IR 05000261/2013007

From kanterella
(Redirected from ML13182A032)
Jump to navigation Jump to search
IR 05000261-13-007, on 04/08-12, 04/22-26, 05/13-17/2013, Notification of H. B. Robinson Steam Electric Plant - Component Design Bases
ML12326A782
Person / Time
Site: Robinson 
Issue date: 11/21/2012
From: Nease R
NRC/RGN-II/DRS/EB1
To: William Gideon
Progress Energy Carolinas
References
IR-13-007
Download: ML12326A782 (9)


Text

November 21, 2012

SUBJECT:

NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000261/2013007

Dear Mr. Gideon:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your H.B. Robinson Steam Electric Plant Unit 2 during the weeks of April 08 - 12, April 22 - 26, and May 13 - 17, 2013. The inspection team will be led by Jason Eargle, a Senior Reactor Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued August 14, 2012.

The inspection will evaluate the capability of risk significant/low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.

During a telephone conversation on November 19, 2012, Mr. Eargle confirmed with Michael Pastva of your staff, arrangements for an information-gathering site visit and the three-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of March 18 - 22, 2013

Onsite weeks: April 08 - 12, April 22 - 26, and May 13 - 17, 2013

The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. George MacDonald, a Region II Senior Reactor Analyst, will support Mr. Eargle during the information-gathering visit to review probabilistic risk assessment data and identify risk significant components, which will be examined during the inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by February 18, 2013. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

Additional documents will be requested during the information-gathering visit. The additional information will need to be made available to the team in the Region II office prior to the inspection teams preparation week of April 1. Mr. Eargle, will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) licensee computer access, (4) working space, (5)

arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Eargle at 404-997-4632 or me at 404-997-4530.

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-261 License No.: DPR-23

Enclosure:

Information Request for H.B. Robinson Steam Electric Plant - Component Design Bases Inspection

cc: (See page 3)

_________________________

xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS

SIGNATURE

NAME EARGLE NEASE

DATE 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532

Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution

Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution

M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution

Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant Electronic Mail Distribution

Richard Keith Holbrook Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution

Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution

Sharon Wheeler Manager, Support Services H B Robinson Steam Electric Plant Electronic Mail Distribution

Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution

Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution

David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128

Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution

Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)

Progress Energy Electronic Mail Distribution

(cc contd - See page 4) (cc contd)

Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326

W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

Mark Yeager Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211

Chairman North Carolina Utilities Commission Electronic Mail Distribution

Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550

Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution

Letter to William from Rebecca L. Nease dated November 21, 2012.

SUBJECT:

NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000261/2013007

Distribution:

RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource

Enclosure INFORMATION REQUEST FOR CATAWBA NUCLEAR STATION COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in.pdf files, Excel, or other searchable format on CDROM. (or FTP site, Sharepoint, etc.) The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.

1.

From your most-recent probabilistic safety analysis (PSA) excluding external events and fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

2.

From your most-recent probabilistic safety analysis (PSA) including external events and fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3.

Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide human reliability worksheets for these items.

4.

List of time critical operator actions with a brief description of each action.

5.

List of Emergency and Abnormal Operating Procedures revised (significant) since October 1, 2010, with a brief description of each revision.

6.

List of components with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and MOV risk-margin rankings, etc.), and associated evaluations or calculations.

7. List of station operating experience evaluations/reviews performed, and documented in the stations corrective action program, for industry events and safety related equipment failures/vulnerabilities [as communicated by NRC Generic Communications, Industry Communications, 10 CFR Part 21 Notifications, etc.] since October 1, 2010.

8.

List and brief description of safety related SSC design modifications implemented since October 1, 2010.

9.

List and brief description of common-cause component failures that have occurred since October 1, 2010.

10. List and brief description of operability evaluations completed since October 1, 2010.

Enclosure 11. List of equipment on the sites Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s).

12. List and brief description of equipment currently in degraded or nonconforming status as described in RIS 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status since

October 1, 2010, to present.

14. Copies of System Descriptions (or the like design basis documents) for Safety-Related Systems.

15. Copy of UFSAR(s).

16. Copy of Technical Specification(s).

17. Copy of Technical Specifications Bases.

18. Copy of Technical Requirements Manual(s).

19. List and brief description of Root Cause Evaluations that have been performed since October 1, 2010.

20. In-service Testing Program Procedure(s).

21. Corrective Action Program Procedure(s).

22. One line diagram of electrical plant. (Electronic and full size - hard copy week of March 18)

23. Index and legend for electrical plant one-line diagrams.

24. Primary AC calculation(s) for safety-related buses.

25. Primary DC calculation(s) for safety-related buses.

26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of March 18)

27. Index and Legend for PI&Ds.

28. Copy of Operability determination procedure(s).

30. Copies of condition reports associated with findings from previous CDBI.

31. Index (procedure number, titles, and current revision) of station Emergency Operating Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response Procedures (ARPs).

32. Copy of any self-assessments performed in preparation for this inspection.

Enclosure 33. List of any condition reports generated in preparation for this inspection.