Category:NRC Information Notice
MONTHYEARInformation Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2004-15, Dual-Unit Scram At Peach Bottom Units 2 and 32004-07-22022 July 2004 Dual-Unit Scram At Peach Bottom Units 2 and 3 Information Notice 2004-15, Dual-Unit Scram at Peach Bottom Units 2 and 32004-07-22022 July 2004 Dual-Unit Scram at Peach Bottom Units 2 and 3 Information Notice 1999-28, Recall of Star Brand Fire Protection Sprinkler Heads1999-09-30030 September 1999 Recall of Star Brand Fire Protection Sprinkler Heads Information Notice 1999-27, Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units1999-09-0202 September 1999 Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units Information Notice 1999-26, Safety and Economic Consequences of Misleading Marketing Information1999-08-24024 August 1999 Safety and Economic Consequences of Misleading Marketing Information Information Notice 1999-25, Year 2000 Contingency Planning Activities1999-08-10010 August 1999 Year 2000 Contingency Planning Activities Information Notice 1999-24, Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices1999-07-12012 July 1999 Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices Information Notice 1999-23, Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices1999-07-0606 July 1999 Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices Information Notice 1999-20, Contingency Planning for the Year 2000 Computer Problem1999-06-25025 June 1999 Contingency Planning for the Year 2000 Computer Problem Information Notice 1999-21, Recent Plant Events Caused by Human Performance Errors1999-06-25025 June 1999 Recent Plant Events Caused by Human Performance Errors Information Notice 1999-22, 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion1999-06-25025 June 1999 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion Information Notice 1999-19, Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant1999-06-23023 June 1999 Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant Information Notice 1999-18, Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders1999-06-14014 June 1999 Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses1999-06-0303 June 1999 Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses Information Notice 1999-16, Federal Bureau of Investigation'S Nuclear Site Security Program1999-05-28028 May 1999 Federal Bureau of Investigation'S Nuclear Site Security Program Information Notice 1999-15, Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis1999-05-27027 May 1999 Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick1999-05-0505 May 1999 Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick Information Notice 1999-13, Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs1999-04-29029 April 1999 Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs Information Notice 1999-12, Year 2000 Computer Systems Readiness Audits1999-04-28028 April 1999 Year 2000 Computer Systems Readiness Audits Information Notice 1999-11, Incidents Involving the Use of Radioactive Iodine-1311999-04-16016 April 1999 Incidents Involving the Use of Radioactive Iodine-131 Information Notice 1999-08, Urine Specimen Adulteration1999-03-26026 March 1999 Urine Specimen Adulteration Information Notice 1999-09, Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-9991999-03-24024 March 1999 Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-999 Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems1999-03-22022 March 1999 Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems Information Notice 1999-06, 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-06, 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-05, Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration1999-03-0808 March 1999 Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration Information Notice 1999-04, Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures1999-03-0101 March 1999 Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures Information Notice 1999-03, Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake)1999-01-29029 January 1999 Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake) Information Notice 1999-02, Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources1999-01-21021 January 1999 Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources Information Notice 1999-01, Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit1999-01-20020 January 1999 Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit Information Notice 1998-45, Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds1998-12-15015 December 1998 Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds Information Notice 1998-44, Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping1998-12-10010 December 1998 Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping Information Notice 1998-43, Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping1998-12-0404 December 1998 Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping Information Notice 1998-42, Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements1998-12-0101 December 1998 Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators From Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators From Design Oversight Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators from Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators from Design Oversight Information Notice 1998-39, Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 19971998-10-30030 October 1998 Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 1997 Information Notice 1998-40, Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents1998-10-26026 October 1998 Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents Information Notice 1990-66, Incomplete Draining and Drying of Shipping Casks1998-10-25025 October 1998 Incomplete Draining and Drying of Shipping Casks Information Notice 1998-38, Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections1998-10-15015 October 1998 Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections Information Notice 1998-37, Eligibility of Operator License Applicants1998-10-0101 October 1998 Eligibility of Operator License Applicants Information Notice 1998-36, Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems1998-09-18018 September 1998 Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems Information Notice 1998-34, Configuration Control Errors1998-08-28028 August 1998 Configuration Control Errors Information Notice 1998-33, NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities1998-08-28028 August 1998 NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities Information Notice 1998-31, Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 21998-08-18018 August 1998 Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 2019-03-12
[Table view] |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
OFFICE OF NEW REACTORS
OFFICE OF FEDERAL AND STATE MATERIALS
AND ENVIRONMENTAL MANAGEMENT PROGRAMS
WASHINGTON, DC 20555-0001 August 10, 2012 NRC INFORMATION NOTICE 2012-13: BORAFLEX DEGRADATION SURVEILLANCE
PROGRAMS AND CORRECTIVE ACTIONS IN
THE SPENT FUEL POOL
ADDRESSEES
All holders of an operating license or construction permit for a nuclear power reactor under
Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of
Production and Utilization Facilities, including those that have permanently ceased operations
and have spent fuel stored in the spent fuel pool.
All holders of or applicants for a combined license issued under 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants.
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform
addressees on the continuing issue of degradation of the neutron absorbing material Boraflex in
spent fuel storage racks. The NRC expects that recipients will review the information for
applicability to their facilities and consider actions, as appropriate, to avoid similar problems.
Suggestions contained in this IN are not NRC requirements; therefore, no specific action or
written response is required.
DESCRIPTION OF CIRCUMSTANCES
Turkey Point Nuclear Plant, Unit 3
In 2001, a condition prohibited by Turkey Point Nuclear Plant (TPNP), Unit 3 technical
specifications (TS) occurred when the areal density of boron in portions of a Boraflex panel in
the Unit 3 spent fuel pool (SFP) was measured to be less than the value used in the licensing
basis analysis. The areal density of the Boraflex panels was a critical design feature of the
spent fuel storage racks. Since 2001, Florida Power & Light Company (FPL) had found
degradation of Boraflex panels greater than assumed in safety reviews for the SFP and
incrementally took steps to assure the subcritical storage of fuel.
As part of a review in 2010, the NRC staff identified that FPL incorrectly used the combined
areal density of the panels in a single cell to determine compliance with the effective neutron
multiplication factor (keff) requirements in its TS. When the areal density of a single panel
degraded below the value assumed in the licensing basis analysis described in the updated final
safety analysis report, the licensee was not in compliance with its TS.
In addition, it was identified that the licensee failed to implement effective corrective actions as
required by 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action. Despite SFP
management controls which prohibited the placement of fuel assemblies into SFP cells with
greater than 50 percent Boraflex degradation, two cells were found to have stored fuel
assemblies in them. Although the licensee had a neutron absorber monitoring program, the
program was ineffective at identifying and mitigating degradation of the Boraflex panels in the
SFP. This unidentified and unmitigated degradation posed a potential safety concern because it
reduced the margin to criticality.
The licensee implemented compensatory measures to provide reasonable assurance that the
SFP remained subcritical until the licensee could implement an approved license amendment to
eliminate the reliance on Boraflex as a neutron absorber. The NRC issued a confirmatory
action letter (CAL), dated February 19, 2010, containing the licensees compensatory measures.
In a follow-up inspection report, the NRC staff confirmed that the licensee had implemented the
CAL commitments to address the degraded neutron absorbers in the spent fuel storage racks.
The NRC staff subsequently concluded that the licensee had reestablished compliance with the
license requirements for the spent fuel storage racks.
Additional information is available in the following documents:
(1) Licensee Event Report 05000250/2010-001-02, Spent Fuel Storage Design Feature
Assumption are Exceeded, dated June 7, 2011, (Agencywide Documents Access and
Management System (ADAMS) Accession No. ML11174A040).
(2) Turkey Point Nuclear Plant - NRC Integrated Inspection Report 05000250/2010008, dated March 11, 2010 (ADAMS Accession No. ML100700661).
(3) Turkey Point Nuclear Plant Unit 3 - NRC Inspection procedures 95001 Supplemental
and 92702 Follow up - Inspection Report 05000250/2010-010, dated January 6, 2011 (ADAMS Accession No. ML110060770).
(4) License Amendment Request - Spent Fuel Pool Boraflex Remedy, dated January 27,
2006 (ADAMS Accession No. ML060900250).
Peach Bottom Atomic Power Station, Unit 2
In 2010, Peach Bottom Atomic Power Station (PBAPS) performed an operability determination
(OD) that concluded that sufficient margin to criticality in its SFP would be maintained until
2014. However, the NRCs review of the OD concluded that the licensee had not accurately
projected the rate of Boraflex degradation and had used several nonconservative assumptions
in the analysis. The licensee performed a reanalysis and determined that several Boraflex
panels had degraded below the TS requirements as early as the fourth quarter of 2008. As a
result, contrary to 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Actions, the licensee
had not implemented corrective actions to prevent the Boraflex panels from degrading below the
TS requirements. Although the licensee had a neutron absorber monitoring program, the
program did not adequately monitor and manage degradation of the Boraflex panels in the SFP
to ensure sufficient margin to criticality was maintained. This unidentified and unmitigated
degradation posed a potential safety concern because it reduced the margin to criticality. In June 2011, the licensee relocated 201 fuel assemblies from the storage cells with the highest
Boraflex degradation. Additionally, the licensee put administrative controls in place to restrict
the usage of rack locations containing degraded Boraflex.
