ML15189A234

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - (External_Sender) Clarification of Dte'S Response to Nrc'S Question Regarding the Fermi ESEP Report
ML15189A234
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/01/2015
From: Hassoun A
Detroit Edison
To: Nicholas Difrancesco, Steve Wyman
Japan Lessons-Learned Division
References
Download: ML15189A234 (2)


Text

NRR-PMDAPEm Resource From: Alan I Hassoun [hassouna@dteenergy.com]

Sent: Wednesday, July 01, 2015 1:08 PM To: DiFrancesco, Nicholas; Wyman, Stephen

Subject:

[External_Sender] Clarification of DTE's Response to NRC's Question Regarding the Fermi ESEP Report The following discussion is intended to clarify the response to NRC staff Question-4 (RAI-4) regarding the Fermi 2 Expedited Seismic Evaluation Process (ESEP) Report as provided in DTE Electric Company (DTE) correspondence number NRC-15-0065, dated May 28, 2015.

In the response to Question-4, the term boxed was used to describe the application of the rule of the box concept. This methodology estimates High Confidence of Low Probability of Failure (HCLPF) capacities for the panels and cabinets based on the Conservative Deterministic Failure Margin (CDFM) approach. The resulting HCLPF values represent the functional capacity of the cabinet and contents. Additionally, the HCLPF capacity of the cabinet anchorage is evaluated by analysis of the plant-specific configuration. The smaller of the two HCLPF values applies to the cabinet as well as to all devices and components mounted inside the cabinet.

In most cases, the functional capacity is more limiting than the anchorage capacity.

The seismic capacity is represented by plant-specific test response spectra and Generic Equipment Ruggedness Spectra (GERS) at the base of the cabinet, while the seismic demand is represented by the clipped in-structure response spectra also at the base of the cabinet. Further, the GERS capacity is reduced by 10% in accordance with EPRI guidelines in order to obtain the CDFM.

Specific relays identified on the Expedited Seismic Equipment List (ESEL) are evaluated using plant specific relay fragilities and/or relay GERS supplemented by the high frequency GERS resulting from recently-completed high frequency testing program conducted by the Electric Power Research Institute (EPRI). In this case, the seismic demand is represented by the clipped in-structure response spectra at the base of the cabinet amplified by the cabinet amplification factor in accordance with the EPRI guidelines.

The application of the GERS is justified on the basis of plant walkdowns which confirmed that the associated caveats are satisfied. This is documented as part of the Expedited Seismic Evaluation Process (ESEP) Report.

Alan I. (Sam) Hassoun, P.E.

Supervisor - Nuclear Licensing DTE Energy - Fermi 2 Nuclear Power Plant Office: 734 586-4287

      • PROPRIETARY, CONFIDENTIAL OR PRIVILEGED COMMUNICATION ***

This communication may contain proprietary, privileged or confidential information protected by law. It is solely for the use of the intended recipient named above.

Any review, dissemination, distribution, forwarding, or copying of this communication by someone other than the intended recipient, or the individual responsible for delivering this communication to the intended recipient, is prohibited. If you have received this communication in error, please immediately notify the sender via email, then destroy the original message.

1

Hearing Identifier: NRR_PMDA Email Number: 2192 Mail Envelope Properties (OF50F85F76.CF1A09DE-ON85257E75.005E284A-85257E75.005E2856)

Subject:

[External_Sender] Clarification of DTE's Response to NRC's Question Regarding the Fermi ESEP Report Sent Date: 7/1/2015 1:08:27 PM Received Date: 7/1/2015 1:10:50 PM From: Alan I Hassoun Created By: hassouna@dteenergy.com Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>

Tracking Status: None Post Office: dteenergy.com Files Size Date & Time MESSAGE 2963 7/1/2015 1:10:50 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: