QF-1030-19 Rev. 12 EXAMINATION SCENARIO GUIDE (ESG)

SITE: DAEC RESET RCIC MECHANICAL TRIP, REACTOR POWER ADJUSTMENT, WELL WATER PUMP TRIP, RECIRC FLOW CTRL UPSCALE FAILURE, RPS EPA BKR TRIP, ESG NRC 11-03 REV 0 UNISOLABLE HPCI LEAK, RCIC AUTO START FAILURE, ONE ADS SRV FAILS TO OPEN PROGRAM: OPERATIONS #:

COURSE: INITIAL LICENSED OPERATOR #:

TOTAL TIME: 90 MINUTES Developed by:

Instructor Date Validated by:

SME/Instructor Date Reviewed by:

Operations Manager Date Approved by:

Training Supervisor-Operations Date Page 1 of 21

2011 NRC ILT Scenario #3 GUIDE REQUIREMENTS Goal of The goal of this scenario is to evaluate ILT students during the NRC Training: Exam with 3 man crew.

Learning There are no formal learning objectives Objectives:

Prerequisites: None Simulator Simulator Booth Instructor Training Phone Talker Resources:

Simulator Floor Instructor

References:

None None Commitments:

Evaluation Dynamic Simulator Method:

Operating None Experience:

Initiating Event with Core Damage Frequency:

N/A due to exam security Important Components:

Related PRA N/A due to exam security Information:

Important Operator Actions with Task Number:

N/A due to exam security Page 2 of 21

2011 NRC ILT Scenario #3 SCENARIO

SUMMARY

The scenario begins with reactor power at 90%. RCIC was operating in CST-CST for baseline vibration testing. An Engineer accidently bumped the Mechanical Trip arm and RCIC tripped. A visual inspection determined no damage to RCIC and the trip is ready to be reset and placed in standby IAW OI-150, Section 3.3.

Once RCIC is placed in standby, the crew will continue the Power adjustment. Then the B Recirc Pump flow controller will fail upscale and the operators will lock up the scoop tube IAW the AOP. The SRO will address Technical Specifications (TS) for the speed mismatch.

An EPA breaker will trip on A RPS resulting in 1/2 scram. The crew will enter the AOP, transfer RPS to the alternate supply and the 1/2 scram will be reset. The SRO will address TS for the EPA trip.

A leak will develop on the HPCI steam line in Secondary Containment and will not be isolable.

Area temperatures will rise requiring EOP entry and a reactor scram (CRITICAL TASK 1.0).

Additionally, as RPV level lowers RCIC will fail to initiate at its auto setpoint and must be placed in service manually for RPV level control. As area temperatures continue to rise, an Emergency Depressurization(ED) must be performed when the max safe operating limit is exceeded in more than one area (CRITICAL TASK 2.0). During the ED, one ADS SRV will fail to open and another SRV must be opened.

The scenario ends with the ED completed and RPV level at >170 inches.

Page 3 of 21

2011 NRC ILT Scenario #3 SCENARIO OUTLINE:

BOOTH INSTRUCTOR ACTIONS 1 SIMULATOR SET UP: (perform set up per the Simulator Setup Checklist, including entering actions items per the Simulator Input Summary.)

Start Sim View / Data Capture Program for EXAM ONLY 1.1 General Instructions

a. Restore the IC for ILT Scenario 3 from the Thumb Drive that it is stored on.
b. If the thumb drive is not available, then reset to IC 20 and set the Malfunctions, Remotes, Overrides, and Triggers as per the tables below.
c. Reduce power to 90% with Recirc
d. Set up RCIC in CST to CST mode and INSERT MALFUNCTION RC01
e. Verify Pull Sheet setup matches current step and rod position
f. Place SPMET1 on a computer terminal (IAW AOP 903). Use the terminal over by the MIDAS computer.

1.2 EVENT TRIGGER DEFINITIONS:

Trigger Trigger Logic Statement Trigger Word Description No.

15 RPDIS1SHUTDOWN(1) >= 1 Mode Switch Taken to shutdown 17 ZAOFWLI4561<=.03 GEMAC Level <160 30 ZDITCPRSPTDECR >= 1 Pressure Set Decrease Push Button Depress Page 4 of 21

2011 NRC ILT Scenario #3

1.3 MALFUNCTIONS

Time Malf. No. Malfunction Title Delay Ramp ET Initial Final Value Value Setup SW13A HPCI Room Cooler Flow Blockage 0 100 Setup SW13B HPCI Room Cooler Flow Blockage 0 100 Setup RC01 RCIC Mechanical Overspeed Trip Active Active Setup STRC01 Trip OVRD-RCIC Fails to Auto Active Active Start Setup MS31C Group 6 Isolation Fail to Close- Active Active MO-2238 Setup MS31D Group 6 Isolation Fail to Close- Active active MO-2239 Setup STEHC02 Trip Override-B EHC Pump 1P97 active active Fails to Auto Start As Dir SW21D Well Water Pump Trip - Pump D, 1 Inactive Active 1P58D As Dir RR17B Recirc MG Flow Controller Fails, 5 minutes 3 AS IS 100%

50 seconds Auto/Man Modes MG B As Dir RP02B RPS EPA Breaker Trip- RPS B 5 Inactive Active EPA Breaker As Dir HP05 HPCI Steam Supply Line 10 13 0 15 Break/HPCI Room minutes As Dir HP08 HPCI Steam Supply Line 10 15 0 10 Break/Torus Room minutes AUTO ED06C SU Transformer Loss 17 Inactive Active As Dir TC02A EHC Hydraulic Pump Trip-Pump A 30 Inactive Active

1.4 OVERRIDES

Time Override No. Override Title Delay Ramp ET Initial Final Value Value Setup DI-AD-019 HS-4406 ADSPSV4406, AUTO AUTO DMSL,1140(Auto Open)

Setup DI-HP-013 HS-2238STM LINE ISOL AUTO AUTO MOV-2238 Setup DI-HP-014 HS-2238STM LINE ISOL AUTO AUTO MOV-2239 1.5 REMOTE FUNCTIONS:

Time Remote Remote Title Delay Ramp ET Initial Final No. Value Value Setup RP04 RPS Alternate Power Supply 1Y16 or 1Y26 1Y26 1Y26 Setup RP01C C RPS EPA Breaker (Trip/Reset) TRIP RESET Setup FP09 HPCI Deluge Man Isolation Valve CLOSE CLOSE V-33-82(Open,Close)

Page 5 of 21

2011 NRC ILT Scenario #3 FLOOR INSTRUCTOR ACTIONS Simulator Pre-brief:

2.1 Individual position assignments 2.2 Simulator training changes since last module (N/A) 2.3 Simulator hardware and software modifications/problems that may impact training Page 6 of 21

2011 NRC ILT Scenario #3 TURNOVER INFORMATION Day of week and shift Today Day Shift Weather conditions Hot, Humid A Severe Thunderstorm Watch is in effect for the next 31/2 hours. All AOP 903 actions are complete.

(Plant power levels) 90%

MWT 1683 MWE 561 CORE FLOW 41.0 Thermal Limit Problems/Power Evolutions Plant Risk Status CDF  ?????

Color Yellow Existing LCOs, date of next surveillance RCIC - TS 3.5.3.A. - Day 1 of 14 day LCO STPs in progress or major maintenance None Equipment to be taken out of or returned to service this shift/maintenance on major plant equipment RCIC Continuation of Load Line adjustment. Will need to pull all step 34 rods to position 20, then will need to stop there for Comments, evolutions, problems, core damage frequency, etc.

RCIC was operating in CST-CST for baseline vibration testing. An Engineer accidently bumped the linkage for the Mechanical Overspeed Trip and RCIC tripped 40 minutes ago. A visual inspection determined no damage to RCIC and the trip is ready to be reset and placed in standby IAW OI-150, Section 3.3. The 2nd Assistant and the System Engineer are standing by in the RCIC room to observe the reset.

Torus Cooling and ESW were secured after RCIC tripped. A RCIC surveillance test will be run on the next shift.

A Load Line Adjustment is progress. When RCIC has been placed in Standby, continue the Load Line Adjustment. The directions are to pull step 34 rods to position 20 (symmetrical). Call the RE after all the step 34 rods are at position 20. He will provide further guidance then.

Page 7 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Shift Turnover COMPLETE TURNOVER: Get familiar with plant conditions.

  • Provide Shift Turnovers to the SRO
  • SRO will provide beginning of shift brief to coordinate the tasks that and ROs.

were identified on the shift turnover.

a. Review applicable current Plant Status
b. Review relevant At-Power Risk status
c. Review current LCOs not met and Action Requirements
d. Verify crew performs walk down of control boards and reviews turnover checklists EXAMINER NOTE: Continue to next event at examiners direction page 8 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Booth Instructor: There are no actions SRO Event #1 necessary to start this event.

Directs that RCIC be reset and placed in standby IAW OI-150 Unisolate and Reset RCIC RO Booth Instructor respond as plant personnel and respond as necessary: Monitors reactor power, pressure and level during the RCIC return to service evolution BOP IAW OI-150, Section 3.3 resets RCIC and places in standby as follows:

  • Verify Turbine Steam Supply, MO2404 is CLOSED.
  • Place and hold HS-2405 TURBINE STOP VALVE MOTOR CONTROL MO-2405 in CLOSE until the Motor Control indicates full closed.

PROCEDURE NOTE If the RCIC Turbine Trip was due to a mechanical overspeed condition, neither the MO-2405 valve nor motor operator will open until reset locally at the RCIC Turbine. If the trip condition is not cleared, the valve for MO-2405 will not open, regardless of motor operator position.

If the turbine trip was due to mechanical overspeed, perform the following to manually reset the mechanical trip linkage (see drawing in Appendix 2):

Booth Instructor: Contacts 2nd Assistant to perform the next two steps When contacted to perform the steps to reset the mechanical overspeed on RCIC 1. Move the spring loaded emergency connecting rod against the DELETE MALFUNCTION RC01 and spring force, moving the emergency head lever away from the report the steps are completed emergency tappet and tappet nut. ___________

page 9 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE

2. Ensure the emergency tappet moves in the downward direction and the tappet nut locates in the trip reset position on the head bracket to hold the emergency connecting rod in position under spring tension.
  • Place and hold HS-2405 in the OPEN position until the Motor Operator Control indicates full open.
  • Verify Turbine Stop Valve MO-2405 indicates full open.

Role Play: If asked, the RCIC Drain Trap Bypass Valve V-24-62 is closed.

PROCEDURE NOTE Following a Turbine run, oil level may require an hour, after turbine shutdown, to return to standby/shutdown conditions.

EXAMINER NOTE:

  • If the RCIC turbine trip is being reset during RCIC testing or other The operator continues in Section 3.4. maintenance evolutions, the CRS may decide to mark the following The first step is to complete Att.4. step N/A.

The lineup is attached to the end of this Unless directed by the CRS, continue with Section 3.4, FINAL RETURN scenario. TO STANDBY READINESS (otherwise, mark this step N/A).

Complete the RCIC System Control Panel Lineup (Attachment 4).

Once the attachment is completed, the next event may begin.

EXAMINER NOTE: Continue to next event at examiners direction page 10 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Booth Instructor: respond as plant Event #2 personnel and respond as necessary: SRO Load Line Give crew Reactivity brief to withdraw control rods.

Adjustment RO

  • Provides Peer Check to RO during reactivity change
  • Monitors Balance of plant equipment EXAMINER NOTE: Continue to next event at examiners direction page 11 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE Event #3 Booth Instructor: When directed by the CREW D Well Water Chief Examiner: Responds to Annunciator 1C23C (F-1) - D Well Water Pump High/Low Pump trip INSERT EVENT TRIGGER 1 Flow This inserts SW21D, the D Well Water trip.

SRO Booth Instructor: respond as plant

  • Enters AOP 408 WELL WATER SYSTEM ABNORMAL OPERATION personnel and respond as necessary:
  • Directs starting of additional Well Water pump and restores system parameters Role Play: When contacted by control
  • Directs monitoring of Drywell pressure & temperature room, acknowledge request to check out
  • Notifies Duty Manager D well house. Report back after 5 minutes that nothing abnormal was observed at the well house. RO
  • Monitors reactor power pressure and level Role Play: When directed to check the
  • Monitors Drywell pressure & temperature breaker for the D Well, report back after 5 minutes that the breaker is tripped, but BOP you have no indications why.

Per AOP 408 immediate actions:

  • Ensures an ESW pump is running to provide cooling to the Control Building Chillers and to reduce demand on the Well Water System.

Examiner Note: May use QRC to start ESW pumps

  • Starts a standby Well Water Pump, and adjusts flow at the back panel.

EXAMINER NOTE: Continue to next event at examiners direction page 12 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE Event #4 Booth Instructor, at the direction of the Crew B Reactor Chief Examiner: Diagnoses event: Lowering APRM power and B Recirc Pump speed Recirc Pump INSERT EVENT TRIGGER: 3 speed controller RR17A to 100 over 5 minutes 50 sec SRO fails downscale This will cause the B Recirc M-G speed Directs entry to AOP 255.2:

controller to ramp up slowly

  • Take any necessary steps to bring the reactor power/reactivity transient Booth Instructor respond as plant under control, including, but not limited to:

personnel and respond as necessary:

o Lockup of the Scoop Tube Lockup Respond that you will look at the MOORE controller logic for speed control and get

  • Determines IF the recirc pump speed mismatch will put them out of back to them soon. compliance with the LPCI Loop Select limits using STP 3.4.2-01, Daily Jet Pump Operability Test, Sect. 7.1, Recirc Pump Speed Mismatch Report that you will call in a licensed Check.

operator to take manual control of the locked up recirc scoop tube but it will be

  • TS SR 3.4.1.1 states that the speed of the faster pump shall be about an hour. 122% of the speed of the slower pump when operating at 69.4%

RTP.

Go along with what the crew wants to do, and tell them that ERT will take over the

  • Based on the calculation, the SRO will determine if he is in repairs of the B speed control problem. compliance with TS 3.4.1 Condition C. If not, then has 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to restore the mismatch within limits, or Trip one of the recirc pumps.

Examiner Note: Depending on when the

  • Plot the current position on the power to flow map.

scoop tube is locked up will determine .

whether or not the TS loop speed

  • IF the Recirc Flow is outside of the Mismatch limits, crew will discuss mismatch requirements for the Recirc how they will restore the mismatch to within its limits.

Pumps will be exceeded

  • Either raise the speed of the unlocked Recirc Pump to match the locked Recirc Pump. OR
  • Send a licensed operator to the Recirc M-G Set room and take manual control of the locked Recirc Pump and lower it to within the limits.

Event #4 (cont)

RO Determines that power is going up by itself, and that the B Recirc M-G speed controller is ramping up by itself. Takes the following actions to stop the run away:

page 13 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE

  • Lock the scoop tube of the B recirc M-G speed controller Acknowledge/Respond to 1C04A, C-5,
  • Enter AOP 255.2, Power/Reactivity Abnormal Change.

BOP Monitors balance of plant equipment and parameters EXAMINER NOTE: Continue to next event at examiners direction page 14 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE Event #5 Booth Instructor: When directed by the CREW RPS EPA Chief Examiner:

  • Recognizes 1/2 scram on B side - Multiple Annunciators including, Breaker Trip INSERT EVENT TRIGGER 5
  • Diagnoses Loss of RPS This inserts RP02B, which will trip the B RPS MG Set.

SRO

  • Enters AOP 358 Loss of RPS AC Power Booth Instructor: respond as plant
  • Directs operator to investigate the trip.

personnel and respond as necessary:

  • Refers to TS 3.3.8.2. Condition A - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to remove in service power supply (condition met with EPA tripped)
  • Enters TS 3.6.1.3 - 4 hr LCO for Primary Cont. Isolation Valves NOTE: The affected valves are already in their required (closed) position Role Play: When contacted by control due to the loss off RPS. The action has been met.

room to investigate, wait 2 minutes and report that:

  • Enters TRM 3.3.4 Condition A - for Reactor Water conductivity monitoring
  • The B RPS MG set is running.
  • Enters TS 3.4.5, Condition A - RCS Leak Detection Instrumentation,
  • B1 EPA has tripped free - no lights, since all DW sumps are incapable of being pumped.

smells bad (acrid), no fire or smoke

  • Directs transferring RPS to alternate power supply The electricians report that a fault is not
  • Contacts Duty Manager suspected on the RPS bus.

ROLE PLAY: If required, as the in-plant

  • Directs placing S583B, CV4371A Group 3 override switch in override open at 1C35. (Defeat 11) operator report that alternate RPS is aligned to 1B42 BOP
  • Places S583B, CV4371A Group 3 override switch in override open at 1C35.

Booth Instructor: Move to next event Transfers B RPS to alternate power supply per AOP 358 as follows:

when the operator is addressing the

  • IF: an alternate RPS power supply is available as indicated by Event #5 (cont) RWCU isolation observing B-MG or ALT XFMR white light ON at 1C17
  • THEN: place handswitch C71B-S1B RPS ALTERNATE POWER TRANSFER switch to B-MG OR ALT position as required and verify selected position white light remains on.

BOP (cont) page 15 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE

  • May open the Cleanup Demin Bypass, MO-2723 due to the loss of RWCU
  • Perform OI 358 RPS Appendix 4, RPS POWER SUPPLY TRANSFER HALF SCRAM RECOVERY CHECKLIST as follows.
  • At Panel 1C36, reset the fuel pool exhaust radiation monitor RIS-4131A[B].
  • At Panel 1C36, reset the carbon bed vault radiation monitor RM-4138.

RO Resets the 1/2 scram per ARP 1C-05B B2 - Step 4.1.b (OR P&L in OI 358) -

Resets the half scram when the failure has been repaired and/or the trip signal has cleared.

  • Turn the REACTOR SCRAM RESET switch C71A-S5 first to Group 1 and 4 [Group 2 and 3] then to Group 2 and 3 [Group 1 and 4] to reset the scram signal.

Verify the following:

  • The eight white SCRAM GROUP indicating lights are ON.

Booth Instructor: Move to next event

when the operator is addressing the RWCU isolation Momentarily press the PCIS DIV 1 RESET and DIV 2 RESET pushbutton switches A71B-S32 and A71B-S33 and verify the following annunciators are reset:

  • PCIS GROUP 1 ISOLATION INITIATED (1C05B, A-8)
  • PCIS GROUP 2 ISOLATION INITIATED (1C05B, B-8)
  • PCIS GROUP "4" ISOLATION INITIATED (1C05B, D-8)
  • PCIS GROUP "5" ISOLATION INITIATED (1C05B, E-8)

EXAMINER NOTE: Continue to next event when the 1/2 scram is reset and the operator is addressing the RWCU isolation page 16 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE Events 6, 7 & 8 Booth Instructor: When directed by the CREW Chief Examiner: Respond to Annunciator:

Unisolable INSERT EVENT TRIGGER: 13 HPCI leak in 1C07A-A-11, HVAC Panel 1C23 Trouble secondary This starts the HPCI Steam Line leak and 1C04B-B-4, Steam Leak detection High Ambient temperature containment, subsequent failure to isolate 1C23A & B (C-2) HPCI Room Cooler Outlet Air HI/LO Temp one ADS SRV Verify Event Trigger 17 goes active when Diagnoses HPCI failed to isolate on valid isolation signal fails to open GEMAC level reaches bottom peg. This inserts a loss of the S/U XFMR.

S/U XFMR Booth Instructor: respond as plant SRO Lockout, RCIC personnel and respond as necessary:

  • Directs ARP 1C23A & B (C-2) Actions Auto-Start
  • Directs dispatching an operator to the HPCI room to check cooler Failure Booth Instructor:
  • Directs checking back panel indication to verify temperatures VERIFY EVENT TRIGGER 15 goes active
  • Directs closing HPCI Steam Isolation Valves MO-2238 and MO-2239 3 minutes after the mode switch is placed
  • Enters EOP 3 - Secondary Containment - due to HPCI Rom in shutdown Temperature exceeding Max Norm Value of 175°F VERIFY EVENT TRIGGER 30 goes active
  • Directs operating available coolers in affected area when the EHC Pressure Set PB is depressed
  • Directs operating Main Plant Exhaust and Supply fans Booth Instructor:
  • Directs entry to EOP-1 When HPCI Room achieves Max Safe

Temperature, STOP HP05 from getting

  • Directs entry to IPOI-5 larger. Manual change HP05 to maintain HPCI above Max Safe.
  • Directs an RPV level Band of 170 to 211 inches (RCIC will be required because of SU XFMR Loss)
  • Directs Emergency Depressurization. Open 4 SRVs When Torus Room achieves Max Safe (CRITICAL TASK #2)

Temperature, STOP HP08 from getting larger. Manual change HP08 to maintain Torus above Max Safe. RO

  • Monitors critical plant parameters

Events #6 & 7

  • Takes IPOI 5 Reactor Scram Actions (cont.)
  • Initiates a backup manual reactor scram.

page 17 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE

  • Place THE MODE SWITCH in the SHUTDOWN position.
  • Verify all control rods fully inserted by one or both of the following means:
  • Verifies the Refuel One Rod Select Permissive:

o Position THE MODE SWITCH to REFUEL.

o Turn Rod Select Power off and then on.

o Verify the white Refuel Select Permissive light is lit.

o Return THE MODE SWITCH to SHUTDOWN.

