Technical Requirements Manual/Trm Revision 128/SEC5.0
ML15086A182
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/10/2015
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15086A176 List:
References
W3F1-2015-0023
Download: ML15086A182 (1)


Text

  • (DRN 04-1244, Am. 99) 5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS 5.7-1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7-1.

TABLE 5.7-1 COMPONENT CYCLIC OR TRANSIENT LIMITS COMPONENT CYCLIC OR DESIGN CYCLE TRANSIENT LIMIT OR TRANSIENT Reactor Coolant System 500 system heatup cycles and Heatup cycle 500 cooldown cycles at rates Tcold from < 70 °F to > 541 °F;

< 100 °F / hr.

cooldown cycle Tcold from > 541 °F to < 70 °F.

  • (DRN 06-1000, Am. 110) 200 pressurizer heatup and Heatup cycle - Pressurizer cooldown cycles at rates temperature from

< 200 °F / hr.

< 70 °F to > 653 °F; cooldown cycle

> 653 °F to < 70 °F

RCS pressurized to 3125 psia with RCS temperature > 60 °F above the most limiting components NDTT value.

200 leak testing cycles.

RCS pressurized to 2250 psia with RCS temperature greater than minimum for hydrostatic testing, but less than 400 °F.

200 seismic stress cycles.

Subjection to a seismic event equal to the operating basis earthquake (OBE).

480 cycles (any combination) of Trip from 100% of RATED reactor trip, turbine trip, or THERMAL POWER; Turbine complete loss of forced reactor trip (total load rejection from coolant flow.

100% of RATED THERMAL POWER followed by resulting reactor trip; simultaneous loss of all reactor coolant pumps at 100% of RATED THERMAL POWER.

5 complete loss of secondary Loss of secondary pressure from pressure cycles.

either steam generator while in MODE 1, 2, or 3.