ML15086A209

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual/Trm Revision 128/Trmindex
ML15086A209
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/10/2015
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15086A176 List:
References
W3F1-2015-0023
Download: ML15086A209 (9)


Text

(DRN 02-912)IAMENDMENT NO. 1, 2, 7, 12, 13, 15, 34, 38, 47, 50, 56, 58, 65, 69, 80, 90, 91, 92, 96, 100, 112, 118, 119, 124(DRN 02-912)

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE(EC-27790, Am. 119) 2.2 LIMITING SAFETY SYSTEM SETTINGS 2-12.2.1 REACTOR TRIP SETPOINTS 2-1(EC-27790, Am. 119)(DRN 04-1191, Am. 91) 3/4.0 LCO AND SR APPLICABILITY...................................................................

3/4 0-1 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATIONS SYSTEMS CHARGING PUMPS - APPENDIX R.......... 3/4 1-1 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION............................... 3/

4 3-1 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION........................................................---.. 3/4 3-4 3/4.3.3 MONITORING INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION------.... 3/4 3-7a INCORE DETECTORS......................................................----

3/4 3-8 SEISMIC INSTRUMENTATION.........................................----

3/4 3-9 METEOROLOGICAL INSTRUMENTATION......................---... 3/4 3-12 (DRN 02-912) (DRN 02-912) FIRE DETECTION INSTRUMENTATION..........................---- 3/4 3-15 LOOSE-PART DETECTION INSTRUMENTATION...........---- 3/4 3-22 RADIOACTIVE LIQUID EFFLUENT MONITORING..........---- 3/4 3-23 RADIOACTIVE GASEO US EFFLUENT.............................---- 3/4 3-31 3/4.3.4 TURBINE OVERSPEED PROTECTION........................................-.. 3/

4 3-39 (DRN 02-677) 3/4.3.5 ULTRASONIC FLOWMETERS----------------.. 3/4 3-40 (DRN 02-677) (DRN 03-1808, Am. 80, 04-1236, Am. 92, 05-04, Am. 96;05-880, Am. 100,07-201, Am. 112) 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.3 PRESSURIZER HEATERS-----------------.. 3/4 4-1 3/4.4.5 LEAKAGE DETECTION INSTRUMENTATION--..------.. 3/4 4-2 (LBDCR 13-003, Am. 124) 3/4.4.6 CHEMISTRY-----------------------.. 3/4 4-2(a) (LBDCR 13-003, Am. 124)3/4.4.8 PRESSURIZER HEATUP/COOLDOWN------------ 3/4 4-3 3/4.4.9 STRUCTURAL INTEGRITY-----------------. 3/4 4-4 (DRN 03-1808, Am. 80, 04-1236, Am. 92; 05-04, Am. 96;05-880, Am. 100,07-201, Am. 112)3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT LEAKAGE.................................................---.. 3/4 6-1 (DRN 05-880, Am. 100) DELETED...........................................................------.-..

3/4 6-5a (DRN 05-880, Am. 100)3/4.6.3 CONTAINMENT ISOLATION VALVES................................................ 3/4 6-6 (DRN 04-972, Am. 90)3/4.6.4 COMBUSTIBLE GAS MONITORING HYDROGEN ANALYZERS------------------ 3/4 6-18 (DRN 04-972, Am. 90)

(DRN 02-912; 02-1639)IIAMENDMENT NO. 15, 38, 50, 51, 58, 67, 70, 100, 103, 111, 124(DRN 02-912; 02-1639)