  • On the FULL CORE DISPLAY, verify the green FULL IN light for each rod is on.

RO/BOP

  • Dispatches an operator to the HPCI room to check cooler
  • Checks back panel indication to verify temperatures
  • Maintains RPV level as directed using CRD and RCIC
  • Diagnoses RCIC auto start failure and places RCIC in service manually BOP
  • Attempts to close HPCI valves MO-2238 and MO-2239
  • Reports to CRS that the valves failed to close
  • Monitors reactor pressure and maintains in the band directed by the SRO When Directed attempts to open 4 ADS SRVs to emergency depressurize and recognizes that only 3 opened. Then takes action to open an additional LLS SRV (CRITICAL TASK #2)
  • Monitors and controls RPV level as he depressurization occurs Scenario Termination Criteria ED complete and RPV level >170 inches page 18 of 21

2011 NRC ILT Scenario #3 SCENARIO TIMELINE Event Classification SAE - FS1 - RCS Barrier Potential Loss and Primary Containment Barrier Loss

      • END OF SCENARIO ***

page 19 of 21

SEG Validation Checklist 2011 NRC Exam Scenario #3 Correct IC or plant status identified.

Shift turnover forms filled out (both CRS/OSM and NSOE) if required.

Additional documents are prepared (STPs, Work Orders, LCO Paperwork).

Tasks and Objectives have been verified to be correct.

Plant PRA initiating events, important equipment and important tasks are identified.

SOMS tags identified and included in setup instructions.

Special setup instructions identified; handswitch manipulations, procedure markups, alarm borders, 3D case available, computer points substituted, etc.

Setup files correctly called out.

Malfunction list is accurate.

Override list is accurate.

Remote function list is accurate.

Event triggers are accurate.

Time/Notes section is accurate and includes all reasonable cues that may be given to initiate an action. Cues are unambiguous and provide a definitive moment to take action.

Instructor Activity section is accurate and complete:

Actions are clearly defined for Booth or Floor instructor.

Role-playing is clearly noted.

The sequence of events is completely and concisely narrated even if it takes no instructor action.

Automatic actions that require verification are noted.

Reasonable alternate paths are considered and included.

Event trigger activation is distinguished from narrative text (Bold font)

Noun descriptions of actions that occur on event trigger initiation are complete, for example set ET 3 to TRUE which activates malfunction SW21C resulting in a loss of the C Well Water Pump.

Other simulator control actions are clearly distinguished from narrative text, for example after drywell temperature reaches 280 deg. F SNAP the simulator to IC 0.

Student and Instructor copies of worksheets or other training activities are verified correct and electronically attached to the file if appropriate.

Page 20 of 21

SEG Validation Checklist 2011 NRC Exam Scenario #3 Expected Student Response Section is accurate and complete:

Critical tasks are accurate and clearly identified. Probable critical tasks are also listed with logical connection to the scenario; for example If the crew fails to get all the rods inserted before ED the critical task becomes (N/A as appropriate)

Tasks are clearly noted and properly numbered as appropriate.

Knowledge objectives are clearly noted and properly numbered as appropriate.

Expected as well as probable student responses are listed with logical connection to the scenario. (N/A as appropriate)

Actions are appropriately delineated by position(s); OSM, CRS, STA, RO, NSOE, Fire Brigade Leader, At the Controls Operator, etcetera. (N/A as appropriate)

Success paths are procedurally driven unless specific training not requiring procedures is desired and delineated. Procedural discrepancies are identified and corrected before training is given.

Responses for all communications to simulated personnel outside the Control Room are included, based on procedural guidance and standard operating practices.

Actions are listed using a logical order; by position and chronology. (N/A as appropriate)

Operating Experience, Human Performance Tools and Operator Fundamentals topics are included when appropriate.

Crew Performance Criteria follow the same chronology as the student responses, are complete and accurate. (For ESGs only)

For Walkthrough and Training Mode Scenarios with pre-planned pauses, sufficient information is presented to allow the instructor to meet the goal of the training.

Turnover information (as required) is correct:

Day and shift are appropriate.

Weather conditions do not conflict with malfunctions.

Power levels are correct.

Thermal limit problems and power evolutions are realistic and include a reason for any downpower.

Existing LCOs include start date, remaining time and actions.

Plant Risk Assessment (CDF and Color).

STPs are appropriate for day and shift.

Core Damage Frequency has been properly calculated and listed to 3 decimal places.

Maintenance is realistic for plant conditions.

Comments, evolutions, problems, etc, includes extra personnel (licensed/non-licensed if necessary), any condition that affects the flow of the scenario and any condition that does not fit in another category.

SME/Instructor Date SME/Instructor Date Page 21 of 21

SEG Validation Checklist 2011 NRC Exam Scenario #3 Crew: Instructors:

OSM ____________________________ Booth ________________________________

CRS ____________________________ Floor __________________________

STA __________________________________ Extra ________________________________

1C05 ____________________________

1C03 ____________________________

BOP ____________________________

Crew Comment:

Resolution:

Crew Comment:

Resolution:

NOTE: Following approval of SEGs, this page may be discarded.

SEG Validation Checklist 2011 NRC Exam Scenario #3 Crew Comment:

Resolution:

Crew Comment:

Resolution:

Crew Comment:

Resolution:

NOTE: Following approval of SEGs, this page may be discarded.

SEG Validation Checklist 2011 NRC Exam Scenario #3

SEG Validation Checklist 2011 NRC Exam Scenario #3

QF-1030-19 Rev. 12 EXAMINATION SCENARIO GUIDE (ESG)

SITE: DAEC MSIV TRIP/CLOSE FUNCTIONAL TEST, MSIV FAILS CLOSED, LOWER POWER WITH CONTROL RODS, APRM UPSCALE, RHR PUMP START/FAILS TO TRIP ON OVERCURRENT, LOSS OF 4160V BUS 1A1, LOSS ESG NRC 11-04 REV 0 OF CONDENSATE, RPS PB FAILURE, LOOP, SBDG FAIL TO START, SMALL RECIRC LEAK, HPCI/RCIC FAILURES PROGRAM: OPERATIONS #:

COURSE: INITIAL LICENSED OPERATOR #:

TOTAL TIME: 90 MINUTES Developed by:

Instructor Date Validated by:

SME/Instructor Date Reviewed by:

Operations Manager Date Approved by:

Training Supervisor-Operations Date Page 1 of 23

2011 NRC ILT Scenario #4 GUIDE REQUIREMENTS Goal of The goal of this scenario is to evaluate ILT students during the NRC Training: Exam with 3 man crew.

