ML12053A264

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 9.5.1 Fire Protection
ML12053A264
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/26/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Poole J
References
Download: ML12053A264 (3)


Text

\.~"R REGu~ UNITED STATES

~~v "01' NUCLEAR REGULATORY COMMISSION

P ~0 WASHINGTON, D.C. 20555-0001

<t

~

~ ~

~ ~

1-1') ~o

        • ~ March 26, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2 SUB..IECT:

SUMMARY

OF NOVEMBER 16, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On November 16, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staff's questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety Analysis Report, Section 9.5.1, Fire Protection Report, in support of TVA's application for an operating license. A list of participants is enclosed.

The meeting consisted of the NRC staff and TVA staff discussing recent requests for additional information response clarifications on the fire protection report for Watts Bar Unit 2. Two additional issues from the meeting required TVA to submit additional information regarding:

positive statements regarding compliance with Appendix R III.G requirements, and fire brigade training requirements with respect to individual brigade members.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv

LIST OF PARTICIPANTS NOVEMBER 16, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY - FINAL SAFETY ANALYSIS REPORT REVIEW SECTION 9.5.1 FIRE PROTECTION WATTS BAR NUCLEAR PLANT, UNIT 2 Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

Participants:

PositionlTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)

Division of Operating Reactor licensing (DORL)

Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Alex Klein Branch Chief Fire Protection Branch (AFPB)

Division of Risk Assessment (DRA)

Daniel Frumkin Team Leader AFPBIDRA Charles Moulton Fire Protection Engineer AFPB/DRA Gary Cooper Fire Protection Engineer AFPBIDRA B. Metzger Fire Protection Engineer AFPBIDRA Tennessee Valley Authority (TVA)

Participants:

Gordon Arent Licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Steve Hilmes Electrical and I&C TVA Watts Bar Unit 2 Manager Charles Brush Electrical Engineer EPM Enclosure

March 26, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF NOVEMBER 16, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT RELATED TO SECTION 9.5.1 FIRE PROTECTION On November 16, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staffs questions and comments on the Watts Bar Nuclear Plant Unit 2 Final Safety Analysis Report, Section 9.5.1, Fire Protection Report, in support of TVA's application for an operating license. A list of participants is enclosed.

The meeting consisted of the NRC staff and TVA staff discussing recent requests for additional information response clarifications on the fire protection report for Watts Bar Unit 2. Two additional issues from the meeting required TVA to submit additional information regarding:

positive statements regarding compliance with Appendix R III.G requirements, and fire brigade training requirements with respect to individual brigade members.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRA!

Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB R/F PMNS Resources RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource CMoulton, NRR AKlein, NRR J Ledford , RII DFrumkin, NRR JPoole, NRR PMilano, NRR GCooper, NRR BMetzger, NRR RHanna, RII CSteger, NRR ADAMS Accession No'.. ML12053A264 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 2/27112 2/27112 3/26112 OFFICIAL RECORD COpy