ML17266A143

From kanterella
Jump to navigation Jump to search
LER 80-004/01T-0:on 800124,operating at 100% Power,Feeder Breaker from Startup Transformer 1B to 4160-volt Essential Bus B Found Open.Caused by Improper Label on Switch.Label Changed & Personnel Informed of Event
ML17266A143
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/07/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A836 List:
References
LER-80-004-01T, LER-80-4-1T, NUDOCS 8002210530
Download: ML17266A143 (4)


Text

NRC FORM 044 U. S NUC<<EAR REGULATORY COMMISSION r1 TTI LICENSEE EVENT REPORT CONTROL ELOC1c: I I I I I I Qi 'tPLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI I

~ILIA'Ll IIIOOOI-9 UCSNSEE CQQE 010101010

<<ICSHSS >NUMSEA

-OIL@~III IIIIQLAQQ S 9 L;CS.'>1$ , Y ~ 9 40 Sl <<A>

~o CON'T

""" ILLO' I 7I8 o 09 1 4 $0 41 COCKET NUMSSR dd 49 EVENT CATE AdsCIIT QA> 4 EVENT OESCRIPTION ANO SRdsaeLE CousECUENCE5 Qo While o eratin at 100! ower the feeder breaker from the 1B startu transformer to the "B" 4160V essential bus was found o en in violation of Technical S ecification 3.8.1.1 Action a. The breaker was closed within 15 minutes of this discover to corn 1 with the TS. Strick Administrative controls were implemented and the cause was investi ated. No adverse consequences resulted and this was the first occurrence of this type.

additional event descri tion for further detail.

~KS See SYSTEM CAUSE CAUSE CQMS. VALVE CQQE CQQE SVSCQQE CCMSQNENTCQQE SVSCQQS SUSCQQE

~09 9

L'-L lnIS LOS LBS IS LAJS LOAS

~~

1 IS ~ 1$ 19 20 SEQUEN'TIAL OCCAJRRENCE RESORT REVISION Q1 LER>>IO REPORT ACTION SUTUAE EVENTYEAR Q

9I

~~0 11 41'SEC.

~

IS Sl>UTQQ>YH

!4 RESORT NQ.

94

~>>

Sl

~~

~9 COO E Al . ACI>MSNT 99 HSROA TYPE

~T PRIME CQMR SI HO.

SS CQMSQHENT TAXEN AL<<TIQN LOSLJS 1$

CN SLANT L'JS METNQQ L'JS Dd

' '0NOVAS 99 40 SUSMI TTSQ L'IS L'0$

41 SQRM SUS. SUPPLIER L<JS 40

~<>

44 MANUSACTUAER 41 S

CAUSE OESCRIPTION ANO CORRECflVE ACTIONS The'1B Startup Transformer Feeder Breaker was inadvertentl o ened durin switching operations due to the breaker bein im ro erl labeled. Investi ation into a licable switchin orders and rocedures was nd te breaker has been correctl label ed and all o erat rs h e b n a 1

OOQ 1

4 4

4 S

9 AC ILITY~

STATVS LES 9

ACTIVITY

~Z Qss

~>S~

of the event and the resultin ro edure chan es.

10 CONTENT IIELEASEQ QS RELEASE

~ZQzd

.> SOWER NA IS OTHER STATUS AMQUNl'QS ACTIVITYQSS Q

~ 44 METNQQ QS QISCOVERY

~AQQI Personnel QISCQVERY QESCRISTIQN QSE Observation LOCATION OS RELEASE QSE 1 9 10 'I ~ 44 90 PERSONNEL EXPOSURES

~00 0 Qoo ~ZQ>> . NA 1 9 11 12 IS SSRSQHHEL INJURIES LCSS QS CR QAM*QE O FACILITY TYS 9 QESCRISTIQN QAS gag4 1

~ZQE 9 '0 SV4LICSTY NA NRC USE ONLY

~

0 4$ 49 90 NAMEOF ~~E~~RER ~ A Sebo man 305 552-3802

i Reportable Occurrence 335-80-4 Licensee Event Report Pa e Two Additional Event Descri tion At about 3:00 p.m. on 1/24/80 it was noted that a feeder breaker (2B4-5) from the B startup transformer to the B 4160V vital bus was open. This condition had existed since 5:00 p.m. on 1/18/80 and was not in compliance with T.S.

3.8.1.1 Action a. For 5-1/2 hours on 1/24/80 the A D/G was taken out of service for periodic maintenance without the knowledge of the condition of the "B" startup transformer. However, the surveillance requirements and time limits of T.S. 3.8.1.1. Action b were met. Also, the B D/G was tested satisfactorily on 1/18/80 and again on 1/24/80 so it was operable during the period in question as was the A startup transformer, and (except for the period on 1/24/80) the A D/G. The Startup transformer was energized from normal offsite power. The vital bus is (and was) normally energized during operation from the main generator through the auxiliary transformer. There is only local indication that the feeder connecting the two (through an automatic breaker) was de-energized. Although the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit was exceeded it must be pointed out that, when the condition was noted it was corrected within about 15 minutes.

Additional Corrective Actions In addition to the corrective actions listed on LER 335-80-4, more administra-tive control over the subject breakers has been obtained by locking the startup transformer feeder breaker enclosures and directing that no switching orders be implemented on the startup transformers without the approval of the operations supervisor until refresher training has been conducted.

Breaker 284 is intended for maintenance use only and is not remotely operable nor is there any remote position indication. The breaker and its counterpart in the A electrical train are now specifically detailed in the surveillance procedure and must be visually (locally) verified closed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.