~f,RSl.?'J>

Dr. Timothy W. Koeth

~~-:\. ~ 0.-t'> INSTITUTE FOR RESEARCH IN Associate Research Professor 18 * . 56 ELECTRONICS Director, Nuclear Reactor & Radiation Facilities Energy Research Facility, Building 223,

~-1 . +~ & APPLIED PHYSICS Paint Branch Drive, College Park, MD 20742-3511 l(yL~ TEL: 301.405.4952 - FAX 301.314.9437 - koeth@umd.edu Sept 29, 2016 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 RE: Annual Report: July 1, 2015 - June 30, 2016 for the Maryland University Training Reactor, Docket No. 50-166, License No. R-70 (TAC NO. ME 1592), University of Maryland.

Enclosed please find the University of Maryland's Annual Report for the period beginning July 1 2015 and ending June 30, 2016 for the MUTR, Docket No. 50-166, License No. R-70 I declare under penalty of perjury that the foregoing response is true and correct.

Sine~ Jr/_d

-f.-v::; U /(tr' Timothy W. Koeth

18 56 Annual Operating Report:

July 1, 2015 - June 30, 2016 lV{UTR Technical Specification 6.7.1 License No. R-70, Docket No. 50-166 A. James Clark School of Engineering Department of Materials Science and Engineering University of Maryland, College Park, MD 20742

Maryland University Training Reactor Annual Operating Report, FY 15-16 Contents 1 Introduction 2 2 Reactor Usage 2 3 Surveillance Tests and Inspections 2 3.1 Maintenance Operations . . . . . . 3 4 Changes to Facility 3 5 Environmental Surveys of Surrounding Areas 3 6 Radioactive Release and Discharge to the Environment 4 6.1 Liquid . . . . . . . . . 4 6.2 Gaseous and Argon-41 . . . . . . . . . . . . . . . . . . . . 5 7 Summary of Exposure Received by Facility Personnel and Vis-itors 5 8 Unscheduled Shutdown/Reportable Occurrences 5 9 Special Experiments 5 10 Changes in Facility Staff 5 Page 1

Maryland University Training Reactor Annual Operating Report, FY 15-16 1 Introduction The University of Maryland Training Reactor (MUTR) is an open-pool type, TRJGA facility licensed for operation at 250 kW thermal power. The MUTR is primarily used for operator training and tours for groups internal and external to the campus. In addition, the facility provides neutron and gamma irradiations, and neutron activation analysis experiments for undergraduate lab classes and graduate research.

2 Reactor Usage Between July 1, 2015 to June 30, 2016, the MUTR operated for a total of 96 runs, which are categorized as follows:

Operator Training and Requalification 27 runs Tours, Labs, and Demonstrations 24 runs Calibration, Maintenance, and Surveillance 18 runs Irradiations or Activations 28 runs The total energy produced during this period was 22.96MWh with a corre-sponding burnup of 1.30 grams of U-235.

3 Surveillance Tests and Inspections All required surveillance tests and inspections were preformed at the intervals required by Technical Specification 4.0.

WATER SAMPLE TESTS AIR SAMPLE TESTS RADIATION SURVEYS CONTROL ROD INSPECTION CONTROL ROD DROP TEST RAM CALIBRATION SNM INVENTORIES ALARA REVIEW Page 2

Maryland University Training Reactor Annual Operating Report, FY 15-16 3.1 Maintenance Operations In addition to the above surveillance items, the following maintenance opera-tions were performed on the indicated dates:

9/13/15 Replaced primary filter 9/8/15 Dri-rite replaced 11/11/15 Replaced PuBe source string 11/11/15 Replaced microswitches for Shim 1 magnet down, Shim 2 and Regulating Rod up 12/22/15 Dri-rite replaced 11/11/15 Replaced microswitch for Shim 2 magnet down 3/8/16 Dri-rite replaced 4/22/16 Replaced primary resin 6/7/16 Dri-rite replaced Additional minor maintenance was performed such as light bulb replacement and fine-tuning of equipment as necessary.

4 Changes to Facility There were no significant changes to the facility during this reporting period.

5 Environmental Surveys of Surrounding Areas Environmental surveys include the routine environmental dosimeter measure-ments at the facility perimeter and the remainder of the locations on .campus.

With the exception of recently positioned monitors [10, 11 and 12], the net measurements in millirem (mrem) tabulated below represent the July 1, 2015 to June 30, 2016 reporting period. Measurements at all points were well within the historical norms.

Page 3

Maryland University Training Reactor Annual Operating Report, FY 15-16 Environmental Survey Results for the Maryland University Training Reactor July 1, 2015 to June 30, 2016 MON ITOR LOCATION DOSE (MREM) 2 308 m NE of MUTR 48a 3 1.1 km SW of MUTR 5 4 758 m NW of MUTR 2 5 387 m SE of MUTR 9 6 North, side MUTR fence line 2 7 East, adjacent to MUTR and IRR 2 8 West, adjacent to MUTR 5 9 606 m S of MUTR 16 lOb 950 m W of MUTR 5 11 b South, courtyard adjacent to MUTR 12 12b 248 m NW of MUTR 6 anose received is attributed to naturally occurring radioactive material (NORM) in the construction bricks of the building.

bMonitoring period from January 1, 2016 to June 30, 2016 Figure 1: Location of dosimeters and MUT R 6 Radioactive Release and Discharge to the En-vironment 6.1 Liquid The Reactor Storage Sump was not discharged during this reporting period.

Page 4

Maryland University Training Reactor Annual Operating Report, FY 15-16 6.2 Gaseous and Argon-41 The only release from the MUTR to the environment consists of Argon-41 pro-duced from the activation of natural Argon dissolved in pool water and natural Argon present in air within the interstitial spaces of beams and ports. Argon-41 escapes from the pool and spaces into the MUTR reactor building and then leaks to areas outside the building. The two main areas for assessment of public dose due to effluent release are outside the roll-up door on the north side of the reactor building and outside the lower reception room into the hallway 1398.

For this reporting period the reactor was operated for 304.93 hours0.00108 days <br />0.0258 hours <br />1.537698e-4 weeks <br />3.53865e-5 months <br />. EPA CAP88 was utilized to determine the dose outside the roll-up door to be 1.98 x 10- 1 mrem. The dose in the hallway 1398 from any effluent release is 5.64 x 10- 4 mrem.

7 Summary of Exposure Received by Facility Personnel and Visitors As part of the annual ALARA audit, facility management reviewed exposure records and found all badged personnel received less than 10% of their annual dose limit. The pocket dosimeters recorded minimal exposure for all guests and service personnel.

8 Unscheduled Shutdown/Reportable Occurrences During this reporting period, there were 5 unscheduled shutdowns resulting in the reactor SCRAM.

  • Run# 4476 Safety 2 High Voltage on January 8, 2016
  • Run# 4478 loss of power to Regulating Rod on January 15, 2016
  • Run# 4481 period scram on Feb. 10, 2016
  • Run# 4506 external scram, undercount on exhaust ram on April 11, 2016
  • Run# 4510 AC power glitch on April 14, 2016 There were no reportable occurrences during this reporting period.

9 Special Experiments There were no new special experiments performed during this reporting period.

10 Changes in Facility Staff There were no signifcant staff changes during this period.

Page 5