Information Notice 2012-02, Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments

From kanterella
Jump to navigation Jump to search
Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments
ML090510269
Person / Time
Issue date: 03/05/2012
Revision: 0
From: McGinty T J, Camper L W, Dudes L A, Kinneman J D, Weaver D W
Division of Policy and Rulemaking, NRC/FSME/DWMEP, NRC/NMSS/FCSS, NRC/NMSS/SFST, Office of New Reactors
To:
Ferrante, Fernando NRR/DRA, 415-8385
References
FOIA/PA-2012-0325 IN-12-002
Download: ML090510269 (6)


ML090510269 March 5, 2012 NRC INFORMATION NOTICE 2012-02: POTENTIALLY NONCONSERVATIVE SCREENING VALUE FOR DAM FAILURE FREQUENCY IN PROBABILISTIC RISK ASSESSMENTS

ADDRESSEES

All holders of an operating license or construction permit for a nuclear power reactor under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities." All holders of or applicants for an early site permit, standard design certification, standard design approval, manufacturing license, or combined license under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants." All holders of and applicants for a fuel cycle facility license under 10 CFR Part 70, "Domestic Licensing of Special Nuclear Material." All holders of and applicants for an independent spent fuel storage installation license under 10 CFR Part 72, "Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste." All holders of and applicants for a gaseous diffusion plant certificate of compliance or an approved compliance plan under 10 CFR Part 76, "Certification of Gaseous Diffusion Plants." All holders of and applicants for a specific source material license under 10 CFR Part 40, "Domestic Licensing of Source Material." All Agreement State Radiation Control Program Directors and State Liaison Officer

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to alert addressees of a potentially nonconservative screening value for dam failure frequency that originated in 1980's reference documents which may have been referenced by licensees in their probabilistic risk assessment (PRA) for external event Using a nonconservative screening value for dam failure frequency to evaluate the need for an additional detailed analysis may result in underestimating the risks to the plant associated with external flooding or loss of heat sink from the failure of upstream and downstream dams or levee The NRC expects that recipients will review the information for applicability to their facilities and consider actions, as appropriate, to avoid similar problem Suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is require

BACKGROUND

The NRC staff has identified a potentially nonconservative screening value for dam failure frequency contained in Nuclear Safety Analysis Center (NSAC) report NSAC-60, "A Probabilistic Risk Assessment of Oconee Unit 3," issued June 198 NSAC-60 calculated a value for the dam failure frequency of the Jocassee Dam, a value referenced by other licensees in their flooding analyse The NSAC-60 PRA study determined the failure frequency for the Jocassee Dam by compiling data for dams with similar attribute NSAC-60 then performed a Bayesian analysis using historical dam failures to estimate the annual failure frequency at the time the analysis was performed (1981) and an associated uncertainty range for dams built within different time periods: 1900-1981, 1940-1981, and 1960-198 For these time periods, the NSAC-60 PRA analysis determined that the median annual failure frequencies for the Jocassee Dam based on each of these data ranges were 2.3x10-5/year, 1.6x10-5/year, and 1.4x10-5/year, respectively, from causes other than earthquakes and overtopping (which NSAC-60 treated separately).

The NSAC-60 approach estimated the failure frequency for the Jocassee Dam by screening the available historical data for United States (U.S.) dams at the time of the analysis (1981) and using only the data deemed applicable to the Jocassee Dam, based on characteristics such as (1) dam composition, (2) construction completion date, and (3) failure mode NSAC-60 acknowledged the challenge in collecting sufficient historical information based on the scarcity of the data applicable to the specific dam characteristics considered, as well as the complexity of the actual phenomena controlling dam failures and their potential impacts on a nuclear power plant sit The NRC subsequently included the NSAC-60 dam failure frequency results in NUREG/CR-5042, "Evaluation of External Hazards to Nuclear Power Plants in the United States," which was initially published in 198 NUREG/CR-5042 reported bounding calculations with results of "10-6/year or even smaller" for modern well-engineered dams and a range of values between "10-4/year and 10-5/year," referring to NSAC-60 in both cases (NUREG/CR-5042, page 5-8, Agencywide Documents Access and Management System (ADAMS) Accession No. ML111950285). Some licensees referred directly to NSAC-60 as part of their Individual Plant Examination of External Events submittal in response to Supplement 4 to Generic Letter 88-20, "Individual Plant Examination for Severe Accident Vulnerabilities," dated November 23, 198 In other cases, licensees may have indirectly used NSAC-60 via references such as NUREG/CR-504 Bounding values for dam failure frequency, such as those mentioned in NUREG/CR-5042 were not the result of a dam-specific analysis but instead utilized a generic dam failure database to determine a bounding generic estimate of dam failure frequenc The information used to determine the generic estimate can be a starting point to estimate bounding values of dam failure frequency for another dam by adjusting for dam-specific differences involving design, operation, and potential failure mechanism For example, including historical dam failure events that failed in a manner that could not occur at the dam being analyzed would increase the estimated dam failure frequenc Also, consideration of site-specific characteristics such as meteorology and hydrology may either increase or decrease the likelihood of a dam failure with respect to a generic estimat