Learning There are no formal learning objectives Objectives:

Prerequisites: None Simulator Simulator Booth Instructor Training Phone Talker Resources:

Simulator Floor Instructor

References:

None None Commitments:

Evaluation Dynamic Simulator Method:

Operating None Experience:

Initiating Event with Core Damage Frequency:

N/A due to exam security Important Components:

Related PRA N/A due to exam security Information:

Important Operator Actions with Task Number:

N/A due to exam security Page 2 of 23

2011 NRC ILT Scenario #4 SCENARIO

SUMMARY

The scenario begins with the reactor at ~60% power and a shutdown in progress. The crew will perform the MSIV Trip/Close Functional Test. During the test, one MSIV will fail closed. The SRO will address Technical Specifications (TS) for the valve failure.

The crew will continue the shutdown by inserting control rods. While moving control rods, an APRM will fail upscale and the crew will take procedural actions to bypass the APRM and reset the 1/2 scram. Then, a RHR pump will spuriously start, with indications of pump overload on the motor ammeter. The pump will fail to trip. The SRO will address TS and direct removing the pump from service. Once TS are addressed, a loss of Non Essential 4160v Bus 1A1 will occur.

The crew will take actions IAW the AOP and address the resultant Recirc Pump trip and also swap bus power supplies. The SRO will address TS for single loop operation.

Then, the condensate pumps will trip causing a loss of Feedwater. The crew will insert a manual scram and the SRO will enter IPOI-5 due to the scram and EOP-1 due to low RPV level. After the initial scram actions are performed, a LOOP will occur with a small drywell leak.

The output breaker on the A SBDG will fail to close and cannot be closed. The B SBDG will fail to start and must be started manually to power an Essential Bus (CRITICAL TASK 1.0). As the operators attempt to recover RPV level, RCIC inverter will fail, which prevents RCIC from injecting and the HPCI flow controller will fail in AUTOMATIC, so it must be operated in manual to permit level recovery BEFORE an Emergency Depressurization is required (CRITICAL TASK 2.0).

The scenario may be terminated when the B essential bus is recovered and RPV level is

>170inches.

Page 3 of 23

2011 NRC ILT Scenario #4 SCENARIO OUTLINE:

BOOTH INSTRUCTOR ACTIONS 1 SIMULATOR SET UP: (perform set up per the Simulator Setup Checklist, including entering actions items per the Simulator Input Summary.)

Start Sim View / Data Capture Program for EXAM ONLY 1.1 General Instructions

a. Restore the IC for ILT Scenario 4 from the Thumb Drive that it is stored on.
b. If the thumb drive is not available, then reset to IC 13, Raise power using control rods to approx. 59% and set the Malfunctions, Remotes, Overrides, and Triggers as per the tables below.
c. Verify Pull Sheet setup matches current step and rod position (BOL pull sheet)
d. Place SPMET1 on a computer terminal (IAW AOP 903).
e. Mark up the following procedures:
  • AOP 903, marked up so all actions are complete for sever
  • IPOI-3, Section 5.0 Step (8)
  • OI 646, marked up to where the plant is
  • STP 3.3.1.1 MSIV Trip/Close Functional Test 1.2 EVENT TRIGGER DEFINITIONS:

Trigger Trigger Logic Statement Trigger Word Description No.

1 ZDIMSHS4418B(1) >= 1 When CV 4418 is taken to test 10 RPDIS1SHUTDOWN(1) >= 1 When Mode Switch taken to shutdown 12 ZDIDGDG2(4) >= 1 When B SBDG started 14 RCNT >= 400 RCIC Turbine at 400 rpm 16 HPNT >= 400 HPCI Turbine at 400 rpm 22 ZDIRHHS2014(1) >= 1 A RHR Hand Switch Taken to Stop Schedule Files Needed:

Setup schedule file to Delete:

  • Malfunction AN1C03B(2) - (A-02) A RHR Pump 1P229A Trip OR Motor Overload
  • Override AO-RH 1P-229A RHR Pump Ammeter when EVENT TRIGGER 22 goes TRUE.

Page 4 of 23

2011 NRC ILT Scenario #4

1.3 MALFUNCTIONS

Time Malf. No. Malfunction Title Delay Ramp ET Initial Final Value Value Setup DG02A 1G31 A Diesel Gen Breaker Auto- Active Active Close Circuit Failure in Auto-DG A Setup STDG02 Trip Override-B SBDG 1G21 Fails Active Active to start As Dir ED08A 4.16kv/480V Bus Fault-Bus-1A1 5 Inactive Active As Dir NM08C APRM Channel Fails-APRM C 8 3 AS IS 100 seconds As Dir FW02B Condensate Pump Trip- Pump B 7 Inactive Active As Dir RP05A RPS Scram Circuit (ATWS) Auto 9 Inactive Active Scram Failure As Dir ED01A Loss of Off Site Power Sources - 1 minute 10 Inactive Active BKR M As Dir ED01B Loss of Off Site Power Sources - 1 minute 10 Inactive Active BKR J As Dir ED01C Loss of Off Site Power Sources - 1 minute 10 Inactive Active BKR K As Dir RR15B Recirc Loop RUPT Design Basis 4 minutes 12 0 10 LOCA-LOOP B As Dir RC05 RCIC Inverter trouble 1 minute 14 Inactive Active As Dir HP03 HPCI Flow Controller fails 1 minute 16 0 0 As Dir AN1C03B(2) (A-02) A RHR Pump 1P229A Trip 18 Crywolf ON OR Motor Overload NOTE: Delete this on schedule file when ET 22 True OVERRIDES:

Time Override No. Override Title Delay Ramp ET Initial Final Value Value Setup DI-DG-002 152-311 DSL GEN 1G31 Output NAT NAT Breaker Setup DI-RP-029 C71AS3B Reactor manual Scram OFF OFF System B Setup DI-RP-028 C71AS3A Reactor manual Scram OFF OFF System A As Dir DI-MS-058 HS-4418B C INBD MSIV TST CV-4418 1 NORM TEST As Dir DI-RH-092 HS-2014 RHR Pump 1P-229A 18 NASP START NOTE: Delete 2 seconds after inserting As Dir AO-RH-01 1P-229A RHR Pump Ammeter 1 sec 18 0 100 NOTE: Delete this on schedule file when ET 22 True Page 5 of 23

2011 NRC ILT Scenario #4 1.5 REMOTE FUNCTIONS:

Time Remote Remote Title Delay Ramp ET Initial Final No. Value Value FLOOR INSTRUCTOR ACTIONS Simulator Pre-brief:

2.1 Individual position assignments 2.2 Simulator training changes since last module (N/A) 2.3 Simulator hardware and software modifications/problems that may impact training Page 6 of 23

2011 NRC ILT Scenario #4 TURNOVER INFORMATION Day of week and shift Today Day Shift Weather conditions Hot, Humid A Severe Thunderstorm Watch is in effect for the next 31/2 hours. All AOP 903 actions are complete.

(Plant power levels) 60%

MWT 1153 MWE 358 CORE FLOW 38.2 mlbm/hr Thermal Limit Problems/Power Evolutions Plant Risk Status CDF Baseline Color Green Existing LCOs, date of next surveillance STPs in progress or major maintenance

Equipment to be taken out of or returned to service this shift/maintenance on major plant equipment Comments, evolutions, problems, core damage frequency, etc.

Plant shutdown for refueling outage in progress Currently in IPOI-3, Section 5.0 Step (8)

Step 31 of the Pull Sheet, with Rods at position 30 Perform STP 3.3.1.1 MSIV Function Test Continue lowering power as directed with control rods Secure the first Feedwater and Condensate pumps at 50% power Containment purge will be commenced after the first condensate and feed pump are secured Page 7 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Shift Turnover COMPLETE TURNOVER: Get familiar with plant conditions.

  • Provide Shift Turnovers to the SRO
  • SRO will provide beginning of shift brief to coordinate the tasks that and ROs.

were identified on the shift turnover.

a. Review applicable current Plant Status
b. Review relevant At-Power Risk status
c. Review current LCOs not met and Action Requirements
d. Verify crew performs walk down of control boards and reviews turnover checklists EXAMINER NOTE: Continue to next event at examiners direction page 8 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Events 1 & 2 Booth Operator: SRO

  • Briefs Crew and verifies the prerequisites are met MSIV trip
  • Directs the BOP to perform STP 3.3.1.1-17 MSIV trip closure closure functional test functional test Role Play: It will be necessary to role play STP 3.3.1.1-17 the personnel in the backpanels for BOP verifying the relay contacts are open at INBD MSIV 1C15 and 1C17. Reviews STP, then performs the following:

Failure FUNCTIONAL TEST OF A MSL MSIVs (CV-4412 and CV-4413)

  • Verifies RPS Trip channel A1 - B Line MSIV 90% open relay is energized at 1C15
  • Verifies RPS Trip channel B1 - C Line MSIV 90% open relay is energized at 1C17
  • At 1C15, verify relay C71A-K11A contacts are open Booth Operator:
  • Ensures station personal are stationed at 1C15 and 1C17 for the If asked whether the relays operated STP.

properly for the C INBD MSIV, state that

  • At 1C03, take A INBD MSIV TEST CV-4412 handswitch HS-4412B the relays did operate properly. to TEST and release.
  • Verifies CV-4412 goes partially closed, and then opens
  • Contacts 1C15 person, and verifies:

o Relay coil de-energized and then re-energized o Contact 1-2 and 2-4 opened and then closed

  • At 1C04, take A OUTBD MSIV CV-4413 handswitch HS-4413B to TEST and release. Notices the A OUTBD MSIV goes closed (slowly)
  • Verifies CV-4413 goes partially closed, and then opens BOP (cont)
  • Contacts 1C15 & 1C17 person, and verifies:

page 9 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE TIME/NOTES INSTRUCTOR ACTIVITY EXPECTED STUDENT RESPONSE Events 1 & 2 o Relay coil de-energized and then re-energized (cont) FUNCTIONAL TEST OF C MSL MSIVs (CV-4418 and CV-4419)

  • Verifies RPS Trip channel A2 - D Line MSIV 90% open relay is energized at 1C15
  • Verifies RPS Trip channel B1 - A Line MSIV 90% open relay is energized at 1C17
  • At 1C17, verify relay C71A-K11B contacts are open
  • Ensures station personal are stationed at 1C15 and 1C17 for the STP.
  • At 1C03, take C INBD MSIV TEST CV-4418 handswitch HS-4418B Role Play: As Duty Manager, to TEST and release.

Acknowledge problem with MSIV and tell

  • Verifies CV-4418 goes partially closed, and then opens SRO to continue with the power reduction
  • Notifies the CRS the C INBD MSIV is SHUT and Event Response Team will CRS investigate.
  • Refers to TS and determines:
  • TS 3.6.1.3 condition A (isolate affected flowpath, verify isolated) and an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> LCO, re-verify 31 days
  • May order the INBD MSIV CLOSED, may decide to wait for management guidance.
  • Refers to IPOI-3 Section 6.0 for operation with one main steam line isolated (or OI 683)
  • May enter AOP 255.2
  • Contacts Duty Manager EXAMINER NOTE: Continue to next event at examiners direction page 10 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #3 Booth Instructor: respond as plant SRO personnel and respond as necessary: Directs RO to lower reactor power with control rods per RE guidance Insert control rods to continue Examiner Note: One individual will stand RO shutdown in as a Reactivity Management SRO. This

  • Using RE guidance and Pull Sheet at Step 31, inserts control rods individual will provide NO specific direction
  • Monitors NI indications for response
  • Monitors reactor level and pressure BOP Monitors balance of plant equipment EXAMINER NOTE: Continue to next event at examiners direction page 11 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #4 Booth Instructor: At the direction of CREW C APRM evaluator: Responds to the following Annunciators:

Upscale, 1/2 INSERT EVENT TRIGGER 3. 1C05A-A-2, A RPS AUTO SCRAM Scram This inserts the C APRM Upscale. 1C05A-B-2, APRM UPSCALE TRIP OR INOP 1C05A-C-2, APRM UPSCALE Booth Instructor: respond as plant personnel and respond as necessary: SRO Directs bypassing APRM Booth Instructor: Directs reset of 1/2 scram After the 1/2 scram is reset:: Discusses Technical Specifications - Briefly in TS 3.3.1.1. Condition A INSERT EVENT TRIGGER 9. (RPS Instrumentation) and TRM 3.3.2. Condition A (Control Rod Block This inserts the Auto Scram Failure Instrumentation) while unbypassing A APRM until C APRM is bypassed.

RO/BOP Bypasses the APRM IAW OI 878.4 as follows:

(1) If an APRM is currently bypassed, perform the following for the bypassed APRM, otherwise N/A this step:

(a) Verify the APRM channel Mode Selector Switch on Panel 1C37 is in OPERATE.

(b) Verify the APRM upscale, inoperative, and if greater than 5%

reactor power, downscale trips on Panel 1C37 are reset.

(c) Verify the IRM/APRM recorders on Panel 1C05 indicate approximately the same average power for the bypassed APRM as they do for the other APRM channels in operation.

(d) Place the APRM BYPASS switch C51B-S3 or C51B-S6 on Panel Event #4 (cont) 1C05 in the neutral (unbypassed) position.