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.7 PLANT SYSTEMS 3/4.7.1.6.1 MAIN FEEDWATER REGULATING VALVES AND STARTUP FEEDWATER REGULATING VALVES............................................. 3/4 7-1 (DRN 02-1683) DELETED............................................................................................ 3/4 7-1a DELETED-------------------------- 3/4 7-1b (DRN 02-1683) (DRN 02-1794;05-880, Am. 100)3/4.7.1.7 DELETED-------------.------------. 3/4 7-1c (DRN 05-880, Am. 100) 3/4.7.3 COMPONENT COOLING WATER SYSTEM - APPENDIX R---- 3/4 7-1d (LBDCR 13-003, Am. 124) 3/4.7.5 FLOOD PROTECTION--------------------. 3/4 7-1e(a1) (LBDCR 13-003, Am. 124) (EC-15515, Am. 118) 3/4.7.8 SHOCK SUPPRESSORS SNUBBERS)------------- 3/4 7-1e (EC-15515, Am. 118)(LBDCR 13-003, Am. 124) 3/4.7.9 SEALED SOURCE CONTAMINATION-------------. 3/4 7-1e(10)(a1) (LBDCR 13-003, Am. 124) 3/4.7.10 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEMS..........................---.. 3/4 7-1f (DRN 02-1794) SPRAY AND/OR SPRINKLER SYSTEMS..........................--..-. 3/4 7-4 (DRN 02-912) DELETED-------------------------- 3/4 7-7 (DRN 02-912) FIRE HOSE STATIONS.......................................................--..- 3/4 7-8 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES---. 3/4 7-11 3/4.7.11 FIRE RATED ASSEMBLIES...................................................---.. 3/4 7-13 3/4.7.12 ESSENTIAL SERVICES CHILLED WATER SYSTEM CHILLERS - APPENDIX R.....................................................--.. 3/4 7-14 (DRN 02-912) 3/4.7.13 SWITCHGEAR AREA VENTILATION SYSTEM...........................--. 3/4 7-15 (DRN 02-912) (DRN 02-1876) 3/4.7.14 ESSENTIAL INSTRUMENT AIR SYSTEM-----------... 3/4 7-16 (DRN 02-1876) 3/4.8 ELECTRICAL POWER SYSTEMS (DRN 02-912; 02-1639; 05-1013,07-136 Am. 111) 3/4.8.1 A.C. SOURCES (DRN 02-912) OPERATING........................................................................................3/4 8-1 OPERATING/SHUTDOWN..................................................................3/4 8-2 3/4.8.3 ONSITE POWER DISTRIBUTION SYSTEMS-----------.3/4 8-3 (DRN 02-912; 02-1639) (DRN 05-1013,07-136 Am. 111)

(DRN 02-912) IIaAMENDMENT NO. 58, 99,100, 118, 124(DRN 02-912)

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE (DRN 07-136 Am. 111) 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES..........................-------. 3/4 8-4 (DRN 07-136 Am. 111) (DRN 05-880, Am. 100) MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION AND/OR BYPASS DEVICES.................---- 3/4 8-62 (DRN 05-880, Am. 100)3/4.9 REFUELING OPERATIONS (LBDCR 13-003, Am. 124) 3/4.9.5 COMMUNICATIONS--------------------. 3/4 9-1(a1) (LBDCR 13-003, Am. 124) 3/4.9.12 FUEL HANDLING BUILDING VENTILATION SYSTEM------ 3/4 9-1 3/4.11 RADIOACTIVE EFFLUENTS 3/4.11.1 LIQUID EFFLUENTS CONCENTRATION............................................................................ 3/4 11-1 (DRN 02-216

) DOSE................................................................................................. 3/4 11-16 LIQUID RADWASTE TREATMENT SYSTEM................................... 3/4 11-17 3/4.11.2 GASEOUS EFFLUENTS DOSE RA TE............................................................................

3/4 11-18 GASEOUS EFFLUENTS DOSE RATE............................................. 3/4 11-25 DOSE - IODINE-131, IODINE-133, TRITIUM AND RADIONUCLIDES IN PARTICULATE FORM........................ 3/4 11-26 (DRN 02-912) GASEOUS RADWASTE TREATMENT............................................ 3/4 11-27 (DRN 02-912) 3/4.11.3 SOLID RADIOACTIVE WASTE........................................................... 3/4 11-29 3/4.11.4 TOTAL DOSE...................................................................................... 3/4 11-30 (DRN 02-216)3/4.12 RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.1 MONITORING PROGRAM................................................................. 3/4 12-1 3/4.12.2 LAND USE CENSUS.......................................................................... 3/4 12-13 3/4.12.3 INTERLABORATORY COMPARISON PROGRAM............................ 3/4 12-14 (LBDCR 13-003, Am. 124) IIbAMENDMENT NO. 124(LBDCR 13-003, Am. 124) (LBDCR 13-003, Am. 124)