Additional information is available in the following documents:
(1) Licensee Event Report 05000277/2011-002-00, Condition Prohibited by Technical
Specifications due to Degraded Spent Fuel Pool Racks Boraflex Panels dated July 29,
2011 (ADAMS Accession No. ML11213A262).
(2) License Amendment Request - Use of Neutron Absorbing Inserts in Units 2 and 3 Spent
Fuel Pool Storage Racks, dated November 3, 2011 (ADAMS under Accession No.
ML113081441).
BACKGROUND
Generic Letter 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks, highlights
industry operational experience with the degradation of Boraflex that had been previously
addressed by the NRC IN 87-43, "Gaps in Neutron-Absorbing Material in High-Density Spent
Fuel Storage Racks," September 8, 1987; IN 93-70, "Degradation of Boraflex Neutron Absorber
Coupons," September 10, 1993; and IN 95-38, "Degradation of Boraflex Neutron Absorber in
Spent Fuel Storage Racks," September 8, 1995. Additionally, Generic Letter 96-04 requested
each licensee crediting Boraflex to provide the NRC with its plan to manage the degradation.
Since the issuance of Generic Letter 96-04, there has been additional operating experience with
neutron absorbing materials (other than Boraflex) degrading while in the spent fuel storage
racks. IN 09-26, Degradation of Neutron-Absorbing Materials in the Spent Fuel Pool, October 28, 2009, addresses the degradation of the materials Boral and Carborundum.
IN 09-26 emphasizes that to prevent noncompliance with SFP criticality requirements, it is
important to know the condition of the neutron absorbing material in the SFP and monitor the
SFP for any indications that the material may be degrading.
DISCUSSION
Fuel stored in the spent fuel storage racks must be maintained subcritical in accordance with
the requirements in 10 CFR 50.68(b)(4). This IN is to inform licensees about the importance of
effective surveillance programs and corrective actions when dealing with Boraflex degradation
in the SFP. The occurences at TPNP and PBAPS are recent examples where the surveillance
programs and corrective actions were not effective in dealing with Boraflex degradation.
The recent operating experience with neutron absorber degradation, like that of Boraflex, demonstrates the need for effective material surveillance programs. These instances highlight
that ineffectual monitoring and corrective actions can lead to unidentified and unmitigated
degradation that may challenge the subcritical margin for the SFP. An effective surveillance
and monitoring program for neutron absorber materials degradation is essential to manage the
degradation before it results in a potential safety concern.
CONTACT
This IN requires no specific action or written response. Please direct any questions about this
matter to the technical contacts listed below or the appropriate NRC project manager.
/RA/ /RA/
Timothy J. McGinty, Director Larry W. Camper, Director
Division of Policy and Rulemaking Division of Waste Management
Office of Nuclear Reactor Regulation and Environmental Protection
Office of Federal and State Materials and
Environmental Management Programs
/RA by JLuehman for/
Laura A. Dudes, Director
Division of Construction Inspection
and Operational Programs
Office of New Reactors
Technical Contacts: Christopher Hunt, NRR Matthew G. Yoder, NRR
301-415-1652 301-415-4017 E-mail: christopher.hunt@nrc.gov E-mail: matthew.yoder@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under NRC Library.
