MONTHYEARML17341B6521981-11-30030 November 1981 Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples Project stage: Other ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples Project stage: Other ML13317B0881982-04-15015 April 1982 Informs That Chloride Monitoring Capability Will Be Installed Per NUREG-0737,Item II.B.3,in Response to NRC Rejecting Util Decision to Eliminate Chloride Monitoring.Addl Design Info Will Be Submitted by 820801 Project stage: Other ML13317A2671982-08-12012 August 1982 Advises That Response to NUREG-0737,Action Item II.B.3, Post-Accident Sampling, Will Be Provided by 821101 Project stage: Other ML13317A4541982-12-0303 December 1982 Submits Info for post-implementation Review of NUREG-0737, Item II.B.3, Post-Accident Sampling Sys. W/Six Oversize Drawings.Aperture Cards Are Available in PDR Project stage: Other ML13310B1261983-05-0202 May 1983 Rev 4 to Emergency Operations Facility & Checklist/Log Technical Group Project stage: Other ML13310B1231983-12-27027 December 1983 Forwards Info Re NUREG-0737,Item II.B.3, Post-Accident Sampling Capability, in Response to NRC 830901 Request Project stage: Other ML13310B3881984-05-0101 May 1984 Reschedules Completion of post-accident Sampling Sys to Next Refueling Outage,Contrary to 840314 Confirmatory Order Requiring Implementation During Current Refueling Outage. Approval of Delay Requested Project stage: Other ML13310B5361984-05-21021 May 1984 Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling Project stage: Other ML13310B5341984-06-28028 June 1984 Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage Project stage: Other ML13310B6311984-08-14014 August 1984 Forwards Addl Info Re Current Alternate post-accident Sampling Sys Methods,Completion Schedules for Procurement of Components,Const & Operator Training & Justification for Deferral to Cycle IX Refueling Outage Project stage: Other ML13310B7011984-09-20020 September 1984 Application for Amend 124 to License DPR-13,consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Certificate of Svc Encl Project stage: Request ML13310B6951984-09-20020 September 1984 Forwards Application for Amend 124 to License DPR-13, Consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Fee Paid Project stage: Request ML13322A0561984-10-0909 October 1984 Notification of 841009 Meeting W/Util in Bethesda,Md to Discuss Reload Submittal Project stage: Request ML13316A7721984-11-23023 November 1984 Forwards Amend 85 to License DPR-13 & Safety Evaluation. Amend Adds License Condition 3.K Requiring Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Approval ML13316A7741984-11-23023 November 1984 Amend 85 to License DPR-13 Adding License Condition 3.K to Require Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage Project stage: Other ML13316A7781984-11-23023 November 1984 Safety Evaluation Supporting Amend 85 to License DPR-13 Project stage: Approval ML13324A6521985-06-18018 June 1985 Forwards Revised Schedule for post-accident Sampling Sys Completion,Per NUREG-0737,TMI Item II.B.3.Turnover to Station Personnel Will Be Completed Prior to Cycle IX Refueling Outage Project stage: Other ML13324A6751985-07-17017 July 1985 Responds to NRC Request for Addl Info to Resolve Open Items Identified in Util 821203 Submittal in Response to NUREG-0737,Item II.B.3 Re post-accident Sampling Sys.Rev 8 to Procedure for Core Damage Assessment Encl Project stage: Request ML13324A7021985-08-22022 August 1985 Informs of Planned Installation of post-accident Sampling Sys (PASS) by 860701 Per License Condition 3.K (NUREG-0737,Item II.B.3).On 850812,PASS Equipment Room Flooded W/Primary Plant Makeup Water Project stage: Other ML13324A8671986-05-23023 May 1986 Requests Review of NRC Safety Evaluation,Transmitted by Ja Zwolinski ,Re Frequency of Chemistry Technician Retraining on post-accident Sampling Sys.Safety Evaluation Should Ref 12-month Frequency,Consistent w/831227 Request Project stage: Other ML13323B1951986-10-0303 October 1986 Notice of Violation from Insp on 860728-0917 Project stage: Other ML13330B1341986-11-12012 November 1986 Approves Replacement of 6-month Retraining Frequency for post-accident Sampling Sys Technicians,Previously Approved by NRC 851107 ltr,w/1-yr Retraining Frequency Project stage: Other 1984-05-01
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING June 28, 1984 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: 0. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Alternate Post-Accident Sampling San Onofre Nuclear Generating Station Unit 1 By letter dated May 1,.1984, we provided you with information regarding the current status of our modifications to comply with NUREG-0737, Item II.B.3 - Post-Accident Sampling Capability. We stated that due to the time necessary to complete installation of the post-accident sampling system (PASS) at San Onofre Unit 1, we would need to reschedule the required due date to the next refueling outage. In the interim we will rely on currently available, alternate methods to provide the post-accident assessment capability that the PASS is intended to provide.
In subsequent discussions, members of the NRC staff requested more detailed information regarding the alternate post-accident sampling methods.
In response to this request, San Onofre Nuclear Generating Station, Chemistry Procedure S0123-III-8.8, "Alternate Methods of Post-Accident Parameter Sampling", dated May 21, 1984, is enclosed. Attachments 8.1, 8.2 and 8.3 pertain to the methods utilized at San Onofre Unit 1.
If you have any questions regarding the enclosed information, please let me know.
Very truly yours, 8407020313 840628 PDR ADOCK 05000206 P
-PDR cc:
E. McKenna, Project Manager A. E. Chaffee,.NRC Resident Inspector