RO (cont) page 12 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE (e) Observe that the bypass light on Panel 1C05 and/or that the bypass light on Panel 1C37 is/are OFF.

(2) Verify the two remaining APRM channels in the RPS trip system are operable and not BYPASSED, otherwise comply with Tech Specs for inoperable RPS instrumentation.

(3) Place the APRM BYPASS switch C51B-S3 (C51B-S6) on Panel 1C05 in the A, C, or E (B, D, or F) position for the channel to be bypassed.

(4) Observe that the bypass lights for the bypassed channel on Panel 1C37 and/or Panel 1C05 is/are ON.

Resets the 1/2 scram IAW OI 358 as follows:

(1) Turn the REACTOR SCRAM RESET switch C71A-S5 first to Group 1 and 4 [Group 2 and 3] then to Group 2 and 3 [Group 1 and 4] to reset the scram signal.

Verify the following:

(2) The eight white SCRAM GROUP indicating lights are ON.

(3) "A" RPS MANUAL SCRAM (1C05A, A-3) annunciator is reset.

(4) "B" RPS MANUAL SCRAM (1C05B, A-3) annunciator is reset.

(5) Annunciator 1C05A, E-4 is reset.

(6) Annunciator 1C05B, E-4 is reset.

BOP Monitors balance of plant equipment EXAMINER NOTE: Continue to next event when the 1/2 scram is reset page 13 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #5 Booth Instructor: When directed by the Crew A RHR Pump Chief Examiner: Diagnoses A RHR Pump start.

Spurious start / Insert Event Trigger 18 Ann: 1C03A (B-6) ADS Core Spray RHR Pump Running Permissive Fails to trip on This starts the A RHR Pump Ann: 1C03B (A-2) A RHR Pump 1P-229A Trip Or Motor Overload overcurrent SRO Role Play:

  • When informed of RHR pump start and after assessing the situation, When contacted to investigate, directs the BOP to stop the pump acknowledge request as 2nd Assistant and
  • Directs contacting 2nd Assistant and Aux Operator to investigate Aux Operator.
  • Enters TS LCO 3.5.1 Condition A. - 30 days to restore RHR pump to SE Corner Room - nothing abnormal, no operable status one in the room.

RO 1A3 Switchgear Room - nothing abnormal, no one in the room.

  • Monitors reactor power, level and pressure BOP
  • Recognizes the A RHR pump is running and amps are high and pump should have tripped
  • Reports condition to SRO
  • As directed, secures the RHR pump EXAMINER NOTE: Continue to next event at examiners direction page 14 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #6 Booth Instructor: When directed by the CREW LOSS OF Chief Examiner: Responds to Annunciator 4160V BUS INSERT EVENT TRIGGER 5 1C08A A2 - BUS 1A1 LOCKOUT TRIP OR LOSS OF VOLTAGE 1A1 This inserts the Bus 1A1 Lockout. SRO

  • Directs actions IAW ARP Role Play: When contacted to investigate
  • Enters AOP 304.1 - Loss of Non essential Bus 1A1 loss, Report back in 5 minutes that the bus has a lockout and BKR 1A102 has
  • Enters AOP 255.2 - Power/reactivity Abnormal Power Change an overcurrent flag
  • Reviews Power/Flow Map and determines NOT in the Buffer or Exclusion Region Booth Instructor: respond as plant
  • May Enter AOP 264 - Loss of Recirc Pump personnel and respond as necessary:
  • Contacts Duty Manager
  • Refers to TS 3.4.1 Condition D - single loop surveillance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RO
  • Monitors critical plant parameters
  • Responds to the Recirc Pump trip IAW AOP 264
  • For the Recirc Pump that tripped, performs the following:
  • Verify open A[B] RECIRC PUMP DISCH BYP valve MO-4629[4630].
  • Close A[B] RECIRC PUMP DISCHARGE valve MO-4627[4628].
  • After 5 minutes, reopen A[B] RECIRC PUMP DISCHARGE valve MO-4627[4628] (unless the A[B] Pump has to be isolated).

BOP For LOSS of 1A1 ONLY, perform the following:

Crosstie 1B1 and 1B2 by performing the following:

  • Momentarily place control switch FEEDER BREAKER 1B101 XFMR 1X11 to LC 1B1 to the TRIP position.

page 15 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE

  • Momentarily place control switch TIE BREAKER 1B107 LC 1B1/1B2 in the CLOSE position.

Crosstie 1B5 and 1B6 by performing the following:

  • Momentarily place control switch FEEDER BREAKER 1B501 XFMR 1X51 to LC 1B5 to the TRIP position.
  • Momentarily place control switch TIE BREAKER 1B505 LC 1B5/1B6 in the CLOSE position.
  • Place BUS 1A1 TRANSFER switch in MANUAL.
  • Verify Offgas Closed Cooling Water Pump 1P-105A[B] in service.
  • Start Offgas Glycol Pump 1P-243A[B].

EXAMINER NOTE: When Duty Manager is contacted to discuss event, go to next event page 16 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #7 Booth Instructor: When directed by the SRO:

Condensate Chief Examiner:

  • Identifies the loss of FW Pumps Trip, Insert Event Trigger 7
  • Enters EOP 1 due to <170 RPV water level pump
  • Orders RPV level and pressure be controlled IAW EOP 1
  • Directs Defeat 11 to maximize drywell cooling Booth Instructor:

RO:

When the Mode Switch is taken to shutdown and after a 1 minute delay,

  • Identifies the loss of FW Event Trigger 10 will become active. This
  • SCRAMS the reactor when directed and carries out IPOI-5 actions results in a LOOP
  • Scrams the reactor using both RPS Pushbuttons
  • Places Mode Switch to Shutdown
  • Verifies all control rods fully inserted by one or both of the following Examiner Note: means:

1 minute after the Mode switch is placed in 1. Verify the Refuel One Rod Select Permissive:

Shutdown, a LOOP will occur. Actions for the LOOP are described in the next event.

  • Position THE MODE SWITCH to REFUEL.
  • Turn Rod Select Power off and then on.
  • Verify the white Refuel Select Permissive light is lit.
  • Return THE MODE SWITCH to SHUTDOWN.
2. On the FULL CORE DISPLAY, verify the green FULL IN light for each rod is on.

BOP:

Event #7 (cont)

  • Sends field operator to investigate condensate pump trips
  • Monitors BOP equipment and containment parameters
  • If Directed, Implements Defeat 11 to maximize drywell cooling as follows:

page 17 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE

  • At Panel 1C35, place CV-4371A GROUP 3 OVERRIDE keylock switch S583B in OVERRIDE OPEN position and confirm amber light is ON.
  • Confirm CV-4371A opens by observing valve position indicating lights on 1C35 (red light is ON and the green light is OFF).

