Other: 05000206/LER-1980-031, Forwards LER 80-031/03L-0, 05000206/LER-1980-031-03, /03L-0:on 800728,during Routine Equipment Rotation,South Saltwater Cooling Pump Discharge Valve Failed to Open Automatically.Caused by Installation of Solenoid Valve Operator W/Wrong Size Spring.Valve Replaced, 05000206/LER-1980-032, Forwards LER 80-032/03L-0, 05000206/LER-1980-032-03, /03L-0:on 800717,during Cold Shutdown Conditions, Isolation Valve for Svc Water to Containment Failed to Close Upon Demand.Caused by Small Amount of Desiccant Which Entered Solenoid During Removal of Air Dryer Desiccant, 05000206/LER-1981-018, Forwards LER 81-018/01T-0.Detailed Event Analysis Submitted, 05000206/LER-1981-018-01, /01T-0:on 810717,hydrogen-air Mixture Ignited in North Radwaste Gas Decay Tank Resulting in Manway Damage & Gaseous Release.Caused by check-valve Back Leakage of Volatile Gas Mix at Dinitrogen Instrument Air Interface, 05000206/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted, 05000206/LER-1982-007-03, /03L-0:on 820208,south Saltwater Cooling Pump (G13B) Declared Inoperable.Caused by Random Failure of Discharge Pressure switch,PS-39.Pressure Switch Replaced, ML13310A232, ML13310B052, ML13311A417, ML13317B073, ML13317B074, ML13322A850, ML13323A784, ML13323A889, ML13330A058, ML13330A076, ML13330B182, ML13330B400, ML13333A925, ML13333B765, ML13333B984, ML13333B987, ML20004F191, ML20079R245
|
MONTHYEARML13316B7251980-04-0404 April 1980 Discusses Licensee Actions Re 800310 Failure of Saltwater Cooling Sys.Auxiliary Salt Water Cooling Pump Will Not Be Considered in Determining Operability of Sys.Requests Review of All Emergency Procedures & Revision Prior to Operation Project stage: Approval ML13330A0581980-04-16016 April 1980 Notice of Violation from Insp on 800301-0404 Project stage: Other ML13323A7841980-05-13013 May 1980 Responds to NRC Re Violations Noted in IE Insp Rept 50-206/80-09.Corrective Actions:Emergency Operating Instruction S-3-5.34 Revised & Training for Operators Conducted Project stage: Other IR 05000206/19800151980-06-20020 June 1980 IE Insp Rept 50-206/80-15 on 800528-30.No Noncompliance Noted.Major Areas Inspected:Insp Activities Per IE Bulletin 79-13 Re Cracking in Feedwater Sys Piping Project stage: Request ML13330A0761980-06-20020 June 1980 Requests Addl Info Re Failure of Saltwater Cooling Sys on 800310.Info About Events Where Multiple Equipment Failures Occur & Contributing Factors Would Be Beneficial Project stage: Other ML13322A8501980-07-24024 July 1980 Submits Responses to Items 1,2 & 3 of NRC Re Failure of Saltwater Cooling Sys.Response to Item 4 Will Be Submitted by 800804 Project stage: Other ML13330A0771980-08-0808 August 1980 Responds to NRC 800620 Request for Info Re Failure of Salt Water Cooling Sys.Provides Analysis of Loss of Salt Water Cooling Sys Effect on Design Basis LOCA & Main Steam Line Break Inside Containment Project stage: Request 05000206/LER-1980-032, Forwards LER 80-032/03L-01980-08-18018 August 1980 Forwards LER 80-032/03L-0 Project stage: Other 05000206/LER-1980-032-03, /03L-0:on 800717,during Cold Shutdown Conditions, Isolation Valve for Svc Water to Containment Failed to Close Upon Demand.Caused by Small Amount of Desiccant Which Entered Solenoid During Removal of Air Dryer Desiccant1980-08-18018 August 1980 /03L-0:on 800717,during Cold Shutdown Conditions, Isolation Valve for Svc Water to Containment Failed to Close Upon Demand.Caused by Small Amount of Desiccant Which Entered Solenoid During Removal of Air Dryer Desiccant Project stage: Other 05000206/LER-1980-031-03, /03L-0:on 800728,during Routine Equipment Rotation,South Saltwater Cooling Pump Discharge Valve Failed to Open Automatically.Caused by Installation of Solenoid Valve Operator W/Wrong Size Spring.Valve Replaced1980-08-19019 August 1980 /03L-0:on 800728,during Routine Equipment Rotation,South Saltwater Cooling Pump Discharge Valve Failed to Open Automatically.Caused