MONTHYEARML17341B6521981-11-30030 November 1981 Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples Project stage: Other ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples Project stage: Other ML13317B0881982-04-15015 April 1982 Informs That Chloride Monitoring Capability Will Be Installed Per NUREG-0737,Item II.B.3,in Response to NRC Rejecting Util Decision to Eliminate Chloride Monitoring.Addl Design Info Will Be Submitted by 820801 Project stage: Other ML13317A2671982-08-12012 August 1982 Advises That Response to NUREG-0737,Action Item II.B.3, Post-Accident Sampling, Will Be Provided by 821101 Project stage: Other ML13317A4541982-12-0303 December 1982 Submits Info for post-implementation Review of NUREG-0737, Item II.B.3, Post-Accident Sampling Sys. W/Six Oversize Drawings.Aperture Cards Are Available in PDR Project stage: Other ML13310B1261983-05-0202 May 1983 Rev 4 to Emergency Operations Facility & Checklist/Log Technical Group Project stage: Other ML13310B1231983-12-27027 December 1983 Forwards Info Re NUREG-0737,Item II.B.3, Post-Accident Sampling Capability, in Response to NRC 830901 Request Project stage: Other ML13310B3881984-05-0101 May 1984 Reschedules Completion of post-accident Sampling Sys to Next Refueling Outage,Contrary to 840314 Confirmatory Order Requiring Implementation During Current Refueling Outage. Approval of Delay Requested Project stage: Other ML13310B5361984-05-21021 May 1984 Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling Project stage: Other ML13310B5341984-06-28028 June 1984 Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage Project stage: Other ML13310B6311984-08-14014 August 1984 Forwards Addl Info Re Current Alternate post-accident Sampling Sys Methods,Completion Schedules for Procurement of Components,Const & Operator Training & Justification for Deferral to Cycle IX Refueling Outage Project stage: Other ML13310B7011984-09-20020 September 1984 Application for Amend 124 to License DPR-13,consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Certificate of Svc Encl Project stage: Request ML13310B6951984-09-20020 September 1984 Forwards Application for Amend 124 to License DPR-13, Consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Fee Paid Project stage: Request ML13322A0561984-10-0909 October 1984 Notification of 841009 Meeting W/Util in Bethesda,Md to Discuss Reload Submittal Project stage: Request ML13316A7721984-11-23023 November 1984 Forwards Amend 85 to License DPR-13 & Safety Evaluation. Amend Adds License Condition 3.K Requiring Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Approval ML13316A7741984-11-23023 November 1984 Amend 85 to License DPR-13 Adding License Condition 3.K to Require Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Other ML13316A7781984-11-23023 November 1984 Safety Evaluation Supporting Amend 85 to License DPR-13 Project stage: Approval ML13324A6521985-06-18018 June 1985 Forwards Revised Schedule for post-accident Sampling Sys Completion,Per NUREG-0737,TMI Item II.B.3.Turnover to Station Personnel Will Be Completed Prior to Cycle IX Refueling Outage Project stage: Other ML13324A6751985-07-17017 July 1985 Responds to NRC Request for Addl Info to Resolve Open Items Identified in Util 821203 Submittal in Response to NUREG-0737,Item II.B.3 Re post-accident Sampling Sys.Rev 8 to Procedure for Core Damage Assessment Encl Project stage: Request ML13324A7021985-08-22022 August 1985 Informs of Planned Installation of post-accident Sampling Sys (PASS) by 860701 Per License Condition 3.K (NUREG-0737,Item II.B.3).On 850812,PASS Equipment Room Flooded W/Primary Plant Makeup Water Project stage: Other ML13324A8671986-05-23023 May 1986 Requests Review of NRC Safety Evaluation,Transmitted by Ja Zwolinski ,Re Frequency of Chemistry Technician Retraining on post-accident Sampling Sys.Safety Evaluation Should Ref 12-month Frequency,Consistent w/831227 Request Project stage: Other ML13323B1951986-10-0303 October 1986 Notice of Violation from Insp on 860728-0917 Project stage: Other ML13330B1341986-11-12012 November 1986 Approves Replacement of 6-month Retraining Frequency for post-accident Sampling Sys Technicians,Previously Approved by NRC 851107 ltr,w/1-yr Retraining Frequency Project stage: Other 1984-05-01
[Table View] |
Text
o UNITED STATES NLEAR REGULATORY COMM NU L ISSION WASHINGTON, D. C. 20555 C,
SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENPMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 85 License No. DPR-13
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern California Edison Company.
and San Dieco Gas and Electric Company (the licensees) dated September 20, 1984 and supported by SCE letter dated August 14, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; P. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can he conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defPnse and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's reoulations and all applicable requirements have been satisfied.
2704f4 84112'3i PDR ADOCK 05000206
-PDR
-2
- 2. Accordingly, Provisional Operating License No. DPR-13 is hereby amended by adding Paragraph 3.K to read as follows:
K. Post Accident Sampling System (PASS), NUREG-0737, Item II.B.3 (1) By July 1, 1986 or startup from the Cycle IX refueling outage, whichever is earlier, SCE shall install a PASS and implement a post-accident sampling program at San Onofre Unit 1.
(2) Prior to the date in (1) above or until the PASS is operable, SCE shall maintain in effect those compensatory measures described in the SCE letter dated August 14, 1984.
- 3. This license amendment is effective as of the date of its issuance.
FOR N LEAR REGULAT Y C IMISSION John A. Zwolinski, Chief Opera ing Reactors Branch #5 Division of Licensing Date of Issuance: November 23, 1984