Other: DCL-16-023, Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39, ML100710113, ML100710114, ML101690321, ML101890832, ML101960644, ML110460718, ML13135A010, ML15037A540, ML15233A518, ML15243A582, ML15275A094, ML15275A130, ML16271A439
|
MONTHYEARML1007101142010-03-10010 March 2010 Task Order No. 002 Under Delivery Order No. NRC-03-10-070 Project stage: Other ML1007101132010-03-10010 March 2010 Task Order No. 002 Under Delivery Order No. NRC-03-10-070 Project stage: Other ML1013201872010-05-18018 May 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML1013806142010-05-24024 May 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening Methodology Project stage: RAI DCL-10-066, License Amendment Request 10-03, Damping Values for the Seismic Design and Analysis of the Reactor Vessel Integrated Head Assembly2010-06-14014 June 2010 License Amendment Request 10-03, Damping Values for the Seismic Design and Analysis of the Reactor Vessel Integrated Head Assembly Project stage: Request ML1015404192010-06-14014 June 2010 Letter Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI DCL-10-067, Response to License Renewal Application (LRA) Request for Additional Information & LRA Errata2010-06-18018 June 2010 Response to License Renewal Application (LRA) Request for Additional Information & LRA Errata Project stage: Request ML1016201872010-06-21021 June 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1016901302010-06-29029 June 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1017601042010-07-0606 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application Project stage: RAI DCL-10-073, Response to NRC Request for Additional Information on License Renewal Application2010-07-0707 July 2010 Response to NRC Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1017602432010-07-14014 July 2010 RAI Related to the Review of the DCPP LRA - Aging Management Programs Project stage: RAI ML1018301312010-07-15015 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening and Aging Management Review Project stage: RAI ML1018908322010-07-16016 July 2010 Audit Report Regarding the Diablo Canyon Nuclear Power Plant License Renewal Application Scoping and Screening Methodology Project stage: Other DCL-10-077, Response to NRC Letter Dated June 21, 2010 Request for Additional Information (Set 5) for License Renewal Application2010-07-19019 July 2010 Response to NRC Letter Dated June 21, 2010 Request for Additional Information (Set 5) for License Renewal Application Project stage: Request ML1018700882010-07-19019 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1018301442010-07-20020 July 2010 RAI Related to the Review of the DCPP LRA - Aging Management Programs and Aging Management Review Project stage: RAI ML1018802552010-07-20020 July 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Reactor Vessel Internals Project stage: RAI ML1019004702010-07-20020 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 & 2, LRA (Tac Nos. ME2896, and ME2897) - Scoping and Screening Project stage: RAI ML1018807352010-07-22022 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review and Aging Management Programs Project stage: RAI ML1018900212010-07-22022 July 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review and Time Limited Aging Analysis Project stage: RAI DCL-10-091, Response to NRC Letter Dated June 18, 2010, Request for Additional Information (High Energy Piping) for License Renewal Application2010-07-28028 July 2010 Response to NRC Letter Dated June 18, 2010, Request for Additional Information (High Energy Piping) for License Renewal Application Project stage: Request ML1020004882010-08-0303 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Review and Aging Management Programs Project stage: RAI ML1020402512010-08-0909 August 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening and Aging Management Review Project stage: RAI ML1016903212010-08-11011 August 2010 Audit Report for Plant Aging Management Programs for DCPP, Units 1 and 2 Project stage: Other ML1019606442010-08-13013 August 2010 Safety Project Manager Change for the License Renewal Project for Diablo Canyon Nuclear Power Plant Project stage: Other DCL-2010-536, Submittal of National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Intake Structure2010-08-25025 August 2010 Submittal of National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Intake Structure Project stage: Request ML1021705242010-08-25025 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Metal Fatigue Project stage: RAI ML1020107002010-08-26026 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analyses and Aging Management Programs Project stage: RAI ML1022402772010-08-26026 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1022905422010-08-30030 August 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Review and Time Limited Aging Analyses Project stage: RAI DCL-10-113, Response to NRC Letter Dated August 3, 2010, Request for Additional Information (Set 16) for the License Renewal Application2010-08-30030 August 2010 Response to NRC Letter Dated August 3, 2010, Request for Additional Information (Set 16) for the License Renewal Application Project stage: Request ML1023607492010-09-0101 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs Project stage: RAI ML1024300272010-09-13013 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. Me 2869 and ME2897) - Scoping and Screening Project stage: RAI ML1024600502010-09-17017 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 & ME2897) Aging Management Programs