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE (DRN 04-1244, Am 99) 5.0 DESIGN FEATURES 5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS--------- 5.7-1 (DRN 04-1244, Am 99)(EC-15515, Am. 118)6.0 ADMINISTRATIVE CONTROLS 6.5.1 SNUBBER INSPECTION PROGRAM-------------- 6.5-1 (EC-15515, Am. 118)(LBDCR 13-003, Am. 124)

IIIAMENDMENT NO. 12, 13, 15, 34, 38, 50, 56, 58, 65, 69, 70, 80, 85, 90, 92, 100, 112, 119, 124 INDEXBASES SECTION PAGE(EC-27790, Am. 119)2.2.1 REACTOR TRIP SETPOINTS B 2-1 (EC-27790, Am. 119) (DRN 05-880, Am. 100)3/4.0 APPLICABILITY B 3/4 0-1 (DRN 05-880, Am. 100)3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATIONS SYSTEMS CHARGING PUMPS - APPENDIX R.................. B 3/4 1 3/4.3 INSTRUMENTATION (DRN 03-2115, Am. 85;05-880, Am. 100) 3/4.3.1and 3/4.3.2 REACTOR PROTECTIVE AND ENGINEERING SAFETY--.. B 3/4 1a FEATURES ACTUATION SYSTEMS INSTRUMENTATION 3/4 3.3.1 RADIATION MONITORING INSTRUMENTATION............----- B 3/4 1b 3/4 3.3.2 INCORE DETECTORS....................................................................... B 3/4 1b 3/4.3.3.3 SEISMIC INSTRUMENTATION........................................--........... B 3/4 1c 3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION....................................... B 3/4 1c 3/4.3.3.8 FIRE DETECTION INSTRUMENTATION........................................... B 3/4 1c (DRN 03-2115, Am. 85;05-880, Am. 100) 3/4.3.3.9 LOOSE-PART DETECTION INSTRUMENTATION............................. B 3/4 2 3/4.3.3.10 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION..................................................................... B 3/4 2 3/4.3.3.11 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION...................................................................... B 3/4 2 3/4.3.4 TURBINE OVERSPEED PROTECTION............................................ B 3/4 2 (DRN 02-677, Am. 56) 3/4.3.5 ULTRASONIC FLOWMETERS----------------. B 3/4 2a(DRN 02-677, Am. 56) (DRN 03-1808, Am. 80) 3/4.4 REACTOR COOLANT SYSTEM (DRN 04-1236, Am. 92;05-880, Am. 100)3/4.4.3 PRESSURIZER----------------------- B 3/4 2c (DRN 05-880, Am. 100)(DRN 07-201, Am. 112)3/4.4.5 LEAKAGE DETECTION INSTRUMENTATION B 3/4 2d (DRN 07-201, Am. 112) (LBDCR 13-003, Am. 124) 3/4.4.6 CHEMISTRY------------------------ B 3/4 4-2(a) (LBDCR 13-003, Am. 124)3/4.4.8 PRESSURE/TEMPERATURE LIMITS-------------. B 3/4 2f (DRN 04-1236, Am. 92) 3/4.4.9 STRUCTURAL INTEGRITY-----------------. B 3/4 2f (DRN 03-1808, Am. 80)

(DRN 02-912; 02-1639)IVAMENDMENT NO. 38, 50, 51, 58, 67, 100, 103, 118 , 124(DRN 02-912; 02-1639)

