Letter Sequence Other |
---|
|
|
MONTHYEARL-MT-16-024, Flood Hazard Reevaluation Report2016-04-21021 April 2016 Flood Hazard Reevaluation Report Project stage: Request ML16145A1792016-05-12012 May 2016 Response to Post-Fukushima Near-Term Task Force (Ntif) Recommendation 2.1. Flooding - Flood Hazard Reevaluation Report Project stage: Request ML16152A1252016-06-0707 June 2016 Nuclear Regulatory Commission Plan for the Audit of Northern States Power Company Minnesota'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Monticello Nuclear Generating Plan Project stage: Other ML16248A0032016-09-16016 September 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ML16245A7202016-09-16016 September 2016 MSFHI Tables Final 8-31-2016 Project stage: Other ML16323A3292016-09-23023 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information Project stage: Other L-MT-17-015, Mitigating Strategies Flood Hazard Assessment (MSA) Submittal2017-03-28028 March 2017 Mitigating Strategies Flood Hazard Assessment (MSA) Submittal Project stage: Other L-MT-17-024, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Focused Evaluation2017-04-0303 April 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Focused Evaluation Project stage: Request ML17096A4432017-04-18018 April 2017 Audit Report Relating to the Flood Hazard Reevaluation Report Project stage: Other ML17104A3102017-04-24024 April 2017 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other 2016-09-23
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24022A0212024-01-20020 January 2024 NRR E-mail Capture - Monticello - Request for Additional Information ISI RR-002 Alternative to Use IWB-2500(f) ML23353A0742023-12-19019 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Proposed Alternative VR-09, Modifications to OMN-17 ML23348A3462023-12-14014 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML23268A0292023-09-20020 September 2023 SLRA - Requests for Confirmation of Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23249A2092023-09-0606 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23237A4822023-08-25025 August 2023 SLRA - Request for Additional Information - Set 3 - Email from Marieliz Johnson to Shawn Hafen ML23228A1212023-08-16016 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request VR-11 for MO-2397 ML23227A2182023-08-15015 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request RR-002 to Use IWB-2500(f) ML23219A1072023-08-0707 August 2023 SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23200A3502023-07-19019 July 2023 SLRA - Requests for Additional Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23172A1122023-06-21021 June 2023 SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23054A3322023-02-23023 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for ISI Program Code of Record ML23053A1362023-02-13013 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for Cisi Program ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML23004A1982023-01-0404 January 2023 NRR E-mail Capture - Draft Request for Additional Information Monticello Nuclear Generating Plant Request Pr 08, HPCI Pump Quarterly Testing ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package ML22181A1962022-06-24024 June 2022 NRR E-mail Capture - Draft RAI Monticello Alternative VR-08 ML22175A1602022-06-24024 June 2022 NRR E-mail Capture - RAI Monticello Fuel Oil Storage Tank Inspection ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22123A2822022-05-0303 May 2022 NRR E-mail Capture - Request for Additional Information Monticello Alternative VR-10, EFCV Testing Frequency ML22101A0712022-04-11011 April 2022 NRR E-mail Capture - Monticello - Acceptance of Requested Licensing Action License Amendment Request to Revise TS 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency ML22089A1302022-03-30030 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Related Excess Flow Check Valve Testing Frequency ML22082A1812022-03-23023 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-08 Alternative to Adopt ASME OM Code Case OMN-28 ML22075A2612022-03-16016 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-07 Alternative Related to MOV Testing Per ASME OM Code Case OMN-26 ML22067A2032022-03-0808 March 2022 Audit Plan to Support Review of an Amendment to Transition to Atrium 11 Fuel (Redacted) ML22011A0642022-01-11011 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Support Diesel Generator Fuel Oil Storage Tank Inspection ML22005A3612022-01-0505 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pump