MONTHYEARML17341B6521981-11-30030 November 1981 Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples Project stage: Other ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples Project stage: Other ML13317B0881982-04-15015 April 1982 Informs That Chloride Monitoring Capability Will Be Installed Per NUREG-0737,Item II.B.3,in Response to NRC Rejecting Util Decision to Eliminate Chloride Monitoring.Addl Design Info Will Be Submitted by 820801 Project stage: Other ML13317A2671982-08-12012 August 1982 Advises That Response to NUREG-0737,Action Item II.B.3, Post-Accident Sampling, Will Be Provided by 821101 Project stage: Other ML13317A4541982-12-0303 December 1982 Submits Info for post-implementation Review of NUREG-0737, Item II.B.3, Post-Accident Sampling Sys. W/Six Oversize Drawings.Aperture Cards Are Available in PDR Project stage: Other ML13310B1261983-05-0202 May 1983 Rev 4 to Emergency Operations Facility & Checklist/Log Technical Group Project stage: Other ML13310B1231983-12-27027 December 1983 Forwards Info Re NUREG-0737,Item II.B.3, Post-Accident Sampling Capability, in Response to NRC 830901 Request Project stage: Other ML13310B3881984-05-0101 May 1984 Reschedules Completion of post-accident Sampling Sys to Next Refueling Outage,Contrary to 840314 Confirmatory Order Requiring Implementation During Current Refueling Outage. Approval of Delay Requested Project stage: Other ML13310B5361984-05-21021 May 1984 Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling Project stage: Other ML13310B5341984-06-28028 June 1984 Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage Project stage: Other ML13310B6311984-08-14014 August 1984 Forwards Addl Info Re Current Alternate post-accident Sampling Sys Methods,Completion Schedules for Procurement of Components,Const & Operator Training & Justification for Deferral to Cycle IX Refueling Outage Project stage: Other ML13310B7011984-09-20020 September 1984 Application for Amend 124 to License DPR-13,consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Certificate of Svc Encl Project stage: Request ML13310B6951984-09-20020 September 1984 Forwards Application for Amend 124 to License DPR-13, Consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Fee Paid Project stage: Request ML13322A0561984-10-0909 October 1984 Notification of 841009 Meeting W/Util in Bethesda,Md to Discuss Reload Submittal Project stage: Request ML13316A7721984-11-23023 November 1984 Forwards Amend 85 to License DPR-13 & Safety Evaluation. Amend Adds License Condition 3.K Requiring Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Approval ML13316A7741984-11-23023 November 1984 Amend 85 to License DPR-13 Adding License Condition 3.K to Require Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Other ML13316A7781984-11-23023 November 1984 Safety Evaluation Supporting Amend 85 to License DPR-13 Project stage: Approval ML13324A6521985-06-18018 June 1985 Forwards Revised Schedule for post-accident Sampling Sys Completion,Per NUREG-0737,TMI Item II.B.3.Turnover to Station Personnel Will Be Completed Prior to Cycle IX Refueling Outage Project stage: Other ML13324A6751985-07-17017 July 1985 Responds to NRC Request for Addl Info to Resolve Open Items Identified in Util 821203 Submittal in Response to NUREG-0737,Item II.B.3 Re post-accident Sampling Sys.Rev 8 to Procedure for Core Damage Assessment Encl Project stage: Request ML13324A7021985-08-22022 August 1985 Informs of Planned Installation of post-accident Sampling Sys (PASS) by 860701 Per License Condition 3.K (NUREG-0737,Item II.B.3).On 850812,PASS Equipment Room Flooded W/Primary Plant Makeup Water Project stage: Other ML13324A8671986-05-23023 May 1986 Requests Review of NRC Safety Evaluation,Transmitted by Ja Zwolinski ,Re Frequency of Chemistry Technician Retraining on post-accident Sampling Sys.Safety Evaluation Should Ref 12-month Frequency,Consistent w/831227 Request Project stage: Other ML13323B1951986-10-0303 October 1986 Notice of Violation from Insp on 860728-0917 Project stage: Other ML13330B1341986-11-12012 November 1986 Approves Replacement of 6-month Retraining Frequency for post-accident Sampling Sys Technicians,Previously Approved by NRC 851107 ltr,w/1-yr Retraining Frequency Project stage: Other 1984-05-01
[Table View] |
Text
- RREGjj UNITED STATES N IILEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 November 23, 1984 Docket No. 50-206 LS05-84-11-024 Mr. Kenneth P. Baskin, Vice President Nuclear Engineering Safety and Licensing Department Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770
Dear Mr. Baskin:
SUBJECT:
LICENSE CONDITION - POST-ACCIDENT SAMPLING SYSTEM Re:
San Onofre Nuclear Generating Station, Unit No. 1 The Commission has issued the enclosed Amendment No.85.to Provisional Operating License No. DPR-13 for San Onofre Nuclear Generating Station, Unit No. 1. This amendment consists of an addition of license condition 3.K in response to your application dated September 20, 1984 and supported by your Aunust 14, 1984 letter.
The license condition requires: (1) that by July 1, 1986 or startup from the Cycle IX refueling outage, whichever is earlier, a post-accident sampling system (PASS) be installed at San Onofre 1; and (2) that until then, the compensatory measures described in the August 14, 1984 letter are maintained.
The license condition provides a new implementation date for the PASS replacing the date which was established by the March 14, 1983 Order Confirminq Commitments on.Post-TMI Related Issues.
A Notice of Consideration of Tssuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested action was published in the Federal Register on October 22, 1984 (49 FR 41300).
No request for hearing or comments were received.
6411270406 841123 PDR ADOCK 05000206 P
PDR 5I A
Mr. Kenneth November 23, 1984 A copy of our related Safety Evaluation is also enclosed. This action will appear in the Commission's monthly notice publication in the Federal Register.
Sincerely, Original signed by John A. Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing
Enclosures:
- 1. Amendment No. 85 to License No. DPR-13
- 2. Safety Evaluation cc w/enclosures:
See next page DISTRIBUTION Docket JNGrace NRC PDR ACRS (10)
Local PDR SEPB ORB Reading RDiggs (w/fee form)
NSIC TBarnhart (4)
WPaulson LJHarmon CJamerson DBrinkman PM WJones OELD CMiles, OPA ELJordan PWu DL:ORB#5 DLO 05 CHEF't OELD.
DL: RB#5 D
/A CJamerson b EMcKenna Shandler JZwolinski D
chfield 11
/84 11/6/84
/7/84 1 /3/84 '
/jt5/84 84
Mr. Kenneth November 23, 1984 cc Charles R. Kocher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montogmery Street San Francisco, California 94111 Dr. Lou Bernath San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Ciemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 Director Energy Facilities Siting Division Energy Resources Conservation &
Development Commission 1516 - 9th Street Sacramento, CA 95814 U.S. Environmental Protection Agency Region IX Office ATTN:
Regional Radiation Representative 215 Freemont Street San Francisco, California 94105 John B. Martin, Regional Administrator Nuclear Regulatory Commission, Region V 1450 1aria Lane Walnut Creek, California 94596