12/9/10 Summary of Telephone Conference Call Held Between NRC and PG&E Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 & M
ML103550680
Person / Time
Site: Diablo Canyon  
Issue date: 01/11/2011
From: Ferrer N
License Renewal Projects Branch 2
To:
Ferrer, N B, NRR/DLR, 415-1045
References
TAC ME2896, TAC ME2897
Download: ML103550680 (5)


Text

\\.~"'~ REGu<.q UNITED STATES

~~v

""01>

NUCLEAR REGULATORY COMMISSION

~

WASHINGTON, D.C. 20555-0001

<t 0

January 11, 2011

~

.fJ 1-')

,..0

        • i<

LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER g, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on December g, 2010, to obtain clarification on PG&E's response to the staff's requests for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated November 24, 2010, PG&E sent the staff its response to an RAI regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying PG&E's response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on the RAI response for which the staff requested clarification.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv

TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 PARTICIPANTS Nate Ferrer Bill Holston Terry Grebel Lee Golliet Joe Anastasio Miranda Tan Kevin Braico Dave Kunsemiller Stan Shepard LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 9, 2010 AFFILIATIONS U,S, Nuclear Regulatory Commission (NRC)

NRC Pacific Gas and Electric Company (PG&E)

PG&E PG&E PG&E PG&E Strategic Teaming And Resource Sharing (STARS)

STARS ENCLOSURE 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information Aging Management Programs 82.1.18-2 (follow-up)

In its November 24, 2010, response to RAI B2.1.18-2 (follow-up), the applicant provided additional details on the Buried Piping and Tanks Inspection Program.

Discussion:

The staff was unclear of the inspection details of the in-scope buried copper valves in the makeup water system. In addition, the staff was not clear of the actual length of steel piping in the makeup water system that is buried. The staff was concerned that the applicant's commitment appeared to allow for non-destructive examinations instead of visual examinations.

The applicant agreed to supplement its response to RAI B2.1.18-2 (follow-up) to address the staff's concerns.

ENCLOSURE 2

January 11, 2011 LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 9, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on December 9, 2010, to obtain clarification on PG&E's response to the staff's requests for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated November 24,2010, PG&E sent the staff its response to an RAI regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying PG&E's response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on the RAI response for which the staff requested clarification.

The applicant had an opportunity to comment on this summary.

IRA!

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No. ML103550680 OFFICE LA:DLR PM:RPB2:DLR I BC:RPB2:DLR PM:RPB2:DLR NAME IKing NFerrer DWrona NFerrer DATE 12/22/10 1/5/10 1/7/10 1/11/10 OFFICIAL RECORD COpy

Memorandum to PG&E from N. Ferrer dated January 11, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 9, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC [or NON-PUBLIC, if appropriate]

RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NO'Keefe, RIV I Couret, OPA VDricks,OPA WMaier, RIV JWeil,OCA EWiliiamson, OGC SUttat,OGC RRihm, EDO