Vibration Testing Per ASME OM Code Case OMN-22 ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21330A0382021-11-18018 November 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related RHR and RHRSW Pump Testing ML21286A7882021-10-0606 October 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Residual Heat Removal Heat Exchanger Flow Control Valve Stroke Timing ML21256A1892021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Testing the Control Rod Drive Scram Discharge Header Check Valves ML21256A1862021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to HPCI and RCIC Pump Testing ML21256A1882021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Vibration Testing Range for the Sblc Pumps ML21253A2002021-09-10010 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pressure Isolation Valve Testing ML21252A0132021-08-31031 August 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt Advanced Framatome Methodologies ML21130A3022021-05-0707 May 2021 Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System ML21110A7042021-04-20020 April 2021 Response: Monticello Nuclear Plant Outage - Covid Risk to On-Site Employees ML21084A2522021-03-24024 March 2021 NRR E-mail Capture - Revised Review Schedule for Monticello TSTF-505 (EPID L-20200LLA-0062) ML21068A2772021-03-0909 March 2021 NRR E-mail Capture - Monticello TSTF-505, Request for Additional Information ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20342A1782020-12-0707 December 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-564 Safety Limit MCPR ML20302A1972020-10-26026 October 2020 NRR E-mail Capture - Monticello Request for Additional Information TSTF-505 License Amendment Request ML20289A1072020-10-0606 October 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (EPID L-2020-LLA-0209 ML20191A0252020-07-0101 July 2020 NRR E-mail Capture - Draft Request for Additional Information Monticello Alternative Request RR-016 Related to H8, H9, and H 10 Weld Examinations ML20120A0272020-04-28028 April 2020 NRR E-mail Capture - Request for Additional Information Monticello Long Term Steam Dryer Inspection Plan ML20099F1292020-04-0606 April 2020 E-mail to Licensee for Monticello Lr Phase 4 RFI ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20064C5352020-03-0404 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Revise the Previously Authorized Alternative in RR-008 for the H8 and H9 Welds 2024-01-20
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23262B2272023-09-21021 September 2023 September 21, 2023, Pre-Submittal Meeting on License Amendment Request to Revise PTLR to Incorporate New Surveillance Capsule Data (EPID L-2023-LRM-0070) (Slides) ML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22067A0272022-03-16016 March 2022 Subsequent License Renewal Application Pre-Application Meeting March 16, 2022 ML22068A1222022-03-15015 March 2022 pre-application Public Meeting 3/15/22 Slides - Applicant ML22067A0672022-03-15015 March 2022 Pre-application Public Meeting 3/15/22 Slides-NRC ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21082A4702021-03-25025 March 2021 Xcel Presentation for Monticello Pre-Application Public Meeting to Adopt Advanced Framatome Methods ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17346A0842017-12-12012 December 2017 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy Monticello Nuclear Generating Plant ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17058A4842017-03-0202 March 2017 03/02/2017 Presentation Slides for the Exemption Request for Restoring Dry Shielded Canister (DSC) 11-15 Compliance to 10 CFR Part 72 Pre-Submittal Meeting ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16312A5072016-11-0909 November 2016 Xcel Energy Presentation - Pre-Application Public Meeting on 11/09/2016 Re: Plan for Restoring DCS Nos. 11 - 16 (Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation) (Docket No. 72-58, CAC No. L25156) ML16323A3292016-09-23023 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information ML15092A4802015-03-26026 March 2015 Annual Assessment Meeting - Slides ML15092A4822015-03-26026 March 2015 EOC Licensee Meeting Slides ML14323A9372014-11-19019 November 2014 Regcon, November 19-29, 2014: 02-Panel-3 Presentation Michael Baumann - Ope Experiences Monticello ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14108A4012014-03-31031 March 2014 Annual Assessment Meeting - Reactor Oversight Process 2013 Slides ML14108A4052014-03-31031 March 2014 EOC Meeting Licensee Slides ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13066A4462013-02-28028 February 2013 Xcel Energy Presentation Handout Supporting February 28, 2013, Pre-Application Meeting to Discuss Proposed Fuel Transition License Amendment Request ML12093A0982012-04-0202 April 2012 Slides Provided by Monticello Licensee for 4/3/12 Meeting Regarding Containment Accident Pressure Credit for EPU Operation ML12017A0482012-01-17017 January 2012 Handout for 1-17-12 Meeting Re. a Future Application for Amendment Concerning Fuel Storage Criticality Analysis ML0934908762009-12-15015 December 2009 Meeting Slides from December 15, 2009 - Mellla+ LAR ML0912505822009-05-0505 May 2009 Meeting Slides, Monticello, Preparation & Assessment for Hostile Action-based Drill. ML0835703302008-12-22022 December 2008 Licensee (Northern States Power Company, Minnesota) Slides Presented at Public Meeting: Human Performance Assessment and Improvement ML0835703272008-12-17017 December 2008 Meeting Slides, Independent Human Performance Focused Self-Assessment Results, Presented by (Northern States Power Company, Minnesota at Public Meeting ML0828903572008-10-15015 October 2008 Meeting Slides, Monticello Extended Power Uprate Resubmittal ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0800905242008-01-0909 January 2008 Meeting Handout, Nuclear Emergency Plan Submittal for Monticello & Prairie Island, Units 1 and 2 ML0710204892007-04-0404 April 2007 Meeting Slides, Monticello Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0625401632006-09-0808 September 2006 Slides: Accelerated ISTS Conversion (Piilot) by P. Hearn, NRR ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0614302562006-05-17017 May 2006 Public Meeting NRC Presentation Slides Monticello Plant Performance Annual Assessment ML0609606272006-03-22022 March 2006 Presentation Slides for Draft SEIS Meeting, Monticello Nuclear Power Plant ML0606703372006-03-0606 March 2006 NMC Presentation on Alternative Source Term - Full Scope ML0520600372005-06-30030 June 2005 Presentation Slides for Scoping Meeting - Monticello Nuclear Generating Plant 2023-09-21
[Table view] |
Text
From: Fields, John S.
To: Gibson, Lauren Cc: Eckholt, Gene F.; Rohrer, Rick J.; Gunderson, Lynne
Subject:
[External_Sender] Monticello Nuclear Generating Plant Flood Hazard Reevaluation Report - Response to Requested Information (CAC No. MF7712)
Date: Friday, September 23, 2016 11:03:54 AM Ms. Gibson, On August 18, 2016, a joint audit call was held between the NRC and Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, related to the Monticello Nuclear Generating Plants (MNGPs) Flood Hazard Reevaluation Report (FHRR) (dated May 12, 2016; ADAMS Accession No. ML16145A179 and ML16145A180). The audit call was held in accordance with the NRC audit plan (ADAMS Accession No. ML16152A125). As a result of the audit call, the NRC requested on August 30, 2016 that information be submitted on the docket by October 28, 2016.
The information request is repeated below along with a response to the request.
Requested Information for MNGP Please provide revised figure(s) to include all critical door opening locations, river reaches, and cross section associated with each of the critical door locations using appropriate annotations and legends.
Northern States Power - Minnesota (NSPM) Response:
Eleven figures are attached to this email, which include all critical door opening locations, river reaches, and cross sections.
In addition, as discussed in the August 18, 2016 audit call, NSPM identified that calculation 180999.51.1005, Tables 3.0-1 & 5.4-5 contained incorrect information. The tables indicate that Door 1 has a water surface outside the door that is 2.09 ft above the door sill. The calculation had actually determined that the water surface outside Door 1 was only 0.5 ft above the door sill. This reported result is conservative and therefore the calculation is not being changed. Note that on the enclosed figure for Door 1, NSPM has included both the original and corrected water surface values.
Finally, as discussed in the August 18, 2016 audit call and in a call with A. Minarik on July 7, 2016, the door listed on the figure as Door 341 is actually an unnumbered door in the Plant Administration Building stairway that is adjacent to Door 341. This does not affect any conclusions of the FHRR or LIP analyses. We simply wanted to bring it to your attention.
Please contact me if you have any questions.
Thank you, John S. Fields 763-271-6707 Monticello Projects Licensing 2807 West County Rd 75, Monticello MN 55362