Letter Sequence Other |
|---|
|
Results
Other: ML13310B123, ML13310B126, ML13310B388, ML13310B534, ML13310B536, ML13310B631, ML13316A774, ML13317A267, ML13317A454, ML13317B088, ML13323B195, ML13324A652, ML13324A702, ML13324A867, ML13330B134, ML17341B652, ML17341B657
|
MONTHYEARML17341B6521981-11-30030 November 1981 Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples Project stage: Other ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples Project stage: Other ML13317B0881982-04-15015 April 1982 Informs That Chloride Monitoring Capability Will Be Installed Per NUREG-0737,Item II.B.3,in Response to NRC Rejecting Util Decision to Eliminate Chloride Monitoring.Addl Design Info Will Be Submitted by 820801 Project stage: Other ML13317A2671982-08-12012 August 1982 Advises That Response to NUREG-0737,Action Item II.B.3, Post-Accident Sampling, Will Be Provided by 821101 Project stage: Other ML13317A4541982-12-0303 December 1982 Submits Info for post-implementation Review of NUREG-0737, Item II.B.3, Post-Accident Sampling Sys. W/Six Oversize Drawings.Aperture Cards Are Available in PDR Project stage: Other ML13310B1261983-05-0202 May 1983 Rev 4 to Emergency Operations Facility & Checklist/Log Technical Group Project stage: Other ML13310B1231983-12-27027 December 1983 Forwards Info Re NUREG-0737,Item II.B.3, Post-Accident Sampling Capability, in Response to NRC 830901 Request Project stage: Other ML13310B3881984-05-0101 May 1984 Reschedules Completion of post-accident Sampling Sys to Next Refueling Outage,Contrary to 840314 Confirmatory Order Requiring Implementation During Current Refueling Outage. Approval of Delay Requested Project stage: Other ML13310B5361984-05-21021 May 1984 Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling Project stage: Other ML13310B5341984-06-28028 June 1984 Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage Project stage: Other ML13310B6311984-08-14014 August 1984 Forwards Addl Info Re Current Alternate post-accident Sampling Sys Methods,Completion Schedules for Procurement of Components,Const & Operator Training & Justification for Deferral to Cycle IX Refueling Outage Project stage: Other ML13310B7011984-09-20020 September 1984 Application for Amend 124 to License DPR-13,consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Certificate of Svc Encl Project stage: Request ML13310B6951984-09-20020 September 1984 Forwards Application for Amend 124 to License DPR-13, Consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Fee Paid Project stage: Request ML13322A0561984-10-0909 October 1984 Notification of 841009 Meeting W/Util in Bethesda,Md to Discuss Reload Submittal Project stage: Request ML13316A7721984-11-23023 November 1984 Forwards Amend 85 to License DPR-13 & Safety Evaluation. Amend Adds License Condition 3.K Requiring Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Approval ML13316A7741984-11-23023 November 1984 Amend 85 to License DPR-13 Adding License Condition 3.K to Require Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Other ML13316A7781984-11-23023 November 1984 Safety Evaluation Supporting Amend 85 to License DPR-13 Project stage: Approval ML13324A6521985-06-18018 June 1985 Forwards Revised Schedule for post-accident Sampling Sys Completion,Per NUREG-0737,TMI Item II.B.3.Turnover to Station Personnel Will Be Completed Prior to Cycle IX Refueling Outage Project stage: Other ML13324A6751985-07-17017 July 1985 Responds to NRC Request for Addl Info to Resolve Open Items Identified in Util 821203 Submittal in Response to NUREG-0737,Item II.B.3 Re post-accident Sampling Sys.Rev 8 to Procedure for Core Damage Assessment Encl Project stage: Request ML13324A7021985-08-22022 August 1985 Informs of Planned Installation of post-accident Sampling Sys (PASS) by 860701 Per License Condition 3.K (NUREG-0737,Item II.B.3).On 850812,PASS Equipment Room Flooded W/Primary Plant Makeup Water Project stage: Other ML13324A8671986-05-23023 May 1986 Requests Review of NRC Safety Evaluation,Transmitted by Ja Zwolinski ,Re Frequency of Chemistry Technician Retraining on post-accident Sampling Sys.Safety Evaluation Should Ref 12-month Frequency,Consistent w/831227 Request Project stage: Other ML13323B1951986-10-0303 October 1986 Notice of Violation from Insp on 860728-0917 Project stage: Other ML13330B1341986-11-12012 November 1986 Approves Replacement of 6-month Retraining Frequency for post-accident Sampling Sys Technicians,Previously Approved by NRC 851107 ltr,w/1-yr Retraining Frequency Project stage: Other 1984-05-01
[Table View] |
Text
APENIX A NOTICE OF VIOLAtION Southern California Edison Compaiy Docket No.
50 362 2244 Walnut Grove Avenue icense No NPF-15 Roseiead
-Ca liforna 91770 As a resuIt of the inspection conducted July 28 through Atggs 1, August 11 through August 15, and September 16 and 17, 1986 and i accordance with the NRC Enf rcement Policy 10 CFR 2 ppendx C the following violationwas identified:
Technical Specification6'.8.1 specifies that written procedures shall be established, implemented and naintained Procidure 0 123-VII-9.9, Revision3, Radiatin Exposure PrmitProgran, specifies in Section 6.3.3 that '11 personnel coveed by the REP-must foll6w the requirements specifiedin the REP.','- Radiation Exposure Permit 83001 required use of a respirator while workng-on valv S -312 08MR15.
Contrary to theabove requirement, an individual performed work on valve S:31208MR135 under REP 83001 on Jahuary 3 1985 arid did not wear a' respirator a required by the, Radiatior Exposure Permit.
This is aSeverity Leel IV Violaton (Supplemnt IV.
usuant to 10 CFR 2.20,1 you e required to submit to this office-'within thirty daysof 'the date of this Notice,' a written statement or explanation in reply; including:
1 the corrective steps which, 6ave^beer taken and-the results, achieved; c'(2')
co ArectiVe.
steps whtc1 iil be taken to avoid further
'vi61atius;and;(3the date when.ful compl ance will-be achieved OCT:031986' Date oss A. Scarano.Director Division of Radiation' Safety and Sa feg lai s
61003 PDR ADOCK 0,5000206, 6i('0PDR