INDEXBASES SECTION PAGE 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT...........................................................-. B 3/4 3 3/4.6.1.2 CONTAINMENT LEAKAGE............................................................... B 3/4 3 (DRN 05-880, Am. 100)3/4.6.1.5 DELETED.......................................................................................... B 3/4 3 (DRN 05-880, Am. 100)3/4.6.3 CONTAINMENT ISOLATION VALVES...........................................- B 3/4 3 (DRN 04-972, Am. 90) 3/4.6.4 COMBUSTIBLE GAS MONITORING ------------.. B 3/4 3a (DRN 04-972, Am. 90) 3/4.7 PLANT SYSTEMS 3/4.7.1.6.1 MAIN FEEDWATER REGULATING VALVES AND STARTUP FEEDWATER REGULATING VALVES........................................... B 3/4 3b (DRN 02-1683, Am. 65; 02-1794, Am. 69) DELETED------------------------- B 3/4 3d (DRN 02-1683, Am. 65)(DRN 05-880, Am. 100) 3/4.7.1.7 DELETED------------------------... B 3/4 3e (DRN 05-880, Am. 100)3/4.7.3 COMPONENT COOLING WATER SYSTEM - APPENDIX R............ B 3/4 3g (DRN 02-1794, Am. 69) (LBDCR 13-003, Am. 124) 3/4.7.5 FLOOD PROTECTION-------------------- B 3/4 7-1e(a1) (LBDCR 13-003, Am. 124)(EC-15515, Am. 118) 3/4.7.8 SHOCK SUPPRESSORS (SNUBBERS)------------ B 3/4 3g(1) (EC-15515, Am. 118) (LBDCR 13-003, Am. 124) 3/4.7.9 SEALED SOURCE CONTAMINATION------------ B 3/4 7-1e(10)(a1) (LBDCR 13-003, Am. 124)3/4.7.10 FIRE SUPPRESSION SYSTEMS..................................................... B 3/4 4 3/4.7.11 FIRE RATED ASSEMBLIES............................................................. B 3/4 4 3/4.7.12 ESSENTIAL SERVICES CHILLED WATER SYSTEM CHILLERS -

APPENDIX R................................................................................. B3/4 4a (DRN 02-912, Am. 58) 3/4.7.13 SWITCHGEAR AREA VENTILATION SYSTEM --------- B 3/4 4b (DRN 02-912, Am. 58) (DRN 02-1876, Am. 70) 3/4.7.14 ESSENTIAL INSTRUMENT AIR---------------- B 3/4 4c (DRN 02-1876, Am. 70) 3/4.8 ELECTRICAL POWER SYSTEMS (DRN 02-1639; 05-1013, Am. 103) 3/4.8.1 A.C. SOURCES................................................................................... B 3/4 4f (DRN 02-1639; 05-1013, Am. 103) 3/4.8.3 ONSITE POWER DISTRIBUTION SYSTEMS---------.. B 3/4 5 (DRN 02-1639) 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES...................... B 3/4 5a (LBDCR 13-003, Am. 124)IVaAMENDMENT NO. 124(LBDCR 13-003, Am. 124)

INDEXBASES SECTION PAGE 3/4.9 REFUELING OPERATIONS (LBDCR 13-003, Am. 124) 3/4.9.5 COMMUNICATIONS------..------------ B 3/4 9-1(a1) (LBDCR 13-003, Am. 124)3/4.9.12 FUEL HANDLING BUILDING VENTILATION SYSTEM..................... B 3/4 5a 3/4.11 RADIOACTIVE EFFLUENTS 3/4.11.1.1 CONCENTRATION...........................................................................B 3/4 6 3/4.11.1.2 DOSE................................................................................................. B 3/4 6 3/4.11.1.3 LIQUID RADWASTE TREATMENT SYSTEM................................... B 3/4 7 3/4.11.2.1 DOSE RATE....................................................................................... B 3/4 7 3/4.11.2.2 DOSE - NOBLE GASES..................................................................... B 3/4 8 (DRN 02-216) 3/4.11.2.3 DOSE IODINE-131, IODINE-133, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM.................................. B 3/4 9 3/4.11.2.4 GASEOUS RADWASTE TREATMENT............................................... B 3/4 10 (DRN 02-216) 3/4.11.3 SOLID RADIOACTIVE WASTE........................................................... B 3/4 10 3/4.11.4 TOTAL DOSE...................................................................................... B 3/4 10 3/4.12 RADIOLOGICAL ENVIRONMENTAL MONITORING 3/4.12.1 MONITORING PROGRAM.................................................................. B 3/4 11 (DRN 05-880, Am. 100)3/4.12.2 LAND USE CENSUS...........................................................................B 3/4 12 (DRN 05-880, Am. 100)3/4.12.3 INTERLABORATORY COMPARISON PROGRAM............................ B 3/4 12 (DRN 02-912) VAMENDMENT NO. 38, 47, 50, 58, 119 (DRN 02-912 INDEXLIST OF TABLES TABLE PAGE(EC-27790, Am. 119) 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP 2-2 SETPOINT LIMITS 3.1-1 IMPACTED FIRE AREAS WITH CHARGING PUMP(S)