DESCRIPTION OF CIRCUMSTANCES

After reviewing the dam failure frequency estimates in NSAC-60, the NRC staff noted that many assumptions in the dam failure rate estimation approach used in NSAC-60 are strongly dependent on the completeness and accuracy of the dam data used and on the criteria for including or excluding certain failure events and operational years deemed to be applicable to characteristics specific to the dam considered in NSAC-60 (i.e., type, height, construction year, and years of operation). The NRC staff also noted that NSAC-60 did not consider hazards in an integrated manner and instead considered several hazard categories separately, leading to certain hazard categories being completely excluded from the calculation of dam failure frequenc In particular, the dam failure frequency derived in NSAC-60 was representative of failure modes resulting from causes other than hydrologic (e.g., severe precipitation) and seismic events, which NSAC-60 considered in separate analyse The NSAC-60 method considered severe precipitation events to be negligible contributors to downstream impacts and screened them out from further consideration, although these types of events are responsible for the majority of the dam failures recorded in historical dat Additionally, failure modes associated with nonhydrologic, nonseismic phenomena (e.g., internal erosion/degradation) were screened out because they were deemed not applicable based on site-specific design considerations made in NSAC-6 Based on the NRC staff's assessment, screening failure modes from the historical data and special treatment of failure modes may require additional detailed analyses beyond the consideration of the specific dam design features in order to establish sufficient technical base Additionally, the NRC staff believes that excluding credible hazard categories such as hydrologic events without an integrated assessment could lead to an underestimation of the true dam failure frequenc To assess the impact of the NSAC-60 screening assumptions, the NRC staff reviewed currently available databases for U.S. dam In order to determine generic dam failure frequencies, the NRC staff used the databases to find (1) the number of historical failures of dams of a particular characteristic, such as dam type, and (2) the total number of years of operation for dams of the same characteristi The NRC staff reviewed databases of historical dam failure events, primarily the National Performance of Dams Program by Stanford University, http://npdp.stanford.edu, and a database of the existing U.S. dam population, the National Inventory of Dams maintained by the U.S. Army Corps of Engineers (USACE), http://nid.usace.army.mil1 1 Although the USACE Web site states, "Non-government users are no longer able to directly download any data from this site," nongovernment users can request access to the data by contacting the USACE staff member specified on this Web site. . While these databases contain valuable information and are more complete and accurate than information available when NSAC-60 was prepared, the NRC staff still found challenges in using the databases to justify with sufficient technical basis a very low value of dam failure frequency using only historical dat The databases were not created for the specific purpose of performing dam failure frequency calculations and were not designed to be fully consistent with each othe Notwithstanding, these databases are still the primary source of information on existing dams and event The discussion contained in this IN does not intend to express judgment on the quality of the efforts to develop these databases; instead, it highlights the challenges in the input and categorization of data for such a wide population that potential users also need to take into account when deriving estimates for low-probability event For example, the NRC staff found that, for historical dam failure events, there is, as indicated by NSAC-60, an inherent challenge in the completeness of failure event accounts (e.g., construction year of failed dam and failure mode) and the consistency of definitions used on both failed and operating dams (e.g., dam types). In particular, eliminating selected failure modes from consideration without sufficient technical basis while retaining the population contribution for total number of years can produce an artificially low dam failure frequenc To understand the impact of these data challenges, the NRC staff analyzed the ranges of generic dam failure frequency estimates that can be derived from these database The NRC staff also reviewed (1) the literature on previously published dam failure rates based on historical evidence for the U.S. and the international population of dams, and (2) available information on the latest dam risk assessment methodologies, including the following publications, which can be obtained from the U.S. Department of the Interior's Bureau of Reclamation (USBR) (http://www.usbr.gov): "Comparison of Failure Modes from Risk Assessment and Historical Data from Bureau of Reclamation Dams," revised in 1998; and "Dam Safety Risk Analysis Best Practices Training Manual," Version 2.1, issued in 201 Although historical dam failure information can provide useful qualitative insights on the general performance and failure modes for certain dam types, its applicability to site-specific dams has to be assessed to establish sufficient technical base This is due to the variability in site-specific characteristics (i.e., hydrologic, geologic, and operational) and the potential contributions of site-specific failure modes not covered by database The range of estimates presented in NSAC-60 (i.e., between 2.3x10-5/year and 1.4x10-5/year) is below the range of estimates found in the available literature for generic dam failure rate estimate Additionally, frequency extrapolations of severe weather phenomena with insufficient basis may not be fully justified depending on the quality and quantity of the supporting information beyond certain values (e.g., see DSO-04-08, "Hydrologic Hazard Curve Estimating Procedures," issued June 2004 by USBR).