by Installation of Solenoid Valve Operator W/Wrong Size Spring.Valve Replaced Project stage: Other 05000206/LER-1980-031, Forwards LER 80-031/03L-01980-08-21021 August 1980 Forwards LER 80-031/03L-0 Project stage: Other ML13330A1201980-09-24024 September 1980 Ack Receipt of 800829 Request for Addl Info Re Failure of Salt Water Cooling Sys.Input from Several Engineers & Operating Entities Required to Complete Request.Response Will Be Submitted 801008 Project stage: Request ML13302A8381980-10-0808 October 1980 Notification of 801020 Meeting W/Util,Orange County,San Diego County & State of CA OES in El Segundo,Ca to Discuss Completion Dates & Review Matters for State & Local Emergency Plans for Facility & Vicinity Project stage: Request ML13330B0811980-10-28028 October 1980 Notification of 801030 Meeting W/Util in Bethesda,Md to Discuss Loss of Saltwater Cooling Event & Procedures in Place for Loss of Saltwater Cooling & Dessicate in Air Sys Project stage: Meeting ML13330B1031980-12-0808 December 1980 Notification of 801218 Meeting W/Util in Bethesda,Md to Discuss Util Comments Re NRC Case Study of Loss of Salt Water Cooling Sys Project stage: Meeting ML13323A8891980-12-26026 December 1980 Provides Justification for Util Corrective Actions Re Notice of Violation from 800310 Loss of Saltwater Cooling Incident. Proposed Hot Shutdown Time Limit Is Consistent W/Emergency Operating Instruction SO1-3-5.34 Project stage: Other ML13331A0361981-01-0606 January 1981 Summary of 801030 Meeting W/Util in Bethesda,Md Re Loss of Saltwater Cooling Event at Facility & Effects of Desiccant in Compressed Air Sys.W/List of Attendees Project stage: Meeting ML13330A1771981-01-12012 January 1981 Submits Comments on NRC Draft Rept on 800310 Loss of Saltwater Cooling.Forwards Addl Info Requested in 801223 Meeting & Interpretation of Tech Specs Re Saltwater Cooling Sys.Encls Available in Central Files Only ML13333A9251981-02-23023 February 1981 Provides Status Rept on Corrective Actions Taken to Ensure Continued Operability of safety-related air-using Equipment. Blowdown of Header Performed to Remove Dessicant.Preventive Maint Program Is Under Development Project stage: Other ML20004F1911981-06-0404 June 1981 Responds to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Periodic Insp & Daily Checks of Heat Exchangers Assure Proper Flow Project stage: Other 05000206/LER-1981-018-01, /01T-0:on 810717,hydrogen-air Mixture Ignited in North Radwaste Gas Decay Tank Resulting in Manway Damage & Gaseous Release.Caused by check-valve Back Leakage of Volatile Gas Mix at Dinitrogen Instrument Air Interface1981-07-31031 July 1981 /01T-0:on 810717,hydrogen-air Mixture Ignited in North Radwaste Gas Decay Tank Resulting in Manway Damage & Gaseous Release.Caused by check-valve Back Leakage of Volatile Gas Mix at Dinitrogen Instrument Air Interface Project stage: Other 05000206/LER-1981-018, Forwards LER 81-018/01T-0.Detailed Event Analysis Submitted1981-07-31031 July 1981 Forwards LER 81-018/01T-0.Detailed Event Analysis Submitted Project stage: Other ML13317A7181981-11-0202 November 1981 Forwards Draft Assessment for SEP Topic IX-3 Re Station Svc & Cooling Water Sys Project stage: Draft Other ML13310A2321982-02-28028 February 1982 Preliminary Rept, Loss of Salt Water Cooling Event on 800310 Project stage: Other ML13317B0741982-03-0404 March 1982 Forwards Preliminary Rept Re Loss of Salt Water Cooling Event of 800310 for Comment on Accuracy & Completeness of Technical Details Project stage: Other ML13317B0191982-03-0404 March 1982 Forwards Page 5,inadvertently Omitted from 820224 Submittal, Re Environ Qualification of Electrical Equipment Project stage: Request 05000206/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted1982-03-0505 March 1982 Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted Project stage: Other 05000206/LER-1982-007-03, /03L-0:on 820208,south Saltwater Cooling Pump (G13B) Declared