Project stage: RAI ML1025202782010-09-17017 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Scoping and Screening Project stage: RAI DCL-10-121, Response to NRC Letter Dated August 25, 2010, Request for Additional Information (Set 19) for License Renewal Application2010-09-22022 September 2010 Response to NRC Letter Dated August 25, 2010, Request for Additional Information (Set 19) for License Renewal Application Project stage: Request ML1025102972010-09-23023 September 2010 RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analyses Project stage: RAI DCL-10-120, Response to NRC Letter Dated August 26, 2010, Request for Additional Information (Set 17) for License Renewal Application2010-09-24024 September 2010 Response to NRC Letter Dated August 26, 2010, Request for Additional Information (Set 17) for License Renewal Application Project stage: Request ML1024601512010-09-28028 September 2010 Summary of Telephone Conference Call Held on 9/2/10 Between Us NRC and Pacific Gas and Electric Company Concerning the Response to RAIs Related to the Diablo Canyon Nuclear Power Plant Units 1 and 2 LRA Project stage: RAI ML1025202642010-09-29029 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Review Project stage: RAI ML1026605412010-09-30030 September 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Fire Protection Project stage: RAI DCL-10-126, Response to NRC Letter Dated September 1, 2010, Request for Additional Information(Set 22) for the Diablo Canyon License Renewal Application2010-09-30030 September 2010 Response to NRC Letter Dated September 1, 2010, Request for Additional Information(Set 22) for the Diablo Canyon License Renewal Application Project stage: Request ML1029806892010-11-0202 November 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Time Limited Aging Analysis Project stage: RAI ML1029306302010-11-0303 November 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application - Aging Management Programs Project stage: RAI ML1034104342010-12-20020 December 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC ME2896 and ME2897) - Time Limited Aging Analysis Project stage: RAI ML1034810132010-12-20020 December 2010 Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Program and Time Limited Aging Analysis Project stage: RAI ML1035603212011-01-10010 January 2011 12/8/10 Summary of Telephone Conference Call Held Btw the USNRC and Pacific Gas and Electric Company Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Ap Project stage: RAI ML1034904172011-01-10010 January 2011 12/1/10 Summary of Telephone Conference Call Held Btw the USNRC and Pacific Gas and Electric Company Concerning Draft Request for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA Project stage: Draft RAI ML1034306232011-01-11011 January 2011 Summary of Telephone Conference Call Held Between NRC and PG&E Concerning Request for Additional Information Related Tot the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA (TAC Nos. ME2896 & ME2897) Project stage: RAI 2010-07-07
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2010 John Conway Senior Vice President Generation and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, MC B32 San Francisco, CA 94105
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2S96 AND ME2S97) - AGING MANAGEMENT REVIEW AND TIME LIMITED AGING ANALYSES
Dear Mr. Conway:
By letter dated November 23,2009, Pacific Gas & Electric Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Diablo Canyon Nuclear Power Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
The request for additional information was discussed with Mr. Terry Grebel, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1045 or e-mail nathaniel.ferrer@nrc.gov.
Sincerely,
~2---~-
Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
As stated cc w/encl: Distribution via Listserv
Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information Set 14 Aging Management ReviewlTime Limited Aging Analyses RAI 3.1.2.2.7.2*1 Diablo Canyon Power Plant (DCPP) license renewal application (LRA) Section 3.1.2.2.7.2 with LRA Table 3.3.1, item 3.1.1.24 addresses stainless steel Class 1 pressurized water reactor (PWR) cast austenitic stainless steel (CASS) piping and components exposed to reactor coolant. The LRA section states that for managing the aging of cracking due to stress corrosion cracking for the CASS components, the Water Chemistry Program will be augmented by the American Society of Mechanical Engineers (ASME) Section Xllnservice Inspection, Subsections IWB, IWC and IWD Program. LRA Section 3.1.2.2.7.2 also states that the susceptibility to thermal aging embrittlement will be evaluated in the Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Program (B2.1.39). LRA Section B2.1.39 indicates that the applicant's Thermal Aging Embrittlement of CASS Program is a new program that will be consistent with Generic Aging Lessons Learned (GALL) aging management program (AMP) XI.M12, 'Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS)," with no exception or enhancement.
The staff noted that although LRA Section 3.1.2.2.7.2 addresses the material evaluation criteria used to manage the thermal embrittlement of CASS, the LRA section does not address the material screening criteria used to further evaluate and manage stress corrosion cracking of the CASS components.
In order to manage the stress corrosion cracking of the CASS components, the GALL Report, under item IV.C2-3, recommends further evaluation for CASS that has carbon content greater than 0.035% or ferrite content less than 7.5%.
