LER 87-004-00:on 870323,discovered That Spectrum Analysis Not Done for Three Grab Samples Taken on 870320 from Turbine Bldg Sump & Condenser Area Sump.Caused by Personnel Error. Event Discussed W/Chemistry personnel.W/870420 Ltr
ML17300A781
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/20/1987
From: Bradish T, Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
192-00188-JGH-T, 192-188-JGH-T, LER-87-004, LER-87-4, NUDOCS 8704280612
Download: ML17300A781 (8)


Text

REQULATO NFORMATIOf'< DISTRIBUTION EI'I (R IDS) 1 ACCESSION NBR: 8704280612 DOC. DATE: 87/0'./20 NOTARI7ED: NO -

DOCKET ¹

)

FAC IL: STN-50-528 Pal o Verde Nuc I eav Station> Uni+ 1> Ari zona Pub li 05000528

  • UTH. NAI'1E AUTHOR AFFILI*T T. R. Ari zona Nuc leav Pouer Pro gee t ( f ormef lg Ar i zona Pub l ic Serv IO."'RADISH>

HAYNES> J. G. *rizona Nucleav Po> ev Prospect (formerly *v i zona Public Sevv REC IP. NAI'1E REC IP I ENT AFF I L I*TIO'A SUB JECT: LER 87-004-00: on 870323> discovered that spectv um analysis not done for thv'ee gv ab samples taken on 870320 Prom tuv bine bldg sump Zc condensev av ea sump. Caused bg pev sonnel ev v or.

Event'iscussed w/chemistry pev'sonnel. W/870420 l tv .

DISTRIBUTION CODE: I E22D COPIES RECEIVED: LTR ENCL . SI ZF-:

TITLE: 50. 73 Licensee Event Repov't (LER) Incident Rpt> etc. >

NOTES: Standav dized plant. M. Davis> NRR: 1Cg. 05000528 RECIPIENT COPIES RECIP I ENT COP IES lD CODE/NAME LTTR ENCL ID CODE/NAME LTTR Ef;'C L PD5 LA 1 1 PD5 PD 1 L ICITRA> E l 1 DAVIS> M } 1 INTERNAL: ACRS MICHEI SON 1 1 'ACRS MOELLER 1 1 AEOD/DOA 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 NRR/DEST/ADE 1 0 NRR/DEBT/ADS 0 NRR/DEST/CEB 1 .1 NRR/DEST/ELB 1 t!RR /DEST/ I CSB 1 1 NRR/DEST/MEB 1 1 t!RR/DEST/MTB 1 NRR/DEST/PSB 1 titRR/DEST/RSB 1 NRR/DEST/SQB 1 1 ERR/DLPG/HFB 1 1 NRR/DLPG/GAB 1 1 NRR/DOEA/EAB 1 NRR/DREP/EPB 1 ttRR/DREP/RAB 1 NRR/DREP/RPB 2 2 :R / ILRB 1 NRR/PI'1AS/PTSB 1 E FIL 02 1 1 RES SPEIS T 1 1 R; FILE 1 EXTERNAL: EQ8cQ QROH> M 5 5 H ST I OBBY WARD 1 LPDR 1 tiRC PDR 1 1 NSIC HARRIS> J 1 tMSIC MAYS> G 1 NOTES:

TOTAL NUMBER OF COPIES.REQUIRED: LTTR 43 ENCL

NRC Form 344 U.S. NUCLEAR IIEOULATOAYCOMMISSION (4 43)

APPROVED OMS NO. 31500)OC LICENSEE EVENT REPORT ILER) EXPIRES: 5/31/54 FACILI'TY NAME III DOCKET NUMSER 12) PA TITLE I ~ I 0 5 0 0 0 52 8 g PF02 Hissed Sam le Anal sis Due To A Co nitive Personnel Error EVENT DATE (5) LER NUMBER Lb) REPORT DATE (7) OTHER FACILI'TIES INVOLVED LSI MONTH DAY YEAR YEAR gg SEQUENTIAL Revs~ MONTH DAY YEAR FACILITY NAMES DOCKET NUMBER(3)

NUMSEII NUM44 R 0 5 0 0 0 0 04 4 2 0 8 7 N A THIS REPORT IS SUSMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR g: (Check one or more 0 5 0 0 0 OPERATINO ol tne followinol (Ill MODE (4) 20.402(4) 20A05(cl 50.73(e) (2) (lr) 73.7)(II)

POWER 20.405(eHII(0 SOW(el)1) 50.734)(2)(rl 73.71(cl LEYEL 1 0 0 20A05(e)(1) ISI 50.34(c) (2) 50.73(e) (2) 45) OTHER (Specrly ln Aprtject t>>row cert In Test. IYRC Form 20A05(e) (1(45) 50.73(e) (2) lr) 50.73(e l(2) IrIII)(Al Sr)SAJ 20A054) (I ) Sr) 50.734)(2IISI 50.734) (2I(rrbl(SI 20.e054) (I)(r) 50.734) (2) I IS) 50.73(e)(2)(e)

LICENSEE CONTACT FOR THIS LER (12)

NAME TELEPHONE NUMBER AREA CODE T. R. Bradish, Compliance Supervisor (Ext. 6936) 602 932 -530 0 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCAISED IN THIS REPORT (13)

CAUSE SYSTEM COMPONENT MANUFAC. AEPORTASLE Uccc SYSTEM MANUFAC. EPORTASLE TURER TO NPADS !3e!$ rgrFj~jegg! Cc COMPONENT TUAEA TO NPADS gg<'g<</AND IP P