Inoperable.Caused by Random Failure of Discharge Pressure switch,PS-39.Pressure Switch Replaced1982-03-0505 March 1982 /03L-0:on 820208,south Saltwater Cooling Pump (G13B) Declared Inoperable.Caused by Random Failure of Discharge Pressure switch,PS-39.Pressure Switch Replaced Project stage: Other ML13317B0731982-04-0707 April 1982 Forwards Comments on San Onofre Unit 1 Loss of Salt Water Cooling Event of 800310, Per 820403 Request Project stage: Other ML13333B7651982-08-12012 August 1982 Forwards Case Study Rept Containing Detailed Description, Findings,Conclusions & Recommendations Re 800310 Loss of Salt Water Cooling Event Project stage: Other ML20079R2451983-06-18018 June 1983 Comments on H Dieckamp 830527 & 0610 Ltrs Re Immediate Effectiveness of Restart.Dieckamp Concealment of Info Detrimental to Mgt Evidences Util Policy of Expediency. Certificate of Svc Encl Project stage: Other ML13310B0551983-10-28028 October 1983 Safety Evaluation Concluding That Proposed Change 98 Re Auxiliary Salt Water Cooling Pump Unacceptable.Deficiencies Identified.Alternatives Presented Project stage: Approval ML13310B0521983-10-28028 October 1983 Advises That 800827 Proposed Change 98 Re Auxiliary Salt Water Cooling Pump,Unacceptable.Revised Proposed Tech Spec Change Addressing Both Auxiliary Salt Water & Screen Wash Pumps as Backup Sources of Cooling Requested Project stage: Other ML13333B9871983-10-31031 October 1983 Degradation of Salt Water Cooling Sys Caused by Loss of Instrument Air, Technical Review Rept Project stage: Other ML13333B9841983-10-31031 October 1983 Forwards Degradation of Salt Water Cooling Sys Caused by Loss of Instrument Air, Technical Review Rept Project stage: Other ML13330B1821987-04-0101 April 1987 Forwards Erin Engineering & Research,Inc Rept, Reliability Assessment of San Onofre Unit 1 Saltwater Cooling Sys, Per NUREG-0829.Study Concludes That Sys as Designed Provides Very Reliable Means of Removing Decay Heat Project stage: Other ML13311A4171987-04-30030 April 1987 Reliability Assessment of San Onofre Unit 1 Saltwater Cooling Sys Project stage: Other ML13331B0021987-11-24024 November 1987 Forwards Request for Addl Info Re Plant Salt Water Cooling Sys Reliability Study Project stage: RAI ML13333A6031987-12-0202 December 1987 Forwards Safety Evaluation Accepting Util 871016 Single Failures Analysis for Esf,Per 871009 Meeting.Justification for Interim Plant Operation Acceptable Until 871214,pending Further Analysis Project stage: Approval ML13311A7291988-07-22022 July 1988 Forwards Responses to 871124 Request for Addl Info Re Salt Water Cooling Sys Reliability Study.Initiating Events Affecting Saltwater Cooling Sys or Vital Support Sys Can Affect Overall Sys Reliability Project stage: Request ML13330B4001988-10-0303 October 1988 Agrees W/Licensee That No Actions Required to Improve Reliability of Salt Water Cooling Sys Per SEP Topic IX-3, Item 4.32.7.If Complete Loss of Salt Water Cooling Occurs, Backup Pumps Can Provide Interim Cooling Project stage: Other 1981-11-02
[Table View] |
Text
E o
,UNITED STATES F REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-206 JUN 2 0 1990 Mr. R. Dietch Vice President Nuclear Engineering and Operations Southern California-Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770
Dear Mr. Dietch:
This letter is in regard to the failure of the San Onofre Unit No. 1 Salt Water Cooling System on March 10, 1980, as.described in your letter dated March 24, 1980. We are concerned about events such as this where multiple equipment failures occur and we need.additional information con cerning that event to determine what could have been contributing factors and whether remedial measures can be identified which would be of benefit to the industry and the regulatory process. We, therefore, ask that you provide the following information:
- 1. The south pump, G-13B, shaft failed due to apparent excessive vibration resulting from worn bearings.
