ML101960644
Letter Sequence Other | |
---|---|
Initiation Administration Questions
Answers | |
MONTHYEARML1007101132010-03-10010 March 2010
[Table View]Task Order No. 002 Under Delivery Order No. NRC-03-10-070 Project stage: Acceptance Review ML1007101142010-03-10010 March 2010 Task Order No. 002 Under Delivery Order No. NRC-03-10-070 Project stage: Acceptance Review ML1013201872010-05-18018 May 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML1013806142010-05-24024 May 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening Methodology Project stage: RAI ML1015404192010-06-14014 June 2010 Letter Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1016201872010-06-21021 June 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1016901302010-06-29029 June 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1017601042010-07-0606 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML1017602432010-07-14014 July 2010 RAI Related to the Review of the DCPP LRA - Aging Management Programs Project stage: RAI ML1018301312010-07-15015 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening and Aging Management Review Project stage: RAI ML1018908322010-07-16016 July 2010 Audit Report Regarding the Diablo Canyon Nuclear Power Plant License Renewal Application Scoping and Screening Methodology Project stage: Other ML1018700882010-07-19019 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1019004702010-07-20020 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 & 2, LRA (Tac Nos. ME2896, and ME2897) - Scoping and Screening Project stage: RAI ML1018802552010-07-20020 July 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Reactor Vessel Internals Project stage: RAI ML1018301442010-07-20020 July 2010 RAI Related to the Review of the DCPP LRA - Aging Management Programs and Aging Management Review Project stage: RAI ML1018900212010-07-22022 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review and Time Limited Aging Analysis Project stage: RAI ML1018807352010-07-22022 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review and Aging Management Programs Project stage: RAI ML1020004882010-08-0303 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Review and Aging Management Programs Project stage: RAI ML1020402512010-08-0909 August 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening and Aging Management Review Project stage: RAI ML1016903212010-08-11011 August 2010 Audit Report for Plant Aging Management Programs for DCPP, Units 1 and 2 Project stage: Other ML1019606442010-08-13013 August 2010 Safety Project Manager Change for the License Renewal Project for Diablo Canyon Nuclear Power Plant (TAC ME2896 and ME2897) Project stage: Other ML1021705242010-08-25025 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Metal Fatigue Project stage: RAI ML1020107002010-08-26026 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analyses and Aging Management Programs Project stage: RAI ML1022402772010-08-26026 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1022905422010-08-30030 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Review and Time Limited Aging Analyses Project stage: RAI ML1023607492010-09-0101 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1024300272010-09-13013 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. Me 2869 and ME2897) - Scoping and Screening Project stage: RAI ML1025202782010-09-17017 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening Project stage: RAI ML1024600502010-09-17017 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 & ME2897) Aging Management Programs Project stage: RAI ML1025102972010-09-23023 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analyses Project stage: RAI ML1024601512010-09-28028 September 2010 Summary of Telephone Conference Call Held on 9/2/10 Between Us NRC and Pacific Gas and Electric Company Concerning the Response to RAIs Related to the Diablo Canyon Nuclear Power Plant Units 1 and 2 LRA Project stage: RAI ML1025202642010-09-29029 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review Project stage: RAI ML1026605412010-09-30030 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Fire Protection Project stage: RAI ML1029806892010-11-0202 November 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analysis Project stage: RAI ML1029306302010-11-0303 November 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Programs Project stage: RAI ML1034810132010-12-20020 December 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Program and Time Limited Aging Analysis Project stage: RAI ML1034104342010-12-20020 December 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC ME2896 and ME2897) - Time Limited Aging Analysis Project stage: RAI ML1034904172011-01-10010 January 2011 12/1/10 Summary of Telephone Conference Call Held Btw the USNRC and Pacific Gas and Electric Company Concerning Draft Request for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA Project stage: Draft RAI ML1035603212011-01-10010 January 2011 12/8/10 Summary of Telephone Conference Call Held Btw the USNRC and Pacific