INOPERABLE-................................................................................ 3/4 1-2 3.3-1 REACTOR PROTECTIVE INSTRUMENTATION 3/4 3-1a 3.3-2 REACTOR PROTECTIVE INSTRUMENTATION RESPONSE TIMES................................................................................................ 3/4 3-2 4.3-1 REACTOR PROTECTIVE INSTRUMENTATION SURVEILLANCE 3/4 3-3a REQUIREMENTS (EC-27790, Am. 119) (DRN 02-912) 3.3-5 ENGINEERED SAFETY FEATURES RESPONSE TIMES................................................................................................. 3/4 3-5 (DRN 02-912 3.3-6 RADIATION MONITORING INSTRUMENTATION............................ 3/4 3-7b 4.3-3 RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS.................................................... 3/4 3-7d 3.3-7 SEISMIC MONITORING INSTRUMENTATION................................... 3/4 3-10 4.3-4 SEISMIC MONITORING INSTRUMENTATION................................... 3/4 3-11 3.3-8 METEOROLOGICAL MONITORING INSTRUMENTATION................ 3/4 3-13 4.3-5 METEOROLOGICAL MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS..................................................... 3/4 3-14 3.3-11 FIRE DETECTION INSTRUMENTS..................................................... 3/4 3-17 3.3-12 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION............................................................................ 3/4 3-24 4.3-8 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS................. 3/4 3-28 3.3-13 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION........................................................................... 3/4 3-32 4.3-9 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS................. 3/4 3-36 3.6-1 CONTAINMENT LEAKAGE PATHS..................................................... 3/4 6-2 3.6-2 CONTAINMENT ISOLATION VALVES................................................. 3/4 6-7 (DRN 02-912)VIAMENDMENT NO. 38, 47, 50, 51, 58, 99

, 100, 118(DRN 02-912)

INDEXLIST OF TABLES TABLE PAGE(DRN 05-880, Am. 100)3.7-1 IMPACTED FIRE AREAS WITH CCW PUMP(S) INOPERABLE....... 3/4 7-1e (DRN 05-880, Am. 100)3.7-2 SPRAY AND/OR SPRINKLER SYSTEMS......................................... 3/4 7-6 3.7-4 FIRE HOSE STATIONS.................................................................... 3/4 7-9 3.7-5 YARD FIRE HYDRANTS AND ASSOCIATED HYDRANT HOSE HOUSES................................................................................. 3/4 7-12 3.7-12 IMPACTED FIRE AREAS WITH CHW PUMP(S) OR CHILLER(S) INOPERABLE.................................................................................... 3/4 7-14a (EC-15515, Am. 118)3.7.8-1 LIST OF SNUBBERS WITH SEISMIC LOADS ONLY------. 3/4 7-1e(3) 3.7.8-2 LIST OF SNUBBERS WITH DYNAMIC LOADS--------- 3/4 7-1e(5) (EC-15515, Am. 118)(DRN 02-912)3.8-1 CONTAINMENT PENETRATION CONDUCTOR OVER-CURRENT PROTECTIVE DEVICES.................................................................... 3/4 8-1a 3.8-2 MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION AND/OR BYPASS DEVICES....................................... 3/4 8-62 (DRN 02-912)4.11-1 RADIOACTIVE LIQUID WASTE SAMPLING AND ANALYSIS PROGRAM............................................................... 3/4 11-2 (DRN 02-216)4.11-2 RADIOACTIVE GASEOUS WASTE SAMPLING AND ANALYSIS PROGRAM............................................................... 3/4 11-19 (DRN 02-216)3.12-1 RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM...... 3/4 12-3 3.12-2 REPORTING LEVELS FOR RADIOACTIVITY CONCENTRATIONS IN ENVIRONMENTAL SAMPLES..................................................... 3/4 12-10 4.12-1 DETECTION CAPABILITIES FOR ENVIRONMENTAL SAMPLE ANALYSIS. ......................................................................... 3/4 12-11 (DRN 04-1244, Am. 99) 5.7-1 COMPONENT CYCLIC OR TRANSIENT LIMITS--------.. 5.7-1 (DRN 04-1244, Am. 99)