- 1. Clarify the material screening criteria used to further evaluate and manage the stress corrosion cracking of CASS are consistent with GALL Report item IV.C2-3 which recommends that stress corrosion cracking of CASS with carbon content greater than 0.035% or ferrite content less than 7.5% be further evaluated and adequately managed.
- 2. Clarify whether stress corrosion cracking in the CASS components under GALL Report item IV.C2-3 is managed by inspections, flaw evaluations, and repairs and replacements in accordance with the ASME Section XI Inservice Inspection, Subsections IWB, IWC and IWD Program and the material screening criteria that the GALL Report recommends for the further evaluation. If the ASME Section Xllnservice Inspection, Subsections IWB, IWC and IWD Program or the material screening criteria recommend for the further evaluation is not used to manage the stress corrosion cracking, justify why the applicant's aging management approach is adequate to manage the aging effect.
ENCLOSURE
- 2 RAI3.5.2.3.10-1 LRA Table 3.5.2-10 indicates that for aluminum components encased in concrete (external),
there are no aging effects requiring management The aging management review (AMR) line item cites generic Note J, indicating that neither the component nor the material and environment combination is evaluated in the GALL Report.
Corrosion of aluminum due to alkaline reaction could occur when it is used in contact with concrete. No justification for why there are no aging effects requiring management for the line item referenced above is provided.
Provide justification for why there are no aging effects requiring management for the identified aluminum components exposed to a concrete environment.
RAI4.6.2-1 In LRA Section 4.6.2, "Design Cycles for Containment Penetrations," the applicant states:
- 1. The 14,000 additional thermal cycles used in the original analysis for the steam generator blowdown lines is greater than the maximum of 7000 cycles which are expected in 60 years. Therefore, the fatigue analysis for the main steam generator blowdown line flued heads is valid for the period of extended operation in accordance with 10 CFR 54.21(c)(1)(i).
- 2. The original number of transients used in the containment airlocks, hatches, penetration sleeves, end plates, and flued head analyses (not including the steam generator blowdown lines flued heads) will be monitored by the DCPP Metal Fatigue of the Reactor Coolant Pressure Boundary Program, described in LRA Sections 4.3.1 and B3.1, to ensure that fatigue will be adequately managed for the period of extended operation in accordance with 10 CFR 54.21 (c)(1 )(iii). Action limits will permit completion of corrective actions before the design basis number of events is exceeded.
The staff reviewed LRA Sections 4.6.2, 4.3.1, and B3.1 and was unable to find the following information:
- 1. The total number of transients (thermal cycles, aBE events) used in the original analysis for the steam generator blowdown line flued heads.
- 2. Total number of transients used to determine that requirements of a fatigue waiver per Subparagraph N-415.1, Vessels Not Requiring for Cyclic Operation, and Figure N-415(A) were met for airlocks, equipment hatches, containment penetration sleeves, and end plates.
- 3. Total number of transients assumed in the current design basis for airlocks, equipment hatches, containment penetration sleeves. and end plates.
- 3 The staff needs the below information to confirm that an evaluation the fatigue analysis for the steam generator blowdown line flued heads is valid for the period of extended operation in accordance with 10 CFR 54.21(c)(1):
- 1. The total number of cycles used for the original analysis for the main steam generator blowdown lines flued heads for 40 years of operation.
- 2. The projected number of cycles for the main steam generator blowdown line flued heads during 60 years of operation.
- 3. Total number of transients used to determine that requirements of a fatigue waiver per Subparagraph N-415.1, Vessels Not Requiring for Cyclic Operation, and Figure N-415(A) were met for airlocks, equipment hatches, containment penetration sleeves, and end plates.
- 4. Total number of transients assumed in the current design basis for airlocks, equipment hatches, containment penetration sleeves, and end plates.
' ML101890021 OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer SFigueroa DWrona NFerrer DATE 07/12/10 07112110 07/22/10 07/22/10
Letter to J. Conway from N. Ferrer dated July 22,2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897) -AGING MANAGEMENT REVIEW AND TIME LIMITED AGING ANALYSES DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailRoom Resource N. Ferrer K. Green A. Stuyvenberg D. Wrona A. Wang M. Peck, RIV T. Brown, RI G. Miller, RIV N. O'Keefe, RIV I. Couret, OPA V. Dricks, OPA W. Maier, RIV J. Weil, OCA E. Williamson, OGC S. Uttal, GOC R. Rihm, EDO