DISCUSSION

Both NSAC-60 and NUREG/CR-5042 reference dam failure rate estimates in the context of external flooding analyses incorporating a dam failur However, recent NRC reviews determined that the generic failure frequency estimate used in NSAC-60 combined generic information with site-specific screening criteria that produced median values lower than those available in published literature on latest dam risk assessment methodologies and NRC staff's assessment Consideration of data sources currently available also indicates that (1) such significantly lower values may not be justified by historical data alone, and (2) applying the NSAC-60 estimate to other dams with different characteristics may be inappropriat Reasons for this include the fact that generic failure frequency values may not account for site-specific features and can be highly dependent on the completeness and applicability of available information to site-specific dams, which may counteract conservative assumptions in the use of dat Hence, both NSAC-60 and NUREG/CR-5042 provide an insufficient basis for estimating site-specific dam failure frequenc NRC staff intends to evaluate the need to modify NUREG/CR-5042 based on the items discussed in this generic communicatio These considerations indicate that data available in these databases are useful in identifying failure mechanisms and performance insights as well as approximate generic dam failure rate estimates, but may not provide sufficient basis for site-specific estimates or to screen out the contribution of external flooding sources or loss of ultimate heat sink to the overall plant ris Generic failure rate estimates encompass all documented dam failures, irrespective of their potential impacts on a downstream sit By including a large population of dams with a wide variety of features, the resulting failure frequency may or may not be appropriate for any one specific dam or nuclear power plant sit Although there is no specific regulatory requirement to do so, addressees may evaluate their current or planned site-specific estimate of dam failure frequency in light of the information contained in the IN and address any resulting implications on their external event PR Based on the information discussed above, NRC staff has initiated an internal review under the Generic Issues Program, managed by the NRC Office of Nuclear Regulatory Research, to consider this issue in a generic sense (ADAMS Accession No. ML102210339).

CONTACT

This IN requires no specific action or written respons Please direct any questions about this matter to the technical contacts listed belo /RA by EBenner for/ /RA/ Douglas W. Weaver, Acting Director Timothy J. McGinty, Director Division of Spent Fuel Storage Division of Policy and Rulemaking and Transportation Office of Nuclear Reactor Regulation Office of Nuclear Material Safety and Safeguards

/RA/ /RA/ Laura A. Dudes, Director John D. Kinneman, Director Division of Construction Inspection Division of Fuel Cycle Safety and Safeguards and Operational Programs Office of Nuclear Material Safety and Safeguards Office of New Reactors /RA by BWatson for/ Larry W. Camper, Director Division of Waste Management Office of Federal and State Materials and Environmental Management Programs Technical Contacts: Fernando Ferrante, NRR/DRA Jeffrey Mitman, NRR/DRA 301-415-8385 301-415-2843 E-mail: Fernando.Ferrante@nrc.gov E-mail: Jeffrey.Mitman@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under NRC Librar variety of features, the resulting failure frequency may or may not be appropriate for any one specific dam or nuclear power plant sit Although there is no specific regulatory requirement to do so, addressees may evaluate their current or planned site-specific estimate of dam failure frequency in light of the information contained in the IN and address any resulting implications on their external event PR Based on the information discussed above, NRC staff has initiated an internal review under the Generic Issues Program, managed by the NRC Office of Nuclear Regulatory Research, to consider this issue in a generic sense (ADAMS Accession No. ML102210339).

CONTACT

This IN requires no specific action or written respons Please direct any questions about this matter to the technical contacts listed belo /RA by EBenner for/ /RA/ Douglas W. Weaver, Acting Director Timothy J. McGinty, Director Division of Spent Fuel Storage Division of Policy and Rulemaking and Transportation Office of Nuclear Reactor Regulation Office of Nuclear Material Safety and Safeguards /RA/ /RA/ Laura A. Dudes, Director John D. Kinneman, Director Division of Construction Inspection Division of Fuel Cycle Safety and Safeguards and Operational Programs Office of Nuclear Material Safety and Safeguards Office of New Reactors /RA by BWatson for/ Larry W. Camper, Director Division of Waste Management Office of Federal and State Materials and Environmental Management Programs Technical Contacts: Fernando Ferrante, NRR/DRA Jeffrey Mitman, NRR/DRA 301-415-8385 301-415-2843 E-mail: Fernando.Ferrante@nrc.gov E-mail: Jeffrey.Mitman@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under NRC Librar ADAMS Accession Number: ML090510269 OFFICE APOB:NRR APOB:NRR Tech Editor BC:APOB:NRR D:DRA:NRR NRR/DE NAME F Ferrante J Mitman KKribbs J Circle M Cheok G Wilson DATE 4/ 11 /2011 4/ 11 /2011 1/17/2011 e-mail 7/14/2011 7/15/2011 05/18/2011 OFFICE BC:ETB:RES BC:PRAB:RES BC:RHEB:NRO BC:SPRA:NRO LA:PGCB:NRR PM:PGCB:NRR NAME W Ott K Coyne R Raione L Mrowca CHawes DBeaulieu DATE 4/ 04 /2011 4/ 08 /2011 4/ 05 /2011 4/ 08 /2011 7/25/2011 7/21/2011 OFFICE BC:PGCB:NRR D:DFCSS:NMSS D:DSFST:NMSS D:DWMEP:FSME D:DCIP:NRO D:DPR:NRR NAME SRosenberg J Kinneman DWeaver LCamper L Dudes T McGinty OFFICE 7/25/11 1/30/12 2/02/2012 3/02/12 3/05/12 3/05/12 OFFICIAL RECORD COPY