A. Was the vibration noticed by the auxiliary operators in the course of shift tours? How often do they tour this area? Are vibration measurements made on these pumps?
B. When was the last time, previous to this event, that the bearings and shaft were inspected?
How often is this performed?
What were the manufacturer's maintenance recommendations in this regard?
C. Have you experienced any similar failures of pump bearings or shafts?
- 2. We understand that the failure of POV-5 to open at the discharge of the.
north pump was caused-by.a deteriorated 0-ring in the ASCO solenoid valve supplying air to the valve operator.
A. When was the last time, previous to this event, that the 0-ring was inspected or replaced? What was the manufacturer's recommendations in regard to 0-ring inspections or replacement?
8 oo007210
ir. R. Dietch
- 2
- 2. Continued:
B. Had you experienced any previous difficulty in the operation of this valve or other similar valves and if so what were the corrective measures needed?
C. How often is the non-operating pump placed in service?
D. How often is the automatic start of the pumps tested?
- 3. We understand that the loss of pumping capability of the auxiliary salt water cooling pump was caused by a leak in the suction line.which allowed air into the line so that the pump lost its prime.
A. When was the last time, previous to this event, that the auxiliary salt water pump was operated? How frequently is it operated?
B. Was the leak associated with a gasket or seal?
How often are gaskets or seals inspected and/or replaced?
- 4. Please provide an analysis of the-effect of the loss of the Salt Water Cooling System during the design basis loss of coolant accident or the main steam line break inside containment,.whichever is more limiting with regard to heat load on the Component Cooling System and necessary operator actions.
No additional failures need be assumed.
Your analysis should determine the following:
A. The time that it takes for the Component Cooling Water System to reach its design temperature limit with the heatload it will experience during the injection phase and recirculation phase, both with and without containment spray; B.
The time and manpower that it would take to align back-up salt water cooling capability with and without off-site power available; C. *The time and manpower that is used for other manual actions required during this accident, such as shifting from injection to recircula tion and any other operator actions required by your emergency pro cedures; and D. The heat removal capability of the backup salt water cooling provided and a comparison with the component cooling water heat load at the time.
Mr.
JN UMNE 20-1980 Please provide the above information within 30 days of your receipt of this letter.
Sincerely, Original signed by Gus C. Lainas, Assistant Director for Safety Assessment Division of Licensing cc:
cc:
DISTRIBUTION:
See next page DokT
.Docket NRC PDR Local PDR TERA NSIC NRR Reading ORB #5 Reading DEisenhut, JOishinski GLainas TNovak RTedesco RPurple JHeltemes OELD OI&E (3)
DCrutchfield HSmith TWambach Gray File Xtra cy (6)
ACRS (16)
DATE'>
J.:
I//80 g80 NRC PORM 318 (9-76) NRCH 0240 OevERNMEN u
PRINTINS OF E
- an -69 r
Mr. R. Dietch 3
Please provide the above information within 30 days of your receipt of this letter.
Sincerely, Gus C. Lainas, Assistant Director for Safety Assessment Division of Licensing cc:
See next page
Mr. R. Dietch
-4 OWE 2 0 N0 CC:
Charles R. Kocher, Assistant Director, Technical Assessment General Counsel Division Southern California Edison Company Office of Radiation Programs Post Office Box 800 (AW-459)
Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Crystal Mall 12 SSamuel B. Casey Arlington, Virginia 20460 Chickering & Gregory Three Embarcadero Center U. S. Environmental Protection Twenty-Third Floor Agency San Francisco, California 94111 Region IX Office ATTN: EIS COORDINATOR Jack E. Thomas 215 Freemont Street Harry B. Stoehr San Francisco, California 94111 San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector C/o U. S. NRC P. 0. Box AA
-Oceanside, California 92054 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814