Monticello Annual Assessment Meeting Monticello Annual Assessment Meeting Reactor Oversight Program Reactor Oversight Program -- CY 2005 CY 2005 Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region III Region III Monticello, Minnesota Monticello, Minnesota May 17, 2006 May 17, 2006

Purpose of Todays Meeting A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance NRC will address the licensee performance issues NRC will address the licensee performance issues identified in the annual assessment letter identified in the annual assessment letter Licensee will be given the opportunity to respond to Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of the information in the letter and inform the NRC of new or existing programs to maintain or improve new or existing programs to maintain or improve their performance their performance

Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions

Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Mark Satorius Director Division of Reactor Projects Steven West Deputy Director Cynthia Pederson Director Division of Reactor Safety Anne Boland Deputy Director Bruce Burgess Branch Chief Regional Specialists Monticello Resident Inspectors Christopher Thomas Robert Orlikowski Project Engineers Nirodh Shah Stuart Sheldon

NRC Representatives NRC Representatives z Mark Satorius, Director, Division Reactor Projects (630) 829-9600 z Steven West, Deputy Division Director, DRP (630) 829-9601 z Peter Tam, Project Manager, NRR (301) 415-1451 z Christopher Thomas, Senior Resident Inspector (763) 295-2066 z Robert Orlikowski, Resident Inspector (763) 295-2066 z Bruce Burgess, Branch Chief (630) 829-9629 z Nirodh Shah, Project Engineer (630) 829-9821 z Stuart Sheldon, Reactor Engineer (630) 829-9727

NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRC strategic objective

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections z Equipment Alignment

~80 hrs/yr z Triennial Fire Protection

~200 hrs every 3 yrs z Operator Response

~125 hrs/yr z Emergency Preparedness

~80 hrs/yr z Rad Release Controls

~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program

~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 103

National Summary z Performance Indicator Results (at end of CY 2005)

Green 1850 White 4

Yellow 0

Red 0

z Total Inspection Findings (CY 2005)

Green 849 White 10 Yellow 1

Red 0

Monticello Assessment Results (Jan 1 - Dec 31, 2005) z Licensee Response Column of Action Matrix with all Green PIs and inspection findings z No supplemental or special inspections

Safety Significant Findings or PIs None None

Monticello Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2005)

Dec 31, 2005)

There were approximately 4276 hours0.0495 days <br />1.188 hours <br />0.00707 weeks <br />0.00163 months <br /> of inspection related activities performed at the MNGP during 2005.

The inspections were performed by the Resident Inspectors and Regional Inspectors.

There were 11 Green or SL-IV Inspection Findings identified during 2005.

There was a Refueling Outage during 2005.

Monticello Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2005)

Dec 31, 2005)

Major team inspections performed in 2005

  • Problem Identification and Resolution
  • Modifications/50.59
  • Triennial Fire Protection

Monticello Annual Assessment Summary January 1 - December 31, 2005 z NMC operated Monticello in a manner that preserved public health and safety z All cornerstone objectives were met z NRC plans baseline inspections at Monticello for the remainder of the assessment period

Licensee Response and Remarks John Conway Site Vice President Nuclear Management Company

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)