP I ENT AFF IL I ATION MARTINi d. B. Document Control Branch <Document Control Desk)
SUBJECT:
Responds to NRC 930809 ltr re vioiation noted in repts 50-315/9'3-15 u 50-316/V3-15 on 930607-18. Corrective actions:
changed maint head in"truction.
DISTR;IBUTION CODF: IE01D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: General <50 Dkt)-Insp Rept/No ice of Violation Response NOT>ES:
RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL iD CODE/NAME LTTR ENCL PD3-1 PD 1 WETZELi B 1 1 INTER>4AL: AFGD/DE IB 1 1 AEOD/DSP/RQAB 1 AEQD/DSP/TPAB 1 AEQD/TTC 1 DEDRO 1 1 NRR/DORS/OEAB 1 1 NRR/DRCH/HHFB 1 1 NRR/DR I L/RPEB 1 NRR/DRSS/PEPB 1 1 NRR/PMAS/ILPB1 1 1 NR 8/P MAS/ I LP B2 1 1 NUDQCS-ABSTRACT 1 1 F -Dj 1 OGC/HDS2 1 1 RjZ F IL 02 1 RES/HFB 1 RGN3 FILE 01 1 1 EXTEPNAL: EGSG/BRYCE. J. H. 1 1 NRC PDR NSIC 1 1
>NOTE TO A! L R>DS RECIP]EN; S:
PLEASE HEL? US TO REDUCE >'>'ASTE! CON j ACT THE DOCUMENT CONTROL DESK.
ROO'! Pl-~7 (EXT. 5<)~->065) TO E}!M!>NATEYOUR >KAME FROM D!STRIBUTlO>b LtSTS FOR, DOCUMENTS YOU DOiN'T YEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
Inmana M(chigan Power Company P.O, Box 16631 Columbus, OH 43216 fR5%RA A'O'E8&ILM
~'e"erER AEP:NRC:1184El 10 CFR 2.201 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC INSPECTION REPORTS NO. 50-315/93015 (DRS)
AND 50-316/93015 (DRS)
REVISED REPLY TO NOTICE OF VIOLATION U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attn: Mr. J. B. Martin November 24, 1993
Dear Mr. Martin:
This letter is in response to a verbal request from H. A. Walker of the NRC Region III staff to G. A. Weber with regard to our response (AEP:NRC:1184E, dated September 7, 1993) to your letter dated August 9, 1993, which forwarded a Notice of Violation. The Notice of Violation resulted from a routine, announced inspection of maintenance activities conducted by H. A. Walker, M. K. Khanna, W. D. Pegg,'nd DE L. Schrum on June 7 through 18, 1993.
Mr. Walker's verbal request was with regard to the response provided for Violation I associated with inadequate procedures and procedure compliance.
Our response was perceived as having forced the procedure to comply with our practice, and continuing to allow the actual interval between consecutive performances of a given preventive maintenance task to be extended beyond the required interval. This was not our intention. With the intention of addressing Mr. Walker's request, our revised reply to Violation I in the Notice of Violation is provided in the attachment to this letter.
This letter is submitted pursuant to 10 CFR 50.54(f) and, as such, an oath statement is attached.
Sincerely, Vice President 9312020446 931124 PDR ADOCK 05000315 8 PDR
Mr. J. B. Martin AEP:NRC:1184E1 dr Attachment cc: A. A. Blind - Bridgman G. Charnoff T. E. Murley, NRC - Washington, D.C.
NRC Resident Inspector NFEM Section Chief J. R. Padgett
Mr. J. B. Martin AEP:NRC:1184E1 bc: P. A. Barrett S. J. Brewer D. H. Malin/K. J. Toth M. L. Horvath - Bridgman - w/o attachment J. B. Shinnock - w/o attachment W, G. Smith, Jr./S. H. Steinhart B. A. Wetzel, NRC - Washington, D.C.
AEP:NRC:1184E1 DC-N-6015.1
STATE OF OHIO)
COUNTY OF FRANKLIN)
E. E. Fitzpatrick, begin duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the forgoing revision to the response to NRC INSPECTION REPORTS NO. 50-315/93015 (DRS) AND 50-316/93015 (DRS) and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.
Subscribed and sworn to before me this 19 N TARY PUBLIC DOROTHY 0. GROSSMAN NOTARY PUBLIC - STATE OF OHIO
< I 0 MY COMMISSION EXPIRES~(tl 1
ATTACHMENT TO AEP 'NRC'1184E1 REVISION TO VIOLATION I IN REPLY TO NOTICE OF VIOLATION
Attachment to AEP:NRC:1184E1 Page 1
Background
A routine, announced inspection of maintenance activities using selected portions of NRC inspection module 62700 to ascertain whether maintenance was effectively accomplished and assessed by the Donald C. Cook Nuclear Plant was conducted by Messrs. H. A. Walker, M. K. Khanna, W. D. Pegg, and D. L. Schrum from July 7 to 18, 1993.
