Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
October 13, 2011
Mr. Jack M. Davis
Senior Vice President and
Chief Nuclear Officer
Detroit Edison Company
Fermi 2 - 210 NOC
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2 - INFORMATION REQUEST FOR AN NRC
TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59)
BASELINE INSPECTION 05000341/2012-007(DRS)
Dear Mr. Davis:
On January 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
baseline inspection at the Fermi Power Plant, Unit 2. This inspection will be performed in
accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The onsite portion of
the inspection will take place on January 17 - 20 and January 30 thru February 3, 2012.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be made available via compact disc and
delivered to the regional office no later than November 18, 2011. The inspection team will
review this information by December 9, 2011, and will request specific items that should be
provided for review in the regional office by January 4, 2012.
The second group of requested documents contains additional items that the team will review,
or need access to, during the inspection. Certain documents contained within this group, i.e.,
Item (1), will be requested for review in the regional office prior to the inspection by January 4,
2012, as identified above. The remaining documents should be available by the first day of the
onsite inspection, January 17, 2012.
The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. The remaining documents in group three should be
available by the first day of onsite inspection, January 17, 2011. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
J. Davis -2-
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
contact for this inspection is Mr. Joe Pendergast of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9810 or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA by R. A. Langstaff for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-341
License Nos. NPF-43
Enclosure: Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via ListServ
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Inspection Report: 05000341/2012-007
Inspection Dates: January 17 - 20 and January 30 thru February 3, 2012
Inspection Procedure: IP 71111.17, Evaluations of Changes, Tests, or Experiments and
Permanent Plant Modifications
Lead Inspector: Alan Dahbur
(630) 829-9810
Alan.Dahbur@nrc.gov
I. Information Requested for in-Office Preparation Week.
The following information is requested by November 18, 2011, or sooner, to facilitate
the selection of specific items that will be reviewed during the onsite inspection week.
The inspection team will select specific items from the information requested below and
submit a list to your staff by December 9, 2011. We will request that certain items be
made available to the regional office prior to the inspection by January 4, 2012.
We request that the remaining items selected from the lists be available and ready for
review on the first day of inspection. All requested information should identify the
associated system and cover the time frame from the receipt of information for the last
inspection on June 19, 2009, to the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of each CD submitted (i.e., one for each inspector). The
preferred file format is a searchable pdf file. The CDs should be indexed and hyper-
linked to facilitate ease of use, if possible. If you have any questions regarding this
information, please call the inspection team leader as soon as possible.
1. List of permanent plant modifications to systems, structures, or components that
are field work complete. (For the purpose of this inspection, permanent plant
modifications include permanent: plant changes, design changes, set point
changes, equivalency evaluations, suitability analyses, and commercial grade
dedications.)
The list should contain the number of each document, the title, the revision
(or date), and the affected system. In addition to the list, please provide a
description of each modification and a list of associated calculations and affected
procedures.
2. List of all 10 CFR 50.59 completed evaluations involving (a) calculations,
(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine
operating configurations, or (e) departures in methods of analyses. This list
should include 50.59 evaluations for the following:
1 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
a. Changes that have been made under the provisions of 10 CFR 50.59
that have been updated in accordance with 10 CFR 50.71(e)(4) since
February 23, 2007;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a
brief description of the change, and the corresponding number and type of
the affected document (i.e., the modification or procedure to which the
evaluation applies). The list should NOT include any evaluations in
which prior NRC approval was sought and obtained.
3. A list of all 10 CFR 50.59 changes that have been screened out as not requiring a
full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to
the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
4. A list of any modifications, procedure revisions, or UFSAR changes where it was
determined that 10 CFR 50.59 did not apply.
5. A list of calculation changes that have been issued for use.
6. A list of corrective action documents (open and closed) that address permanent
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
documents should also include the corrective action documents associated with
the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
7. Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
screenings, and UFSAR updates.
8. UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
copies of the complete submittal.
2 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
9. Copy of the UFSAR change log or a synopsis of the changes. This
should include all of the changes made to the UFSAR that were
incorporated in the last 10 CFR 50.71(e)(4) submittal.
10. Electronic copy of the UFSAR and technical specifications, if available.
11. Name(s) and phone numbers for the regulatory and technical contacts.
12. Current management and engineering organizational chart.
II. Information Requested to be Available Prior to Inspection (Request will be
made by December 9, 2011, for availability of documents by January 4,
2012), or on First Day of Inspection (January 17, 2012).
1. Copies of all selected items from Section I. This includes copies of
associated documents such as calculations, post-modification test
packages, 10 CFR 50.59 evaluations, or screenings, and any corrective
action documents.
2. Copies of these documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained
access to them.
a. Updated Final Safety Analysis Report, if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
3. Please ensure that other supporting documents for the selected items
have been located and are readily retrievable as the inspection team will
likely be requesting these documents during the inspection. Examples of
supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
3 Enclosure
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
4. Assessment and Corrective Actions:
a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or
self-assessment; and
b. Corrective action documents (e.g., condition reports, including status
of corrective actions) generate as a result of the most recent
MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.
III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team members
and the status/resolution of the information requested (provide daily
during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the
inspection team leader.
4 Enclosure
J. Davis -2-
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
contact for this inspection is Mr. Joe Pendergast of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9810 or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
/RA by R. A. Langstaff for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-341
License Nos. NPF-43
Enclosure: Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 101311 Fermi Mod 50 59 RFI
AKD.docx
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII
NAME ADahbur:ls RLangstaff for RDaley
DATE 10/13/11 10/13/11
OFFICIAL RECORD COPY
Letter to Mr. Jack M. Davis from Mr. Robert C. Daley dated October 13, 2011.
SUBJECT: FERMI POWER PLANT, UNIT 2 - INFORMATION REQUEST FOR
AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR
50.59 (MOD/50.59) BASELINE INSPECTION 05000341/2012-007(DRS)
DISTRIBUTION:
RidsNrrDorlLpl3-1 Resource
RidsNrrPMFermi2 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
ROPreports Resource