LER#78-037/01T-0 on 780919:during Inspec 66 Class I Longitudinal Braces on RAB Ventilation Ducts Were Found to Be Missing.Cause Unknown.Remaining Braces Will Be Installed W/In 1 Week
ML17206A478
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/02/1978
From: Beverly Sweeney
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17206A477 List:
References
LER-78-037-01T, LER-78-37-1T, NUDOCS 7810120057
Download: ML17206A478 (3)


Text

~ >> ~

NAC FOAM SEE U. S. NUCL.KAR AEOULATORY CCPiIMISSION I7 77l LlCEIVSEE EVEIVT REPORT 1 3

~li 3

""""'*'iLJ L:CKNSKE CQQE I

I'Q I I -.I

'Q I

'~Q I I Ucai45E NVMSKR I

{PLEASE PRINT OR TYSE AI.L, REOUIAKD INFOAMATIONI I I Q~l>> Q~IQ

~II UQKNsa ape I

40 sl JAP sa

~O 1

CON'T 3

I 50

"'Q 41 I I QQCXETPIUMSER 45 59 EVENT Q*TE 14 15 REPORT I

QAi 5 30 Q

-VENT DESCRIPTION ".40 PROIIAEI = CONScCUSNCSS +IO

~OI 2 I Durin s stem inspections, 66 CEass I Longitudinal Braces on the RAB Ventilation Ducts were found to be missing. Radial restraints are roperly installed. The affected safety related ventilation systems are 5 onl re uired in the event of a LOCA. A preliminary engineering evaluatio by our AE indicates that existing restraints are capable of sustaining the additional loads durin a design bases seismic event.

~Q

~o 1 013 SY'KT4'4 cAvSK cAUse VALVE C OK CQQE Stl5CQOE CCMPQNENTCQQE svaccQK suacoQK 1 5 IauUQ LJQ 9 IO I I LuQ I'2 IJ ls mQ

'l9 LRQ 20 SEQVENTI*L QCCVRREiVCK REPORT REVISION '

I '12 22 24 15 21 25 29 JO 22

  • T.ACIIMENT ACTION PVTVRE EP4ECT SHUTQOWN Q 4PRO4 PRI4 E Ca>P, COUPON Ii.$aQ ACTION CN PLANT 4ETI4QO LUBE IJQ HQUAs sv9 ITT o pcRMsvs.

ilQ LEXIS svppUER MANUSA vR KNi'A)CKN R

J4 LJQ LJQ

>>5 25 31 LJQ.

42 44 41 CAUS" OcSCRIP ION ANO CORRSCTIVc ACTIONS Q27 Q The cause for the missing braces is not fu 1 ly known at this time. A i

further re ort will be forwarded when the exact cause is known. Install-ation of the missin braces is resentl in ro ress on an expedited basis with about 90% of the braces installed. The remaining braces will be

'OO LJQ

~!Is ~z 1

3 a

9 94cll.l .Y STATUS>>o PQ'1IER ACTIVITY O22

~l"'~

installed within one week.

IO CQNTKNI'ELEASKO OS RELEASE

~z08 IO II I2 IS OTIIERSTATVK AMOVNTOS ACTIVITYOKS NA Q

44 44

~CQI SPECIAL INSPECTION 4$

45 NA LOCATIQV OS RELEASE O2<

30 psRsQNNEL axposvRES 4VMSER TYPE 055CRIPTIOPI 9>>

~oi 0 o II Oi~zQ I2 IJ 1 30 PERSCNHEL INJL'RIES VUMSER KSCRIPTICNQI

~00 9

I 0 iQn II I'1 NA 1 3 SS QP CR 0AM*OK .i2 94C;U~

"ESCRIPTIQN O42 1 3

~Q2 :0 NA 30 PUKUCl .Y 0

~

5$ IJKO Nte QESCSIPT:CV Q NA NAC USc ONLY L

1 :0 oa 30 NAMS OF PscFARER Brian Sweene (305) 465-3550 78'P(A!2!4~7

~

REPORTABLE OCCURRENCE 335-78-37 LICENSEE EVENT REPORT PAGE 1%0 Additional Event Descri tion The system inspections were being conducted to verify plant "as built" design drawings. The affected safety related systems, Control Room Ventilation, Emergency Core Cooling Systems Area Ventilation (including portions of the Reactor Auxiliary Building Ventilation supply system), and Shield Building Ventilation are only required in the event of a LOCA. In order for them to possibly fail to fulfilltheir functions an earthquake would also have to occur. The probability of these two events occuring in the near future is extremely low. A preliminary engineering evaluation performed by the AE has determined that the existing ventilation duct retraint system on the safety related system in question is capable of sustaining the additional loads imposed upon it due to the absence of the 66 missing longit-udinal braces during a design bases seismic event. Other ventilation systems in containment and shield building do not require the .longitudinal braces so are not ',a concern.

4~

Cause Descri tion

'dditonal il It appears that there was a communication error between the AE and a subcontractor concerning responsibility for install-ing the braces. A follow-up report will be forwarded when the exact cause is known.

~ r~

T