MONTHYEARML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G W3F1-2021-0035, Technical Requirements Manual Update2021-05-18018 May 2021 Technical Requirements Manual Update W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6652017-12-0606 December 2017 Technical Requirements Manual Update to the NRC ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G W3F1-2016-0040, Technical Requirements Manual Update to the NRC2016-06-0202 June 2016 Technical Requirements Manual Update to the NRC ML16132A5102015-10-15015 October 2015 3 to EN-RW-102, Radioactive Shipping Procedure ML16132A5072015-08-27027 August 2015 To EN-RW-105, Process Control Program ML16132A5082015-04-0808 April 2015 To EN-RW-106, Integrated Transportation Security Plan ML16132A5062015-04-0202 April 2015 2 to EN-RW-104, Scaling Factors W3F1-2016-0038, UNT-005-014, Rev. 306, Offsite Dose Calculation Manual2015-03-12012 March 2015 UNT-005-014, Rev. 306, Offsite Dose Calculation Manual W3F1-2015-0023, Technical Requirements Manual/Trm Revision 128/Trm34122015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3412 ML15086A1812015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC2.0 ML15086A1822015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC5.0 ML15086A1832015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC6.0 ML15086A1862015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm340 ML15086A1872015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm341 ML15086A1892015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm344 ML15086A2112015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3411 ML15086A2102015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmintro ML15086A2092015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmindex ML15086A2082015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmbases ML15086A2062015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm349 ML15086A1882015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm343 ML15086A2032015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm346 ML15086A2042015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm347 ML15086A2052015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm348 ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G W3F1-2011-0018, License Amendment Request to Relocate Technical Specifications to the Technical Requirements Manual2011-11-21021 November 2011 License Amendment Request to Relocate Technical Specifications to the Technical Requirements Manual W3F1-2011-0033, UNT-005-014, Rev. 302, Offsite Dose Calculation Manual2011-02-14014 February 2011 UNT-005-014, Rev. 302, Offsite Dose Calculation Manual ML0904103222008-04-15015 April 2008 Entergys Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 ML0612303022004-10-20020 October 2004 Corp. Administrative Procedure AP 31A-100, Revision 5, Solid Radwaste Process Control Program ML0612303002004-09-29029 September 2004 Corp. Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual ML0512504582004-09-0909 September 2004 Attachment 11.1, UNT-005-514, Offsite Dose Calculation Manual, Revision 7, Change 1 & 2 ML0612800752004-08-12012 August 2004 Amendment 92, Move Pressurizer Heat-up and Cooldown Limits to TRM and Remove Shutdown Requirements ML0612800742004-07-27027 July 2004 Amendment 91, New TRM 3.0/4.0 Section, Remove Shutdown Requirments Form TRM ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 2023-04-20
[Table view] |
Text
- (DRN 04-1244, Am. 99) 5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS 5.7-1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7-1.
TABLE 5.7-1 COMPONENT CYCLIC OR TRANSIENT LIMITS COMPONENT CYCLIC OR DESIGN CYCLE TRANSIENT LIMIT OR TRANSIENT Reactor Coolant System 500 system heatup cycles and Heatup cycle 500 cooldown cycles at rates Tcold from < 70 °F to > 541 °F;
< 100 °F / hr.
cooldown cycle Tcold from > 541 °F to < 70 °F.
- (DRN 06-1000, Am. 110) 200 pressurizer heatup and Heatup cycle - Pressurizer cooldown cycles at rates temperature from
< 200 °F / hr.
< 70 °F to > 653 °F; cooldown cycle
> 653 °F to < 70 °F
RCS pressurized to 3125 psia with RCS temperature > 60 °F above the most limiting components NDTT value.
200 leak testing cycles.
RCS pressurized to 2250 psia with RCS temperature greater than minimum for hydrostatic testing, but less than 400 °F.
200 seismic stress cycles.
Subjection to a seismic event equal to the operating basis earthquake (OBE).
480 cycles (any combination) of Trip from 100% of RATED reactor trip, turbine trip, or THERMAL POWER; Turbine complete loss of forced reactor trip (total load rejection from coolant flow.
100% of RATED THERMAL POWER followed by resulting reactor trip; simultaneous loss of all reactor coolant pumps at 100% of RATED THERMAL POWER.
5 complete loss of secondary Loss of secondary pressure from pressure cycles.
either steam generator while in MODE 1, 2, or 3.