During this inspection, three items were found to be in violation. The violations were identified with:
(1) inadequate procedures and procedure compliance (a discrepancy was identified between a procedure, MHI-5030, and the method of how the work was actually performed; explicitly, the procedure required that the interval for performing periodic preventive maintenance tasks be based on the date the task was last performed; however, the preventive maintenance task program is configured to set this interval based on the date when the maintenance work package was closed rather than the date the preventive maintenance task was last performed);
(2) inadequate document control (out of date maintenance head instruction procedures and indices were found to be in use in the Safety and Assessment library); and (3) failure to adequately maintain safe shutdown lighting (approximately a dozen emergency battery lights out of 221 were found to be aimed incorrectly or otherwise not functional).
These violations were set forth in a letter containing the notice of violation dated August 9, 1993 from Mr. Geoffrey C. Wright, Chief, Engineering Branch. The letter was received August 11, 1993, Our response to the notice of violation is contained in the attachment to our letter AEP:NRC:1184E, dated September 7, 1993.
Mr. H. A. Walker contacted G. A. Weber, Superintendent, Plant Engineering at Cook Nuclear Plant, to identify his concerns with our response to I
Violation in the above letter. Our response was perceived as having forced the procedure to comply with our practice, and continuing to allow the actual interval between consecutive performances of a given preventive maintenance task to be extended beyond the required interval. This was not our intention.
With the intention of addressing Mr. Walker's request, our revised reply to Violation I in the Notice of Violation is provided in the remainder of this attachment.
Attachment to AEP:NRC:1184El Page 2 NRC Violation I "10 CFR 50, Appendix B, Criterion V states that activities affecting quality shall be prescribed by documented instructions or procedures, or a type appropriate to the circumstances and shall be accomplished in accordance with these instructions or procedures.
Procedure MHI-5030, "Preventive Maintenance Program", Revision 13, with change sheets 1 through 5, paragraphs 4.13 and 6.3.2.A, required that the interval for performing periodic preventive maintenance tasks be based on the date the task was last performed.
Contrary to the above, from January 1993 to June 9, 1993, preventive maintenance task intervals were based on the date when the maintenance work package was closed rather than the date the preventive maintenance task was last performed.
This is a Severity Level IV violation."
Response to Violation I sso o De a o te eedVo o Indiana Michigan Power admits to the violation as cited in the NRC Notice of Violation.
- 2. easo s for the Violet o Starting in January, 1993, preventive maintenance (PM) tasks have been scheduled via use of a computerized work control system. Under this system, PM tasks are automatically rescheduled based on the date the associated job order is administratively closed, not the date the PM activity is completed.
Normally, the job order close-out date is very close to the PM activity completion date. However, jobs requiring significant restoration activities, such as installation of insulation or removal of scaffolding, can delay close-out of the job order, and thus, the rescheduling of the PM tasks. This has the undesired effect of extending the period between consecutive PM tasks beyond the period established by the PM program. The plant staff was aware of the rescheduling problem, but at the time of the inspection had not yet identified an effective solution. Furthermore, the problem was not recognized as a procedural violation, and, therefore, it had not been reported via the plant's corrective action reporting system.
Attachment to AEP:NRC:1184E1 Page 3 The PM tasks affected by this rescheduling problem did not involve, any Technical Specification surveillance tests, nor were they considered mandatory for the continued operability of safety-related equipment.
- 3. Co rective Actions Taken a d Results Achieved To address the immediate short-term issue of procedural non-compliance, the maintenance head instruction (MHI-5030) has been changed to allow the use of the job order completion date for scheduling of the next PM task. This change to MHI-5030 allows the task interval to be based on the date the work package is closed, and brings the scheduling process in full compliance with the procedure requirements.
To ensure that the task interval will not be extended in situations where restoration activities and administrative closeout of the job order do not occur promptly following completion of the PM task itself, modifications to the work control system software have also been completed. These changes will allow preventive maintenance specialists to overwrite the computer generated PM task "next required date".
PM specialists will monitor the status of open PM job orders to identify those jobs which will require this action to be taken.
A memo has been issued to the plant staff reinforcing the importance of timely completion of restoration and closeout activities.
- 4. Co ect ve Act o s Taken t Avo d Fu t e V o at ons Plant Manager Instructions and Procedures (PMI-5030 and PMP 5030.001.003) have been issued to improve the overall structure of the PM program and assignment of responsibilities.
PM tasks which are scheduled to be performed during non-outage periods are currently in the process of being realigned with their associated Functional Equipment Group (FEG) so that their due dates will coincide with the start of the week the FEG is scheduled to be worked. (All plant FEGs are scheduled on a 12-week rolling schedule.) The manner in which the software sets the next required date is also being modified such that the "next required date" will remain in alignment with the appropriate future FEG work date. When this realignment process is complete, the "next required date"
Attachment to AEP:NRC:1184E1 Page 4 calculation will be totally independent of gob restoration and closeout activities, thereby eliminating the need for close monitoring of open job order status and manual intervention to correct PM task intervals.
Additional software changes are under study to more efficiently handle those PM tasks that are not FEG based.
- 5. Date Whe Co liance w be Ach eyed Pull compliance was achieved with the issuance of Change Sheet 7 to MHI-5030, Revision 13, and the modifications to the work control system software, both of which were completed prior to or on September 16, 1993.