ML15086A182

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual/Trm Revision 128/SEC5.0
ML15086A182
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/10/2015
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15086A176 List:
References
W3F1-2015-0023
Download: ML15086A182 (1)


Text

, 110(DRN 04-1244, Am. 99)

(DRN 04-1244, Am. 99)5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS5.7-1 The components identified in Table 5.7-1 are designed and shall be maintained within thecyclic or transient limits of Table 5.7-1.TABLE 5.7-1COMPONENT CYCLIC OR TRANSIENT LIMITSCOMPONENTCYCLIC ORDESIGN CYCLETRANSIENT LIMITOR TRANSIENTReactor Coolant System500 system heatup cycles andHeatup cycle500 cooldown cycles at ratesTcold from < 70°F to > 541°F;< 100°F / hr.cooldown cycleTcold from > 541°F to < 70°F.(DRN 06-1000, Am. 110) 200pressurizer heatup andHeatup cycle - Pressurizercooldown cycles at ratestemperature from

< 200°F / hr.< 70

°F to > 653

°F;cooldown cycle

> 653°F to < 70°F(DRN 06-1000, Am. 110)10 hydrostatic testing cycles.RCS pressurized to 3125 psiawith RCS temperature > 60°Fabove the most limiting components' NDTT value.200 leak testing cycles.RCS pressurized to 2250 psiawith RCS temperature greater than minimum for hydrostatictesting, but less than 400

°F.200 seismic stress cycles.Subjection to a seismic eventequal to the operating basis earthquake (OBE).480 cycles (any combination) ofTrip from 100% of RATEDreactor trip, turbine trip, orTHERMAL POWER; Turbinecomplete loss of forced reactortrip (total load rejection from coolant flow.100% of RATED THERMALPOWER followed by resulting reactor trip; simultaneous loss of all reactor coolant pumps at 100% of RATED THERMAL POWER.5 complete loss of secondaryLoss of secondary pressure frompressure cycles.either steam generator while inMODE 1, 2, or 3.

(DRN 04-1244, Am. 99)