EXAMINER NOTE: LOOP with SBDG Complications / LOCA actions are in next section page 18 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Event #8 & 9 Booth Instructor: LOSS OF POWER EVENT LOOP, A DG Event Trigger 10 will be active 1 minute Crew Output BKR after the mode switch was taken to Responds to Loss of Offsite Power Indications FAILS and will shutdown in the previous event not close. B DG This will result in a LOOP Fails To Start SRO but CAN be

  • Directs Reactor pressure control using SRVs manually Booth Instructor:
  • Enters AOP 304.1 LOSS OF 4160V NON-ESSENTIAL ELECTRICAL started. After the B EDG is started, Event Trigger POWER 12 will go Active. This will cause the Recirc leak to begin to ramp in on a 4
  • Enters AOP 301 LOSS OF ESSENTIAL ELECTRICAL POWER Small Recirc Directs starting the B DG and verifying it loads the Bus minute ramp.

Leak (CRITICAL TASK #1)

Examiner Note:

  • Directs RPV level band 170 to 211 using available systems RCIC Inverter Failure, HPCI The Recirc Leak will begin to occur after Ctrl Failure in the B EDG is started. RO Auto Provides RPV level and pressure status BOP Role Play: If directed, acknowledge
  • May report MSIV closure (Group I Isolation) request to close the A DG output breaker locally (you will not be able to close the
  • Diagnoses that the A DG started but did not pick up the bus A SBDG output breaker.)
  • Diagnoses that the A DG is running with no ESW flow and places the A DG in P-T-L.
  • Diagnoses that the B DG failed to start STARTS B DG and verifies it loads BUS 1A4 (CRITICAL TASK #1)

RECIRC LEAK EVENT and RPV LEVEL RECOVERY CREW:

Responds to annunciator 1C05B-B1 - Primary Containment Pressure Hi/Lo SRO:

page 19 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE

  • Directs operators to monitor containment parameters
  • Enters EOP RPV Control due to RPV low level (was enetered earlier when the scram occurred)

Directs Reactor Water level band of 170 to 211 using available systems - (HPCI) (CRITICAL TASK #2)

  • Directs Defeat 4 - This results DW Cooling Fans in FAST
  • Directs initiation of Torus Spray prior to Torus Pressure exceeding 11 psig
  • IF Torus Pressure exceeds 11 psig, directs initiation of Drywell Spray.

RO:

  • If directed, performs Defeat 4 to maximize drywell cooling
  • Places Torus Spray in service as follows:
1. Place keylock HS-2005[HS-1932] Outboard Torus Cooling/Spray Valve handswitch in OPEN and verify valve opening
2. Throttle open MO-2006[MO-1933], Torus Spray Valve
  • Recognizes RCIC Failure and reports status to CRS Diagnoses HPCI controller failure and takes manual control of HPCI to restore RPV level to >170 (CRITICAL TASK #2) page 20 of 23

2009 NRC ILT Scenario #4 SCENARIO TIMELINE Scenario Termination Criteria RPV level recovered to >170 Alert - FA1 - Drywell pressure 2.0 psig, SA5.1 - single AC Power Source

      • END OF SCENARIO ***

page 21 of 23

SEG Validation Checklist Correct IC or plant status identified.

Shift turnover forms filled out (both CRS/OSM and NSOE) if required.

Additional documents are prepared (STPs, Work Orders, LCO Paperwork).

Tasks and Objectives have been verified to be correct.

Plant PRA initiating events, important equipment and important tasks are identified.

SOMS tags identified and included in setup instructions.

Special setup instructions identified; handswitch manipulations, procedure markups, alarm borders, 3D case available, computer points substituted, etc.

Setup files correctly called out.

Malfunction list is accurate.

Override list is accurate.

Remote function list is accurate.

Event triggers are accurate.

Time/Notes section is accurate and includes all reasonable cues that may be given to initiate an action. Cues are unambiguous and provide a definitive moment to take action.

Instructor Activity section is accurate and complete:

Actions are clearly defined for Booth or Floor instructor.

Role-playing is clearly noted.

The sequence of events is completely and concisely narrated even if it takes no instructor action.

Automatic actions that require verification are noted.

Reasonable alternate paths are considered and included.

Event trigger activation is distinguished from narrative text (Bold font)

Noun descriptions of actions that occur on event trigger initiation are complete, for example set ET 3 to TRUE which activates malfunction SW21C resulting in a loss of the C Well Water Pump.

Other simulator control actions are clearly distinguished from narrative text, for example after drywell temperature reaches 280 deg. F SNAP the simulator to IC 0.

Student and Instructor copies of worksheets or other training activities are verified correct and electronically attached to the file if appropriate.

Page 22 of 23

SEG Validation Checklist Expected Student Response Section is accurate and complete:

Critical tasks are accurate and clearly identified. Probable critical tasks are also listed with logical connection to the scenario; for example If the crew fails to get all the rods inserted before ED the critical task becomes (N/A as appropriate)

Tasks are clearly noted and properly numbered as appropriate.

Knowledge objectives are clearly noted and properly numbered as appropriate.

Expected as well as probable student responses are listed with logical connection to the scenario. (N/A as appropriate)

Actions are appropriately delineated by position(s); OSM, CRS, STA, RO, NSOE, Fire Brigade Leader, At the Controls Operator, etcetera. (N/A as appropriate)

Success paths are procedurally driven unless specific training not requiring procedures is desired and delineated. Procedural discrepancies are identified and corrected before training is given.

Responses for all communications to simulated personnel outside the Control Room are included, based on procedural guidance and standard operating practices.

Actions are listed using a logical order; by position and chronology. (N/A as appropriate)

Operating Experience, Human Performance Tools and Operator Fundamentals topics are included when appropriate.

Crew Performance Criteria follow the same chronology as the student responses, are complete and accurate. (For ESGs only)

For Walkthrough and Training Mode Scenarios with pre-planned pauses, sufficient information is presented to allow the instructor to meet the goal of the training.

Turnover information (as required) is correct:

Day and shift are appropriate.

Weather conditions do not conflict with malfunctions.

Power levels are correct.

Thermal limit problems and power evolutions are realistic and include a reason for any downpower.

Existing LCOs include start date, remaining time and actions.

Plant Risk Assessment (CDF and Color).

STPs are appropriate for day and shift.

Core Damage Frequency has been properly calculated and listed to 3 decimal places.

Maintenance is realistic for plant conditions.

Comments, evolutions, problems, etc, includes extra personnel (licensed/non-licensed if necessary), any condition that affects the flow of the scenario and any condition that does not fit in another category.

SME/Instructor Date SME/Instructor Date Page 23 of 23

SEG Validation Checklist Crew: Instructors:

OSM ____________________________ Booth ________________________________

CRS ____________________________ Floor __________________________

STA __________________________________ Extra ________________________________

1C05 ____________________________

1C03 ____________________________

BOP ____________________________

Crew Comment:

Resolution:

Crew Comment:

Resolution:

NOTE: Following approval of SEGs, this page may be discarded.

SEG Validation Checklist Crew Comment:

Resolution:

Crew Comment:

Resolution:

Crew Comment:

Resolution:

NOTE: Following approval of SEGs, this page may be discarded.