,(?~$p(k~)e;N1PN?.~

Nj(NIP SUPPLEMENTAL REPORT EXPECTED (Ie) MONTH OAY YEAR EXPECTED SUSMISSION YES lll yeL COmpiere EXPECTED SrlbetISSIDH DATE) NO DATE (15)

ASSTRACT (Limit to te00 u>>cer, I.eepprosimerely Ijlreen rlnole rpece rypewnrten lintel (14)

At approximately 1214 MST on March 23, 1987, Palo Verde Unit 1 was in Mode 1 (POtltER OPERATION) at 100 percent power when a review of the spectrum analysis results for the daily grab samples required by Technical Specifications 3.11.1.1, Table 4.11-1, revealed that three grab samples had not been analyzed. At approximately 0830 HST on March 20, 1987, the turbine building sump sample and the condenser area sump samples were drawn. A chemistry technician delivered the samples to the Unit 2 counting lab for analysis due to the inoperability of the Unit 1 analysis equipment. The unanalyzed samples were apparently placed with samples that had-already been analyzed. The turbine building sump sample and condenser area sump samples were not analyzed.

The root cause of this event was a cognitive personnel error by the Unit 1 chemistry technician (utility non-licensed) in that he did not ensure that the Unit 1 samples were analyzed. As corrective action the responsible individual received appropriate disciplinary action. Additionally, this event was discussed with Unit 1 Chemistry personnel,.

No similar events have been reported.

87pp20 870P280b1 ~ 05000528 PDR +DOC~ PDR 8

NRC eorm 344

I ~

g 4

f V.

W tf I

l I

IIRC Fo/m 344A 19413) U.S. NUCLEAR REOULA'TORY COMMISSION LICENSEE EVENT REPORT ILER) TEXT CONTINUATION APPROVED OMS NO 3150 0104 EXPIRES: 8/31/99 FACILITY NAME 111 DOCKET NUMSER Ill LER NUMEER ISI PACE ISI YEAh '.wÃv: SEOVENTIAL hEVI5ION IoIF NVM 4 h HVM Sh Palo Verde Unit TEXT /// moro oooco /4 rooo/PNL ooo 1

akWoW /YRC Form JOSA'Fl 1171 0 5 0 0 0 5 8 7 004 00 02 OF 0 2 At approximately 1214 MST on March 23, 1987, Palo Verde Unit 1 was in Mode 1 (POWER OPERATION) at 100 percent power when a review of the spectrum analysis results by a chemistry technician (utility non-licensed) for the daily grab samples required by Technical Specifications (T.S.) 3.11.1.1, Table 4.11-1, revealed that three grab samples had not been analyzed. The unanalyzed samples were the turbine building (NM) sample and two (2) condenser area sump samples. These samples were drawn at approximately 0830 MST on March 20, 1987. The review on March 23, 1987, showed that the samples were correctly taken and analyzed at the next scheduled frequency on March 21, 1987. Analysis results were within T.S. limits. The event lasted approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Prior to this event, all grab samples drawn in Unit 1 were being sent to Unit 2 for analysis due to the inoperability of the Unit 1 counting equipment.

At approximately 0830 MST on March 20, 1987, the turbine building sump sample and the condenser area sump samples were drawn. A chemistry technician (utility non-licensed) delivered the samples to the Unit 2 counting lab for analysis.

The unanalyzed samples were apparently placed with samples that had already been analyzed. The turbine building sump sample and condenser area sump samples were subsequently overlooked and not analyzed.

The root cause of this event was a cognitive personnel error by the Unit 1 chemistry technician (utility non-licensed) in that he did not ensure that the Unit 1 samples were analyzed. Not analyzing samples required by T.S. is contrary to approved Administrative Control procedures. As corrective action the responsible individual received appropriate disciplinary action.

To prevent recurrence a briefing session was held with the Unit 1 chemistry technicians explaining the event and reminding the technicians of their responsibility to meet Technical Specification requirements. Additionally, this event will be discussed with Unit 2 and 3 technicians. As an aid to the chemistry technicians, a "Current Chemistry Technical Specification Action Statement" form was developed. This form will be prepared daily and will contain information as to what samples are required and when they need to be taken to meet the appropriate Technical Specification Action statements. The form will also list when samples were taken and when sample analysi's was completed.

There were no unusual characteristics of the work location which contributed to this event. There were no automatic or manual safety system responses.

There were no structures, systems or components inoperable, prior to the event, other than described above, which contributed to the event. There were no operator actions which contributed to this event.

A review of the results of the grab samples taken prior to and following the unanalyzed samples showed all were within the release limits specified in T.S.

3.11.1.1. There is no indication that the release limits specified in T.S.

3.11.1.1 were exceeded. This event did not affect the safe operation of the plant or the health and safety of" the public.

No similar events have been reported.

vhC IOhM 3444 I9 93>

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARI2ONA 85072-2034 192-00188-JGH/TRB/MJC April 20, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 Licensee Event Report 87-004-00 File: 87-020-404

Dear Sirs:

Attached please find Licensee Event Report (LER) No. 87-004-00 prepared and submitted pursuant to 10 CFR 50.73. In accordance with 10 CFR 50.73(d), we are herewith forwarding a copy of the LER to the Regional Administrator of the Region V Office.

If you have any questions, please contact T. R. Bradish, Compliance Supervisor at (602) 932-5300 Ext. 6936.

Very tr ly yours, Vice President Nuclear Production JGH/MJC/cld Attachment CCI 0. M. DeMichele (all w/a)

E. E. Van Brunt, Jr.

J. B. Martin R. P. Zimmerman

'R. C. Sorensen E. A. Licitra A. C. Gehr INPO Records Center

0 e~

I