MONTHYEARML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G W3F1-2021-0035, Technical Requirements Manual Update2021-05-18018 May 2021 Technical Requirements Manual Update W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6652017-12-0606 December 2017 Technical Requirements Manual Update to the NRC ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G W3F1-2016-0040, Technical Requirements Manual Update to the NRC2016-06-0202 June 2016 Technical Requirements Manual Update to the NRC ML16132A5102015-10-15015 October 2015 3 to EN-RW-102, Radioactive Shipping Procedure. ML16132A5072015-08-27027 August 2015 to EN-RW-105, Process Control Program. ML16132A5082015-04-0808 April 2015 to EN-RW-106, Integrated Transportation Security Plan. ML16132A5062015-04-0202 April 2015 2 to EN-RW-104, Scaling Factors. W3F1-2016-0038, UNT-005-014, Rev. 306, Offsite Dose Calculation Manual.2015-03-12012 March 2015 UNT-005-014, Rev. 306, Offsite Dose Calculation Manual. W3F1-2015-0023, Technical Requirements Manual/Trm Revision 128/Trm34122015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3412 ML15086A1812015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC2.0 ML15086A1822015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC5.0 ML15086A1832015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC6.0 ML15086A1862015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm340 ML15086A1872015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm341 ML15086A1892015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm344 ML15086A2112015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3411 ML15086A2102015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmintro ML15086A2092015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmindex ML15086A2082015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmbases ML15086A2062015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm349 ML15086A1882015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm343 ML15086A2032015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm346 ML15086A2042015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm347 ML15086A2052015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm348 ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G W3F1-2011-0018, License Amendment Request to Relocate Technical Specifications to the Technical Requirements Manual2011-11-21021 November 2011 License Amendment Request to Relocate Technical Specifications to the Technical Requirements Manual W3F1-2011-0033, UNT-005-014, Rev. 302, Offsite Dose Calculation Manual.2011-02-14014 February 2011 UNT-005-014, Rev. 302, Offsite Dose Calculation Manual. ML0904103222008-04-15015 April 2008 Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 ML0612303022004-10-20020 October 2004 Corp. Administrative Procedure AP 31A-100, Revision 5, Solid Radwaste Process Control Program. ML0612303002004-09-29029 September 2004 Corp. Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. ML0512504582004-09-0909 September 2004 Attachment 11.1, UNT-005-514, Offsite Dose Calculation Manual, Revision 7, Change 1 & 2 ML0612800752004-08-12012 August 2004 Amendment 92, Move Pressurizer Heat-up and Cooldown Limits to TRM and Remove Shutdown Requirements ML0612800742004-07-27027 July 2004 Amendment 91, New TRM 3.0/4.0 Section, Remove Shutdown Requirments Form TRM ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 2023-04-20
[Table view] |
Text
3/4 9-1 AMENDMENT NO. 50 , 91 REFUELING OPERATIONS 3/4.9.12 FUEL HANDLING BUILDING VENTILATION SYSTEM
LIMITING CONDITION FOR OPERATION
3.9.12 Two independent fuel handling building ventilation systems shall be OPERABLE.
APPLICABILITY: Whenever irradiated fuel is in the spent fuel pool.
ACTION: a. With one fuel handling building ventilation system inoperable, fuel movement within the spent fuel pool or crane operation with loads
over the spent fuel pool may proceed provided the OPERABLE fuel handling building ventilation system is capable of being powered from an OPERABLE emergency power source and is in operation and discharging through at least one train of HEPA filters and charcoal adsorbers.
- b. With no fuel handling building ventilation system OPERABLE, suspend all operations involving movement of fuel within the spent fuel pool or crane operation with loads over the spent fuel pool until at least one fuel handling building ventilation system is restored to OPERABLE status.
(DRN 04-1191, Am. 91)
- c. The provisions of TRM LCO 3.0.4 are not applicable. (DRN 04-1191, Am. 91)
SURVEILLANCE REQUIREMENTS 4.9.12 The above required fuel handling building ventilation systems shall be
demonstrated OPERABLE:
- a. At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the system operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> continuous with the heaters on.
- a. At least once per 18 months by:
- 1. Verifying that on a high radiation test signal, the system automatically starts (unless already operating) and draws flow through the HEPA filters and charcoal adsorber banks.
- 2. Verifying that the system maintains the spent fuel pool area at a negative pressure of greater than or equal to 1/2-inch water gauge relative to the outside atmosphere during system operation
(LBDCR 13-003, Am. 124) 3/4 9-1(a1) AMENDMENT NO. 124(LBDCR 13-003, Am. 124)(LBDCR 13-003, Am. 124)REFUELING OPERATIONS 3/4.9.5 COMMUNICATIONS LIMITING CONDITION FOR OPERATION 3.9.5 Direct communications shall be maintained between the control room and personnel at the refueling station. APPLICABILITY: During CORE ALTERATIONS. ACTION: When direct communications between the control room and personnel at the refueling station cannot be maintained, suspend all CORE ALTERATIONS. SURVEILLANCE REQUIREMENTS 4.9.5 Direct communications between the control room and personnel at the refueling station shall be demonstrated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the start of and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS. (LBDCR 13-003, Am. 124)