REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDB)

ACC /SION NBR:79'10150558, 50-335 St. Lucie DOC. DATE: 79/09/28 Planti Unit ii Florida NOT*R Power D: NO

'ight DOCKET 05000335 I

WACM: h Co.

50-389 St. Lucie Planti Unit 2i Florida Power 5 Light Co. 05000389 AUTH. NAME . AUTHOR AFFILIATION WETHYs C. M. Florida Power 5 Light Co.

RECIP. NAME RECIPIENT AFFILI*TION 0'REILLY, J. P. Region 2i Atlanta'ffice of the Director

SUBJECT:

Ro 335-79-31: on 790927i during outagei GA/GC verification of installation of new safety inJection tank sample lines revealed four raceway clips welded to containment vessel wall Clips removed 0 reinstalled in proper location.

DISTRIBUTION CODE: A0028 TITLE:

COPIES RECEIVED: LTR Incident Reports J ENCL Q SI2E:

NOTES:

RECIPIENT COP IEB REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 BC Qga~<+ I 4 4 INTERNAL: REQ F 1 1 02 NRC PDR 1 1 0 2 2 11 MPA 3 3 14 TA/EDO 1 1 15 NQVAK/DANIEL 1 1 16 EEB 1 17 *D FOR ENGR 1 1 18 PLANT SYS BR 1 1 19 INC BYB BR 1 1 20 *D PLANT BYS 1 1 22 REAC BAFT BR 1 1 23 ENGR BR 1 1 24 KREQER 1 25 PWR SYS BR 1 1 26 AD/SITE ANAL 1 1 27 OPERA LIC BR 1 1 28 ACDENT ANLYB 1 29 AUX SYS BR 1 1 E JORDAN/IE 1 1 HANAUERi S. 1 1 STS GROUP LEADR 1 1 TMI-H STREET 1 1 EXTERNAL: 03 LPDR 1 1 04 NBIC 29 ACRS 16 16 ll) I t

~ ( ~j Jsdll  %-

TOTAL NUMBER OF COPIES REQUIRED: LTTR 48 ENCL 48

I e,'He tj

~ )I e 0 PP Ikg elf et et H

tl li

~ e V' ",

(tee "IU gf) f k Hti t(P . 16 eI K

Q/

.O. BOX 12B, FT. PIERCE, FL 33450 CMW-PSL Ltr. Bk. f/ 697 P t I~~ l "J i i i's IJ S gl P 0 I:i

,~YL.AH I <"

.ff

  • to QK, JHB, CAW, MGR, DAS

-'opies FLORIDA POWER 8L LIGHT COMPANY Offsite: ADS, JRB',,Cgtf,~,ILATS, REUSE K14k September 28, 1979 To: Hr. J. P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 From: Mr. C. H. Wethy, Plant Manager St. Lucie Plant DPR 67 Florida Power 6 Light Company Miami,'-Florida

Subject:

MEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORTABLE OCCURRENCE 335-79-31 This memo confirms our telephone notification of the subject 14-day reportable occurrence made on September 27, 1979 to Hr. J. Dyer of your office.

While shutdown during the recent plant outage, a QA/QC verification of installation of new Safety Injection Tank sample lines revealed that four (4) raceway clips had been welded to the containment vessel wall. The clips were approximately 1/2" X 2" in size and were employed to provide support to the 3/8" sample line. The clips were installed during the Spring, 1979 refueling outage, but were not noted to be improperly installed until completion of the modification in September, 1979.

'The clips were removed from the containment vessel wall by grinding and have been re-installed in a proper location. The wall area of the removed clips was heat-treated and non-destructively tested (PT) after heat-treating to verify wall integrity and to assure that no further action was required.

. Wet y nt Manager St. Lucie Plant QHP: esr a9'~Sr/