UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 23, 2015 Mr. David R. Vineyard Site Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR U.S. NUCLEAR REGULATORY COMMISSION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Mr. Vineyard:
This letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a biennial problem identification and resolution (PI&R) inspection at your Edwin I.
Hatch Nuclear Plant, during the weeks of November 16-20 and December 7-11, 2015. This inspection will be conducted in accordance with Inspection Procedure 71152, Problem Identification and Resolution. This inspection complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
The inspection team will be led by Dr. Abhijit Sengupta. Dr. Sengupta confirmed with Mr. Jimmy Collins, of your staff, the arrangements for the 2-week onsite inspection. Prior to the onsite inspection, Dr. Sengupta will discuss with your staff the following inspection support details:
availability of knowledgeable plant engineering and licensing personnel to serve as points of contact; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
The Enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than October 23, 2015. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control numbers 3150-0044, 3150-0014, 3150-0011, and 3150-0008. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
D. Vineyard 2
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding of the NRCs Agency Rules of Practice and Procedure, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS);
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Dr. Sengupta at 404-997-4430.
Sincerely,
/RA by Ryan Taylor Acting for/
Anthony D. Masters, Chief Reactor Projects Branch 7 Division of Reactor Projects Region II Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5
Enclosure:
Information Request cc: Distribution via Listserv
ML15267A412 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRP/BR7 RII:DRP/BR7 SIGNATURE AXS2 RCT1 RCT1 for ADM2 NAME A. Sengupta R. Taylor A. Masters DATE 9/ 23 /2015 9/ 23 /2015 9/ 23 /2015 E-MAIL COPY YES NO YES NO YES NO
Enclosure INFORMATION REQUEST FOR EDWIN I. HATCH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (NOVEMBER 16-20 AND DECEMBER 7-11, 2015)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 5, 2013. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
- 1.
Copies of the corporate and site level procedures, and sub-tier procedures, associated with the corrective action program (CAP). This should include procedures related to:
(a) Corrective action process (b) Cause evaluation (c) Operating experience (OE) program (d) Employee concerns program (e) Self-assessment program (f) Maintenance rule program and implementing procedures (g) Operability determination process (h) Degraded/non-conforming condition process (e.g., RIS 2005-20)
(i) System health process or equivalent equipment reliability improvement programs (j) Preventive maintenance deferral and Condition Report (CR) extension process If any of the procedures requested above were revised after October 5, 2013, please provide (or have available) copies of all revisions during the onsite inspection.
- 2.
List of top 10 risk-significant systems, top 10 risk-significant components for each one of the top 10 risk-significant systems, and top 10 risk-significant operator manual actions.
- 3.
List of all CRs initiated including the following information for each CR:
(a) CR number (b) Brief, but complete problem description (c) Priority or level (d) Affected system (e) Affected component (f) Responsible plant department (g) CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
CR #
Problem Priority System Component Org Status CR001 A RHR Pump failed flow criteria per SR 5.0.5.4 2
RHR 2-RHR-PMP-A ENG Open
2
- 4.
List of outstanding corrective actions including the following information for each action:
(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation)
(c) Brief, but complete corrective action description (d) Associated CR number (e) Corrective action initiation date (f) Number of extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
Corrective Action #
Type Description CR Initiation Date Extensions Due Date Status AR0034 CAPR Revise Procedure NGK-003-4585 CR0058 01/05/08 2
06/15/08 Closed
- 5.
List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number.
- 6.
List of operator workarounds and operator burdens with a brief description and corresponding CR number.
- 7.
List of all currently extended or overdue CRs, sorted by initiation date, with the following information:
(a) CR number (b) Priority or Significance (c) CR title and short description
- 8.
List of all CRs that have been voided or cancelled. Please provide the following information for each CR:
(a) CR number (b) Brief, but complete problem description (c) Reason voided or cancelled
- 9.
List of all structures, systems, and components which were classified as (a)(1) in accordance with the Maintenance Rule since October 2013. Please include the following information for each system in (a)(1):
(a) Date of classification in (a)(1)
(b) Reason for being placed in (a)(1)
(c) Planned actions and their status
3
- 10.
List of Maintenance Preventable Functional Failures of risk-significant systems. Please include actions completed and current status.
- 11.
List of corrective maintenance WOs. Please include the following information for each work order:
(a) WO number (b) Brief, but complete work description (c) Affected system and components (d) Date of initiation (e) Date of completion (if completed)
If possible, provide this list in a format compatible with spreadsheet software (example shown below).
Work Order #
Description System Component Initiation Date Due Date Status WO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump.
SI 2A-SI-PMP, BKR-08-BB4 01/05/08 03/15/09 Closed
- 12.
Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Please include a cross reference linking NRC findings and LIVs to appropriate CR numbers.
- 13.
Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER numbers to appropriate CR numbers.
- 14.
List of all NRC generic communications (e.g., Information Notices, Generic Letters) and industry OE documents (e.g., Part 21 reports, vendor information letters, information from other sites) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR #) for the documents that evaluated the aforementioned generic communications and OE information.
- 15.
Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP.
- 16.
Copies of all department self-assessments for those programs related to the CAP (e.g.
OE, Maintenance Rule).
- 17.
Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
- 18.
Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as available.
4
- 19.
Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
- 20.
List of CRs related to equipment aging issues in the top 10 risk-significant systems since September 1, 2010, (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;
environmental qualification). Please provide the following information for each CR:
(a) CR number (b) Priority or Significance (c) CR problem description
- 21.
If performed, please provide any recent self-assessment of the site safety culture.
- 22.
Copies of CAP documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee, or other oversight methods.
- 23.
List of all root cause evaluations with a brief description. Please include a cross reference linking the evaluations to appropriate CR numbers.
- 24.
Copy of Probabilistic Risk Assessment importance measures report, if available.
- 25.
Copies of System Health Reports, system design basis documents, and system description information for the top 10 risk-significant systems.