MONTHYEARIR 05000321/20254032025-02-18018 February 2025 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000321/2025403 and 05000366/2025403 ML24352A0992024-12-16016 December 2024 Document Request for Hatch Nuclear Plant - Baseline Radiation Protection Inspection - Inspection Report 2025-01 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 ML22073A0842022-03-21021 March 2022 An NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) ML21207A1072021-07-26026 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20239A7462020-08-25025 August 2020 Rif Letter to Plant Hatch Simulator Inspection 41502 ML20027B4162020-01-27027 January 2020 Notification of Inspection and Request for Information IR 05000321/20190052019-08-27027 August 2019 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Reports 05000321/2019005 and 05000366/2019005 IR 05000321/20180062019-03-0404 March 2019 Annual Assessment Letter for Edwin I. Hatch - Report 05000321/2018006 and 05000366/2018006 IR 05000021/20190112019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML19008A2872018-12-20020 December 2018 RP Document Request ML18298A0982018-10-24024 October 2018 Emergency Preparedness Program Inspection Request for Information IR 05000321/20180052018-08-23023 August 2018 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005 ML18087A3592018-03-27027 March 2018 Eff & REMP Emailed Information and Doc Request ML18059A1402018-02-28028 February 2018 EOC Assessment Letter IR 05000321/20170052017-08-28028 August 2017 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Report 05000321/2017005 and 05000366/2017005 ML17142A2202017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000321/20160062017-03-0101 March 2017 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 (Report 05000321/2016006 and 05000366/2016006) ML17021A0002017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000321/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Report 05000321/2016005 and 05000366/2016005 ML16062A1842016-03-0202 March 2016 Annual Assessment Letter ML16014A7052016-01-14014 January 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos.0500321/2016007 and 05000366/2016007) ML16011A3542016-01-11011 January 2016 Notification of Inspection and Request for Information ML15267A4122015-09-23023 September 2015 Notification of Inspection and Request for Information for U.S. Nuclear Regulatory Commission Problem Identification and Resolution Inspection IR 05000321/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2015005 and 05000366/2015005) IR 05000321/20140012015-03-0404 March 2015 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001) ML15008A4192015-01-0808 January 2015 Notification of Inspection and Request for Information ML14351A1712014-12-17017 December 2014 PSB1 RP RFI Letter 2015-001 ML14245A1692014-09-0202 September 2014 Mid-Cycle Letter IR 05000321/20130012014-03-0404 March 2014 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2013001 and 05000366/2013001) ML14009A2382014-01-0909 January 2014 Notification of Inspection and Request for Information ML13310A6762013-11-0606 November 2013 PSB1 RP RFI Letter ML13246A1152013-09-0303 September 2013 Mid Cycle Assessment Letter ML13175A3312013-06-24024 June 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20120012013-03-0404 March 2013 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2012001 and 366/2012001) IR 05000321/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan – Edwin I. Hatch Nuclear Plant (IR 05000321-12-006, 05000366-12-006) ML12065A2302012-03-0505 March 2012 Report 22 2025-02-18
[Table view] Category:Letter
MONTHYEARML24348A2282025-02-25025 February 2025 Issuance of Amendments Nos. 327 and 272, Regarding License Amendment Request to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20254032025-02-18018 February 2025 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000321/2025403 and 05000366/2025403 NL-24-0335, License Amendment Request to Revise Technical Specification Surveillance Requirements for Diesel General Loading2025-02-0606 February 2025 License Amendment Request to Revise Technical Specification Surveillance Requirements for Diesel General Loading IR 05000321/20240042025-02-0505 February 2025 Integrated Inspection Report 5000321/2024004 and 05000366/2024004 NL-24-0421, Submittal of the Inservice Testing Program Alternative Requests and Relief Requests for Pumps and Valves - Sixth Ten-Year Interval2025-01-30030 January 2025 Submittal of the Inservice Testing Program Alternative Requests and Relief Requests for Pumps and Valves - Sixth Ten-Year Interval ML24365A0402025-01-28028 January 2025 Issuance of Amendments Nos. 326 and 271, Regarding LAR to Adopt Technical Specification Task Force Traveler TSTF-591, Revise Risk Informed Completion Time Program ML24351A0802025-01-24024 January 2025 Issuance of Amendments Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-24-0117, Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assura2025-01-23023 January 2025 Change to Quality Assurance Program to Adopt Regulatory Guide 1.8 Revision 4 and License Amendment Request to Relocate Control of the Unit/Facility/Plant Staff Qualification Requirements from Technical Specifications to the Quality Assuranc ML25008A0372025-01-15015 January 2025 Audit Summary Report for the Exemption Requests Regarding Physical Barriers NL-25-0014, Withdrawal of Request for Exemption from Physical Barrier Requirements2025-01-15015 January 2025 Withdrawal of Request for Exemption from Physical Barrier Requirements ML25008A2482025-01-15015 January 2025 Acknowledgement of the Withdrawal of the Requested Exemptions for Physical Barriers ML24352A1662024-12-20020 December 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Summary ML24312A3672024-12-20020 December 2024 Issuance of Amendments Nos. 324 and 269 Regarding Revision to TS to Adopt Risk-Informed Completion Times for Residual Heat Removal Service Water and Plant Service Water Systems IR 05000321/20240112024-12-19019 December 2024 Comprehensive Engineering Team Inspection Report 05000321/2024011 and 05000366/2024011 IR 05000321/20244022024-12-10010 December 2024 – Security Baseline Inspection Report 05000321/2024402 and 05000366/2024402 ML24281A0972024-12-0909 December 2024 Issuance of Amendments Nos. 323 and 268, Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints 05000321/LER-2024-004, Manual Reactor Trip During Hurricane Helene Due to Degrading Condenser Vacuum2024-11-19019 November 2024 Manual Reactor Trip During Hurricane Helene Due to Degrading Condenser Vacuum ML24302A2972024-11-15015 November 2024 Regulatory Audit Report in Support of Review of the License Amendment Request to Revise TS 1.1 and Add New TSs 5.5.21 and 5.5.17 NL-24-0397, Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement2024-11-15015 November 2024 Response to Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement ML24320A1342024-11-15015 November 2024 Regulatory Audit in Support of Review of the Exemption Requests Regarding Physical Barriers EPIDs L-2023-LLE-0018 and -0021 (Nonproprietary Cover Letter) IR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations 2025-02-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 17, 2014 Mr. David R. Vineyard Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Vineyard:
During the weeks of February 09 - 13, 2015, and February 23 - 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Occupational Radiation Safety Inspection at the Edwin I. Hatch Nuclear Plant. The inspection will consist of NRC Inspection Procedures (IPs) 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, and Radiation Safety sections of 71151.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The NRC requests that these documents be provided to the NRC staff no later than January 23, 2015.
We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory onsite contact for this inspection will be Mr. Steve Tipps of your organization.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Carmen Dykes at 404-997-4401, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
This letter does not contain new, or amended, information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
D. Vineyard 2
requirements were approved by the Office of Management and Budget under control numbers 3150-0044, 3150-0135, 3150-0014, 3150-0011, and 3150-0008. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information, or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5
Enclosure:
Document Request List cc: Distribution via Listserv
ML14351A171 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE CMD4 WTL for BRB1 NAME C. Dykes B. Bonser DATE 12/ 17 /2014 12/ 17 /2014 E-MAIL COPY YES NO YES NO
Enclosure DOCUMENT REQUEST LIST Site: Hatch Nuclear Plant Report Number: 05000321-366/2015001 Inspection Dates:
February 09 - 13, 2015 and February 23 - 27, 2015 Inspection Procedures:
IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational As Low As Reasonably Achievable Planning and Controls IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation IP 71124.04 Occupational Dose Assessment IP 71124.05 Radiation Monitoring Instrumentation IP 71151 Performance Indicator Verification NRC Inspector:
Carmen Dykes (Carmen.Dykes@nrc.gov)
Health Physicist US NRC Region II 404-997-4401 Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. The preferred file format is Word or searchable.pdf files on CDROM. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Experience has shown that a well-organized CD leads to a more efficient inspection, and lessens additional burden on licensee staff. During the inspection, the inspectors may request additional documents.
General Information Needed
- 1. List of primary contacts for each inspection area; with phone numbers.
- 2. Electronic copy of Updated Final Safety Analysis Report (UFSAR) chapters 11 and 12.
(radwaste and radiation protection)
- 3. Copy of FSAR for independent spent fuel storage installation (ISFSI).
- 4. Corrective action program (CAP) procedure.
- 5. Outage schedule of major activities (Gantt chart if available).
- 6. Current Part 61 Analysis Results for dry active waste (DAW) 71124.01 Radiological Hazard Assessment and Exposure Controls (Last Inspected 2/10/14)
- 1. List of outage Radiation Work Permits (RWPs).
- 2. Procedures related to Health Physics (HP) controls (e.g., Posting, labeling, surveys, RWPs, contamination control, high radiation area(HRA)/locked high radiation area (LHRA)/very high radiation area (VHRA) control, key control, control of divers, special controls during fuel offload, hot spots, etc.).
- 3. List of locations of all locked HRAs and VHRAs. Include areas with the potential to become a LHRA during routine operations or outages.
2
- 4. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm followup, etc.).
- 5. List of Nationally Tracked Sources and any change-of-ownership or inventory transactions.
- 6. Inventory list of all sealed sources stored onsite.
- 7. List of all non-fuel items stored in spent fuel pool.
- 8. All self-assessment or audit covering HP controls since January 2014 (if none, then provide the most recent).
- 9. LIST of condition reports (CRs) regarding radiological hazard assessment and exposure controls (e.g., HRA/LHRA/VHRA controls, posting, surveys, radworker performance, HP tech performance) issued since January 2014. [This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
- 10. All CRs related to Nationally Tracked Sources since January 2014.
71124.02 Occupational As Low As Reasonably Achievable Planning and Controls (Last Inspected 2/25/2013)
- 1. All procedures related to As Low As Reasonably Achievable (ALARA) (e.g., temporary shielding, ALARA planning, source term reduction, etc.).
- 2. List of top five dose jobs for the upcoming refueling outage and ALARA planning packages, if available.
- 3. List of temporary shielding requests generated for the upcoming outage.
- 4. Crudburst/cleanup and trending point data for last two outages.
- 5. Source term reduction strategic plan, if available.
- 6. Most recent self-assessment or audit of ALARA program.
- 7. Most recent annual ALARA report, and most recent refueling outage report, if available.
- 8. Annual ALARA goals for 2015 and the methodology utilized to make the projections.
- 9. Completed ALARA packages (including post-job reviews) for five work activities completed during the previous outage which had the greatest collective dose.
- 10. LIST of CRs related to ALARA since January 2013. [This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
71124.03 In-Plant Airborne Radioactivity Control and Mitigation (Last Inspected 2/25/2013)
- 1. Procedures related to airborne monitoring and control (e.g., use of containment purge, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of continuous air monitors (CAMs), air sampling guidance, Alpha air sampling, etc.).
- 2. Procedures related to the use of respiratory protection devices, (e.g., self-contained breathing apparatus (SCBA), Total Effective Dose Equivalent (TEDE)-ALARA guidance, powered air purifying respirators (PAPRs), storage, maintenance, training, quality assurance (QA), fit-testing, etc.).
- 3. All records of grade D air certification for supplied air system, and SCBA filling equipment since January 2013.
- 4. SCBA qualification records
- a. Vendor training certificates for all individuals qualified to repair SCBA
- b. List of all licensed operators qualified to use SCBA
- c. List of all maintenance personnel qualified to use SCBA
- d. List of all HP personnel qualified to use SCBA
- 5. Documentation for last two surveillances performed on SCBA stored for emergency use.
3
- 6. Two most recent HEPA filter dioctyplthalate (DOP) and charcoal test results; or the following ventilation systems:
- a. Main Control Room
- b. Auxiliary Ventilation Exhaust
- 7. Most recent audit or self-assessment covering airborne controls and respiratory protection.
- 8. LIST of CRs related to airborne monitoring and respiratory protection since January 2013.
[This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
71124.04 Occupational Dose Assessment (Last Inspected 2/25/2013)
- 1. Procedures related to occupational dose assessment (e.g., external dose monitoring, dosimetry issuance and use, unusual dosimetry occurrences, multi-badging/extremity dosimetry/badge relocation, Effective Dose Equivalent, personnel contamination events, storage/care of personal dosimeters, use of electronic dosimeters, in-vivo and in-vitro internal dose assessment, skin dose assessment, quality control for whole body counter (WBC), use of passive monitoring, if applicable, declared pregnant workers).
- 2. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by site.
- 3. LIST of all positive whole body counts, in vitro, or air-sampling analyses which resulted in an assigned Committed Effective Dose Equivalent (CEDE), equal to or exceeding, 10 millirem since January 2013. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection.]
- 4. LIST of all personnel contamination events identified since January 2011. Include full documentation for any personnel containment events (PCEs) requiring skin dose assessment. [Note: Only a listing should be provided, for use by the inspectors, to select a sample of issues for in-depth review during the onsite inspection, however; please include full dose assessment documentation as applicable.]
- 5. Most recent audit or self-assessment of the dosimetry program, and the most recent audit of the lab that processes site dosimetry.
- 6. LIST of CRs generated since January 2013, for internal or external dosimetry issues/events.
[This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
71124.05 - Radiation Monitoring Instrumentation (Last Inspected 2/25/2013)
- 1. Procedures/Guidance Documents for:
- a. Use of portable instrument calibrators (e.g., Shepherd calibrator).
- b. Calibration and functional test/source checks of portable radiation detection instrumentation.
- c. Calibration and functional tests of small article monitor (SAM); personnel contamination monitor (PCM); portal monitor (PM); WBC equipment; and CAMs.
- d. Determination of set-points for Area Radiation Monitor (ARM), CAM, PCM, PM, and SAM equipment.
- e. Collection and analysis of high-range, post-accident effluent samples.
- f.
QA program for count room instruments.
- 2. Provide the last two calibration records for the following Unit 1 monitors:
- a. Reactor building ventilation exhaust radiation monitors
4
- b. Vent stack radiation monitors
- c. Drywell high range area monitors
- d. Main control room air intake radiation monitors
- e. Radwaste area monitors
- f. List of the last two calibration dates for listed monitors in Unit 2
- 3. Documentation for the sources used to calibrate the above requested monitors showing traceability to a national standard, National Institute of Standards & Technology/National Bureau of Standards (NIST/NBS), and to the primary calibration, as applicable.
- 4. The last two surveillances performed on the Post-accident Sampling System (PASS).
- 5. The last test record of the instrument calibrator (Shepherd validation testing/dose rate curves).
- 6. Last two system health reports for the Radiation Monitoring system.
- 7. Copies of all audits, self-assessments, and/or reviews of radiation monitoring equipment, and portable radiation survey instruments, generated since January 2013. The records should include any reviews conducted of vendor facilities (e.g., outside calibration laboratories, as applicable).
- 8. LIST of CRs generated since January 2013, related to portable instruments, effluent and area monitors, CAMs, radiological controlled area (RCA) release point monitors, WBCs, and count room instruments. [This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
Performance Indicator Verification (Occupational and Public Cornerstones)
(Last Inspected 2/10/2014)
- 1. Procedure for gathering and reporting performance indicator (PI) data.
- 2. List of all CRs related to effluent dose/offsite dose calculation manual (ODCM) issues since January 2014. [This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
- 3. LIST of all CRs related to LHRA/VHRA issues, and unintended dose issues since January 2011. [This should be a list of corrective action documents containing a CR number and brief description, not full CRs.]
- 4. Most recent gaseous and liquid effluent release permits showing year-to-date doses to the public.
- 5. LIST of electronic dosimeter (ED) alarms since January 2014 (dose and dose rate).
LIST OF ACRONYMS ALARA As Low As Reasonably Achievable ARM Area Radiation Monitor CAMs Continuous Air Monitors CAP Corrective Action Program CEDE Committed Effective Dose Equivalent CRs Condition Reports DAW Dry Active Waste DOP Dioctyplthalate ED Electronic Dosimeter HP Health Physics HRAs High Radiation Areas IP Inspection Procedure
5 ISFSI Independent Spent Fuel Storage Installation LHRA Locked High Radiation Area NIST National Institute of Standards and Technology NVLAP National Voluntary Laboratory Accreditation Program ODCM Offsite Dose Calculation Manual PAPRs Powered Air Purifying Respirators PASS Post-accident Sampling System PCE Personnel Containment Event PCM Personnel Contamination Monitor PIs Performance Indicators PM Portal Monitor QA Quality Assurance QC Quality Control RCA Radiological Controlled Area RSPS Risk Significant Planning Standard RWPs Radiation Work Permits SAM Small Article Monitor SCBA Self-contained Breathing Apparatus TEDE Total Effective Dose Equivalent UFSAR Updated Final Safety Analysis Report VHRA Very High Radiation Area WBC Whole Body Counter