ML121660156 *via e-mail TAC ME8326 OFFICE NRR/ESGB NRR/ESGB Tech Editor* BC:NRR/ESGB D:NRR/DE
NAME CHunt MYoder QTE GKulesa PHiland
DATE 6/14/2012 6/18/2012 6/26/2012 6/19/2012 6/21/2012 OFFICE BC:NRR/SRXB BC:FSME/RDB LA:NRR/PGCB PM:NRR/PGCB BC:NRR/PGCB
NAME AUlses BWatson CHawes BPurnell DPelton
DATE 7/10/2012 7/11/2012 7/12/2012 7/12/2012 7/31/2012 OFFICE LA:NRR/PGCB* D:NRO/DCIP D:FSME/DWMEP D:NRR/DPR
NAME CHawes LDudes (JLuehman for) LCamper TMcGinty
DATE 7/31/2012 8/3/2012 8/9/2012 8/10/2012
|
---|
|
list | - Information Notice 2012-01, Seismic Considerations--Principally Issues Involving Tanks (26 January 2012, Topic: Functionality Assessment, Earthquake, Operability Assessment)
- Information Notice 2012-02, Potentially Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments (5 March 2012, Topic: Ultimate heat sink, Probabilistic Risk Assessment, Earthquake, Generic Issues Program)
- Information Notice 2012-02, Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments (5 March 2012, Topic: Ultimate heat sink, Probabilistic Risk Assessment, Earthquake, Generic Issues Program)
- Information Notice 2012-03, Design Vulnerability in Electric Power System (1 March 2012, Topic: Offsite Circuit)
- Information Notice 2012-03, Design Vulnerability In Electric Power System (1 March 2012, Topic: Anticipated operational occurrence, Offsite Circuit)
- Information Notice 2012-04, Impacts on Normal Plant Operations Due to Leaks or Spills of Chemicals (19 April 2012)
- Information Notice 2012-05, Abnormal Releases of Radioactive Water Potentially Resulting in Groundwater Contamination (25 April 2012, Topic: Coatings)
- Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations (24 April 2012, Topic: Hydrostatic, Preliminary White Finding)
- Information Notice 2012-07, Tube-to-Tube Contact Resulting in Wear in Once-Through Steam Generators (17 July 2012, Topic: Nondestructive Examination, Stress corrosion cracking)
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (Hdr) Physical Presence Requirements (10 April 2012, Topic: Enforcement Discretion)
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements (10 April 2012, Topic: Enforcement Discretion)
- Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. (30 November 2019, Topic: Anticipated operational occurrence, Safe Shutdown Earthquake, Earthquake, Affidavit)
- Information Notice 2012-10, Recent Issues Associated with Submittal of NRC Form 396, Certification of Medical Examination by Facility Licensee, for Applicants and Licensed Operators at Non-Power Reactors (16 July 2012)
- Information Notice 2012-10, Recent Issues Associated With Submittal Of NRC Form 396, Certification Of Medical Examination By Facility Licensee, For Applicants And Licensed Operators At Non-Power Reactors (16 July 2012)
- Information Notice 2012-11, Age Related Capacitor Degradation (23 July 2012)
- Information Notice 2012-12, HVAC Design Control Issues Challenge Safety System Function (24 July 2012, Topic: Unanalyzed Condition, Enforcement Discretion)
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool (10 August 2012, Topic: Operability Determination)
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool (10 August 2012, Topic: Operability Determination)
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due To Stem-Disc Separation (24 July 2012, Topic: Safe Shutdown, Incorporated by reference)
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due to Stem-Disc Separation (24 July 2012, Topic: Safe Shutdown, Incorporated by reference)
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage from Joints That Use A-286 Bolts (9 August 2012, Topic: Boric Acid, Intergranular Stress Corrosion Cracking, Stress corrosion cracking, Liquid penetrant)
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage From Joints That Use A-286 Bolts (9 August 2012, Topic: Boric Acid, Intergranular Stress Corrosion Cracking, Stress corrosion cracking, Liquid penetrant)
- Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing (29 August 2012, Topic: Power Uprate)
- Information Notice 2012-17, Certified Material Test Reports and Age Hardened Concrete Compressive Strength (6 September 2012, Topic: Internal Flooding, Earthquake)
- Information Notice 2012-19, License Renewal Post-Approval Site Inspection Issues (23 October 2012, Topic: Aging Management, Flow Accelerated Corrosion, License Renewal)
- Information Notice 2012-20, Potential Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel and Maintenance of Dry Cask Storage System Canisters (14 November 2012, Topic: Boric Acid, Aging Management, Stress corrosion cracking, License Renewal, Subsequent License Renewal, Fuel cladding, Backfit, Regulatory Conference)
- Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup (10 December 2012, Topic: Unanalyzed Condition, Hydrostatic, Unidentified leak)
- Information Notice 2012-22, Rev. 1 - Counterfeit, Fraudulent, Suspect Item Training Offerings (20 November 2019)
- Information Notice 2012-25, Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors (1 February 2013, Topic: Safe Shutdown Earthquake, Operating Basis Earthquake, Earthquake)
|
---|