MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Thursday, May 19, 2011 8:39 AM To: 'thomas.l.breene@dom.com'; 'jack.gazala@dom.com' Cc: Bedi, Gurjendra; McMurtray, Anthony
Subject:
ME4722 - Sampling Schemes Discussion Reviewer Bedi has responded to the Kewaunee understanding of the selection process for Large Bore Snubbers for testing:
========== begin NRC understanding ==================
NRC staff has the following understanding of the same text of OMa-1988, Section 3.2.3.1.a as you quoted:
For the first sample lot tested, 10% of the snubbers in the general population shall be selected. As far as practical, this sample selected for testing shall include the various designs, configurations, operating environments, range or sizes, and capacity of snubbers, etc. The first sample lots tested shall be a composite based on the ratio of each particular category to the total numbers of snubbers installed in the plant. Sample lot selection from the representative categories of snubbers shall be random.
As acknowledged, KPS has a total of 99 snubbers installed onsite that are subject to this Code requirement (2 of these 99 are the SG large bore hydraulic snubbers). Further, these 99 snubbers were randomly assigned into 9 groups per the Code requirement .
However, NRC staff believes that the KPS selection of snubbers to populate the 9 groups from the total of 99 snubbers, must be based on the various attributes of design, configuration, environment , ranges or sizes, and capacity.
Without knowing the details (size, design, location, capacity etc.) of all of the 99 snubbers at KPS, NRC staff believes that there are only two large bore hydraulic snubbers which are SG large bore hydraulic snubbers (LBHSs), each with a capacity of 900 KIPs. If there are no other large bore snubbers, these two snubbers will form a single group (out of 9 groups).
During the 10% sampling process, one SG large bore snubber needs to be selected from this group.
Therefore, for every 10% sampling process, there will be one SG snubbers selected for sample testing.
Applying the NRCs understanding of OMa-1988 leads to a different result than the understanding that KPS applies.
Additional information pertaining to snubber testing:
(1) Please note that the statistical method only provides a confidence that applies to the population as a whole in the absence of testing each snubber. By using this sampling method, the NRC staff has observed for some plants that some of the snubbers were tested few times in their expected life of 40 years while some snubbers were never tested at all. Therefore, based on snubber aging study process, in the NUREG/CR-5870, Results of LWR Snubber Aging Reseach, dated May 1992, the NRC recommended the Service Life Monitoring (SLM) of snubbers in addition to the statistical testing process. Most of the plants have included SLM in their TS, TRM etc. in the past. The ASME OM Code, Subsection ISTD also included SLM along with snubbers examination and inservice testing requirements.
(2) NRC Generic Issue 113, Dynamic Qualification and Testing of Large-Bore Hydraulic Snubbers (LBHSs), recommended that plants should (1) establish a separate ISI/IST LBHS category; and (2) 1
perform fluid sampling and analysis of LBHSs. Some of the plants are following these recommendations. Also these requirements have been incorporated in ASME OM Code.
(3) NRC issued Regulatory Issue Summary (RIS) 2010-06, Inservice Inspection and Testing Requirements of Dynamic Restraints (Snubbers) on June 1, 2010 to remind all the licensees of the NRCs rules and regulations regarding snubber ISI and testing.
(4) Within the regulations 10 CFR 50.55a(g)(5)(ii) states, in part, that If a revised inservice inspection program for a facility conflicts with the technical specification (TS) for the facility, the licensee shall apply to the Commission for amendment of the TSs to conform the TS to the revised program.
====== end NRC staff understanding =============
The Kewaunee Understanding of Section 3.2.3.1.a follows From: Jack Gadzala [1]
Sent: Thursday, May 12, 2011 4:20 PM To: Feintuch, Karl
Subject:
KPS Relief Request RR-2-2 (ME4722) RAI Discussion
- Karl, As a followup from our earlier call today, I am providing the following reference for further discussion.
OMa1998, Section 3.2.3.1.a states the following.
For the first sample lot tested, 10% of the snubbers in the general population shall be selected. As far as practical, this sample selected for testing shall include the various designs, configurations, operating environments, range or sizes, and capacity of snubbers, etc. The first sample lots tested shall be a composite based on the ratio of each particular category to the total numbers of snubbers installed in the plant. Sample lot selection from the representative categories of snubbers shall be random.
KPS has a total of 99 snubbers installed onsite that are subject to this Code (2 of these 99 are the large bore snubbers).
These 99 snubbers were randomly assigned into 9 groups per the Code requirement (all 99 of these snubbers are part of the general population). This random selection, in compliance with the above Code requirement, resulted in the 2 large bore snubbers being assigned into two different groups (since the Code requires that the sample groups each include the various types of snubbers). As such, the current Code of Record only requires that these snubbers be tested at the same interval as any other snubber onsite. Consequently, the Code of Record does not require that the large bore snubbers be testing more frequently than any other snubber subject to the Code (for the current 10year interval).
We understand that for the next 10year interval, this will need to change (i.e., the snubbers will be grouped separately per the newer edition of the Code). However, the existing Code of record does not require this.
Jack Dominion KPS Licensing 920-388-8604 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The 2
information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
3
Hearing Identifier: NRR_PMDA Email Number: 42 Mail Envelope Properties (26E42474DB238C408C94990815A02F094C0C5287F3)
Subject:
ME4722 - Sampling Schemes Discussion Sent Date: 5/19/2011 8:39:12 AM Received Date: 5/19/2011 8:39:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
"Bedi, Gurjendra" <Gurjendra.Bedi@nrc.gov>
Tracking Status: None "McMurtray, Anthony" <Anthony.McMurtray@nrc.gov>
Tracking Status: None
"'thomas.l.breene@dom.com'" <thomas.l.breene@dom.com>
Tracking Status: None
"'jack.gazala@dom.com'" <jack.gazala@dom.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 6758 5/19/2011 8:39:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: