Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage
ML13310B534
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/28/1984
From: Medford M
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML13310B535 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TAC-44478, TASK-2.B.3, TASK-TM NUDOCS 8407020313
Download: ML13310B534 (1)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING June 28, 1984 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: 0. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Alternate Post-Accident Sampling San Onofre Nuclear Generating Station Unit 1 By letter dated May 1,.1984, we provided you with information regarding the current status of our modifications to comply with NUREG-0737, Item II.B.3 - Post-Accident Sampling Capability. We stated that due to the time necessary to complete installation of the post-accident sampling system (PASS) at San Onofre Unit 1, we would need to reschedule the required due date to the next refueling outage. In the interim we will rely on currently available, alternate methods to provide the post-accident assessment capability that the PASS is intended to provide.

In subsequent discussions, members of the NRC staff requested more detailed information regarding the alternate post-accident sampling methods.

In response to this request, San Onofre Nuclear Generating Station, Chemistry Procedure S0123-III-8.8, "Alternate Methods of Post-Accident Parameter Sampling", dated May 21, 1984, is enclosed. Attachments 8.1, 8.2 and 8.3 pertain to the methods utilized at San Onofre Unit 1.

If you have any questions regarding the enclosed information, please let me know.

Very truly yours, 8407020313 840628 PDR ADOCK 05000206 P

-PDR cc:

E. McKenna, Project Manager A. E. Chaffee,.NRC Resident Inspector