SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000321/2024402 AND 05000366/2024402
Dear Jamie M. Coleman:
On November 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant, Units 1&2 and discussed the results of this inspection with M. Busch and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety and Security Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000321 and 05000366
License Numbers:
Report Numbers:
05000321/2024402 and 05000366/2024402
Enterprise Identifier:
I-2024-402-0031
Licensee:
Southern Nuclear Operating Co., Inc.
Facility:
Edwin I. Hatch Nuclear Plant, Units 1&2
Location:
Baxley, GA
Inspection Dates:
November 18, 2024 to November 21, 2024
Inspectors:
M. Denman, Physical Security Inspector
R. Patterson, Senior Physical Security Inspector
J. Stovall, Physical Security Inspector
J. Wallo, Senior Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Edwin I. Hatch Nuclear Plant, Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: All Requirements
- Tier II: (02.06 a, b, 02.07 a, 02.08 a, b, d, f, g)
- Tier III: (02.10)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP.
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All requirements
- Tier II: 02.09 (a, b), 02.11 (a, d)
- Tier III: 02.14, 02.15 (c)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: All Requirements
- Tier II: 02.05(a,b,c,d), 02.06(a,b), 02.07(a), 02.08(a), 02.09(a,b)
- Tier III: 02.10, 02.11(a), 02.12(a,b), 02.13(a,b,c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC baseline inspection of this program area, Edwin I. Hatch Security Plan Revision18-HNP-2.1 to 18-HNP-2.2 was implemented. Based on Southern Nuclear Company's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s) continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s).
Therefore, the change(s) remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) November 2023 - October
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 21, 2024, the inspectors presented the security baseline inspection results to M. Busch and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
11123525,
11115394,
11115490,
11115787,
11115965,
11024536,
11032064,
1114511
Corrective Action
Documents
TE-1139788
Corrective Action
Documents
Resulting from
Inspection
11129649
Key and Annunciated Door Control
Version 4.4
NMP-AD-016
Fatigue Management Program
Version 11
NMP-AD-016-001
Self-Declaration, Waivers, and Fatigue Assessment
Version 8.2
NMP-AD-016-002
Scoping of Work Hours Limits
Version 8
NMP-AD-016-003
Scheduling and Calculating Work Hours
Version 9
NMP-AD-016-004
Reviews and Reporting
Version 11
NMP-SE-021
Security Search Process
Version 16
Procedures
NMP-SE-023
Personnel Authorization and Badging Program
Version 6
Self-Assessments
Threat Assessment
Version 13
11123478
Corrective Action
Documents
71130.04 CRs
Equipment
Performance
Testing and
Maintenance
Licensee provided CRs pertaining to equipment
performance, testing and maintenance
Various Hatch Security Equipment Test and Maintenance
Records
Miscellaneous
Various Security Logs
Procedures
Daily Testing of Security Systems
1.1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Weekly Testing of Security Systems
1.1
Weekly Testing of Security Systems
Version 1.2
Semi-Annual Testing of Security Systems
1.0
SNC 1466189
Security Diesel Generator PM
4/24/2024
Work Orders
SNC 1599291
Security Diesel Generator PM
10/23/2024
Corrective Action
Documents
71130.07 CRs
Security Training
Licensee provided CRs pertaining to security training
Daylight Rifle Course (course of fire approval letter)
2-01-2023
Night Fire Rifle Course (course of fire approval letter)
05-02-2024
Security Officer Training Files (samples)
24
Miscellaneous
Medical Examination Reports (samples)
24
H-SE-JPM-Task
9.0
Conduct Security Communications (OJT Completion Guide)
HNP-2.2
Training and Qualification Plan
NMP-SE-005
Security Firearms Maintenance
10.0
NMP-SE-008
Use of Force
NMP-SE-020
SNC Security Training Program
8.2
NMP-SE-020-F05
Rifle
2.0
Procedures
NMP-SE-020-F05
Watchperson Patrol
2.0
Self-Assessments
APG-23
Security Audit (Security Training and Qualification)
11079852
Corrective Action
Documents
TE-1105188
Procedures
NMP-AD-008
Applicability Determination
Version 23.1
NMP-AD-029
Preparation and Reporting of Regulatory Assessment
Performance Indicator Data and Monthly Operating Report
Version 4
71151
Procedures
NMP-AD-034
Key Performance Indicators
Version 13.2