Gas and Electric Company Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Ap Project stage: RAI ML1034306232011-01-11011 January 2011 Summary of Telephone Conference Call Held Between NRC and PG&E Concerning Request for Additional Information Related Tot the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA (TAC Nos. ME2896 & ME2897) Project stage: RAI ML1035506802011-01-11011 January 2011 12/9/10 Summary of Telephone Conference Call Held Between NRC and PG&E Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 & M Project stage: RAI ML1101005882011-01-25025 January 2011 Summary of Telephone Conference Call Held on December 16, 2010, Between the NRC and Pacific Gas and Electric Company Concerning RAI Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA Project stage: RAI ML1101102612011-01-25025 January 2011 Summary of Telephone Conference Call Held on 12/22/2010, Between the NRC and Pacific Gas and Electric Company Concerning Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA (TAC Nos. ME28 Project stage: RAI ML1101204182011-02-0707 February 2011 Summary of Telephone Conference Call Held with NRC and PG&E Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA (TAC Nos. ME2896 & ME2897) Project stage: RAI ML1101400082011-02-0707 February 2011 01/04/11 Summary of Telephone Conference Call Held Between the NRC and PG&E Company Concerning Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 Project stage: RAI ML1104105282011-02-14014 February 2011 Summary of Telephone Conference Call Held on 1/19/11 Between the USNRC and PG&E Concerning Open Items Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, Safety Evaluation Report Project stage: Approval ML1104607182011-02-18018 February 2011 January 25, 2011, Summary of Telephone Conference Call Held Between NRC and PG&E Concerning Open Items Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, SER (TAC Nos. ME2896 & 2897) Project stage: Other ML1105907492011-03-17017 March 2011 Summary of Telephone Conference Calls Held on February 2 and 4, 2011, Btw the USNRC and Pacific Gas and Electric Company Concerning RAIs Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA Project stage: RAI ML1108404592011-04-11011 April 2011 Summary of Telephone Conference Calls Held on 2/28/11 and 3/17/11 Btw the USNRC and Pacific Gas and Electric Company Concerning RAIs Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA Project stage: RAI ML15217A4812015-09-24024 September 2015 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application Set-38 TAC Nos. ME2896 and ME2897 Project stage: RAI 2010-08-26 |
ML101960644 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 08/13/2010 |
From: | David Wrona License Renewal Projects Branch 2 |
To: | Conway J Pacific Gas & Electric Co |
Ferrer, N B, NRR/DLR, 415-1045 | |
References | |
TAC ME2896, TAC ME2897 | |
Download: ML101960644 (3) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024
[Table view]Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 13, 2010 Mr. John Conway Senior Vice President Generation and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, MC B32 San Francisco, CA 94105
SUBJECT:
SAFETY PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL PROJECT FOR DIABLO CANYON NUCLEAR POWER PLANT (TAC NOS. ME2896 AND ME2897)
Dear Mr. Conway:
This letter provides notification of a change to the Safety Project Manager assigned to the Diablo Canyon Nuclear Power Plant License Renewal Project. Effective immediately, Nathaniel B. Ferrer will be the Safety Project Manager for Diablo Canyon. Mr. Ferrer can be contacted by telephone at 301-415-1045 and bye-mail at nathaniel.ferrer@nrc.gov.
Sincerely, OJ'94/,-
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv
August 13, 2010 Mr. John Conway Senior Vice President Generation and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street. MC B32 San Francisco, CA 94105
SUBJECT:
SAFETY PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL PROJECT FOR DIABLO CANYON NUCLEAR POWER PLANT (TAC NOS. ME2896 AND ME2897)
Dear Mr. Conway:
This letter provides notification of a change to the Safety Project Manager assigned to the Diablo Canyon Nuclear Power Plant License Renewal Project. Effective immediately, Nathaniel B. Ferrer will be the Safety Project Manager for Diablo Canyon. Mr. Ferrer can be contacted by telephone at 301-415-1045 and bye-mail at nathaniel.ferrer@nrc.gov.
Sincerely, IRA!
David J. Wrona. Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION: See next page ADAMS Accession No ..'ML101960644 OFFICE PM:RPB2:DLR LA:RPOB:DLR BC:RPB2:DLR NAME NFerrer IKing DWrona DATE 07/21/10 07/19/10 08/13/10 OFFICIAL RECORD COpy
Letter to John Conway from David J. Wrona dated August 13, 2010
SUBJECT:
SAFETY PRO..IECT MANAGER CHANGE FOR THE LICENSE RENEWAL PROJECT FOR DIABLO CANYON NUCLEAR POWER PLANT (TAC NOS. ME2896 AND ME2897)
DISTRIBUTION:
HARDCOPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailRoom Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NO'Keefe, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil,OCA EWilliamson,OGC SUttal,OGC RRihm, EDO