ML13056A609
ML13056A609 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 01/29/2013 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | |
References | |
Download: ML13056A609 (4) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Monticello Date of Exam: 01/28/13 Operating Test Number: MNGP 2013301 A E Scenarios for Crew 1 P V 1 2 3 4 (SPARE)
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 1 1 Crew 1 NOR 2 1 2 1 RO 1 I/C 24 356 34 7 4 MAJ 7 7 6 3 2 TS 0 0 RX 4 1 1 Crew 1 NOR 1 1 1 RO 2 I/C 34 257 5 4 MAJ 7 6 2 2 TS 0 0 RX 1 4 2 1 NOR 1 1 1 Crew 1 SRO-I 1 234 I/C 48 7 4 57 MAJ 7 8 2 2 TS 45 2 2 RX 2 1 2 0 NOR 1 2 2 1 Crew 1 23 345 SRO-U I/C 9 2 45 68 MAJ 7 7 2 1 TS 12 45 4 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Monticello Date of Exam: 01/28/13 Operating Test Number: MNGP 2013301 A E Scenarios for Crew 2 P V 1 2 3 4 (SPARE)
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 4 1 1 Crew 2 NOR 1 2 2 1 RO 3 I/C 34 356 257 8 4 MAJ 7 7 6 3 2 TS 0 0 RX 2 1 2 1 NOR 2 1 2 1 Crew 2 SRO-I 2 345 I/C 24 34 9 4 68 MAJ 7 7 6 3 2 TS 45 2 2 RX 2 1 4 3 1 NOR 1 1 2 1 Crew 2 SRO-I 3 23 234 I/C 48 11 4 45 57 MAJ 7 7 8 3 2 TS 12 45 4 2 Instructions:
- 4. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 5. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 6. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Monticello Date of Exam: 01/28/13 Operating Test Number: MNGP 2013301 A E Scenarios for Crew 3 P V 1 2 3 4 (SPARE)
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 4 1 1 Crew 3 NOR 1 2 2 1 RO 4 I/C 34 356 257 8 4 MAJ 7 7 6 3 2 TS 0 0 RX 2 1 2 1 NOR 2 1 2 1 Crew 3 SRO-I 4 345 I/C 24 34 9 4 68 MAJ 7 7 6 3 2 TS 45 2 2 RX 2 1 4 3 1 NOR 1 1 2 1 Crew 3 SRO-I 5 23 234 I/C 48 11 4 45 57 MAJ 7 7 8 3 2 TS 12 45 4 2 Instructions:
- 7. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 8. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 9. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Monticello Date of Exam: 01/28/13 Operating Test Number: MNGP 2013301 A E Spare Scenario P V 1 2 3 4 (SPARE)
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 0 RO NOR 1 1 1 1 SRO-I I/C 347 4 4 2 SRO-U MAJ 6 2 2 1 TS 0 2 2 RX 4 1 1 0 RO NOR 1 1 1 SRO-I I/C 25 4 4 2 SRO-U MAJ 6 2 2 1 TS 0 2 2 RX 4 1 1 0 RO NOR 1 1 1 1 SRO-I 234 4 4 2 I/C 57 SRO-U MAJ 6 2 2 1 TS 23 0 2 2 Instructions:
- 10. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 11. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 12. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.