MONTHYEARML1028710612010-10-12012 October 2010 E-mail Kewaunee - Request for Alternate Test Requirements for Large-bore Hydraulic Snubbers - Acceptance Review Results Project stage: Acceptance Review ML1036305892011-01-0606 January 2011 Request for Additional Information, Kewaunee Power Station Relief Request No. RR-2-2, Steam Generator Large-Bore Snubber Inspection and Testing for Fourth 10-Year Interval Project stage: RAI ML1102800562011-01-26026 January 2011 Response to Request for Additional Information on Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-2 Project stage: Response to RAI ML1110805922011-04-12012 April 2011 Regarding ME4722- Kewaunee Relief Request RR-2-2 for SG Large Bore Snubbers - April 11, 2011 Conference Call Project stage: Other ML1117916872011-06-27027 June 2011 Inservice Inspection Program Fourth Ten-Year Interval Request for Withdrawal of 10 CFR 50.55a Relief Request No. RR-2-2 Project stage: Withdrawal ML1122003902011-08-0909 August 2011 Withdrawal of Request for Alternative Test Requirements for Large-Bore Hydraulic Snubbers Project stage: Withdrawal 2011-01-06
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
From: Feintuch, Karl Sent: Tuesday, April 12, 2011 2:13 PM To: 'Jack Gadzala' Cc: Bedi, Gurjendra
Subject:
RE: ME4722- Kewaunee Relief Request RR-2-2 for SG large Bore snubbers -
April 11, 2011 conference call During the conference call Kewaunee personnel discussed aspects of the requested action as associated with each of the draft items below.
Toward the end of this month, a second discussion may be needed to determine appropriate RAI items, which may differ from those below in both number and content. As a consequence, the draft items below are not being finalized and no response is requested at this time.
Attending for the NRC were:
Karl Feintuch, Project Manager Gurjendra Bedi, Technical Reviewer From: Jack Gadzala [1]
Sent: Tuesday, April 12, 2011 11:50 AM To: Feintuch, Karl
Subject:
RE: ME4722- Kewaunee Relief Request RR-2-2 for SG large Bore snubbers (ME4722)
- Karl, The licensee attendees at yesterdays conference call were:
Jack Gadzala, Licensing Craig Sly, Licensing Thomas Schneider, Engineering Timothy Hanna, Engineering Jack From: Feintuch, Karl [2]
Sent: Tuesday, April 05, 2011 11:06 AM To: Jack Gadzala (Generation - 4)
Cc: Bedi, Gurjendra
Subject:
ME4722- Kewaunee Relief Request RR-2-2 for SG large Bore snubbers (ME4722)
CPTB staff (Gurjendra Bedi) would like to have a teleconference with KPS to clarify the ME4722 RAI responses received on January 26, 2011(ML110280056). A convenience copy is attached.
Bedi is available all day on Thursday (4/7), Friday (4/8), Monday (4/11), Tuesday (4/12). I would propose a first choice of anytime on 4/7 and then on 4/11, if practical.
The potential items (draft questions or statements), which may be discussed during this teleconference and which are its agenda, follow:
Draft Item 1: KPS Response to RAI1(a) It is not very clear . Currently what snubber program is being used at KPS for non SG snubbers (1) TS, or (2) TRM, or (3) ASME Section XI, or (4)
ASME OM Code, or (5) Relief Request Number, if any?
Draft Item 2: For SG snubbers ASME/ANSI OM-1987 with 1988 Addenda, Part 4 is being used. Please provide edition and addenda of ASME Section XI, which is being used.
Draft Item 3: In KPS response to RAI1(b), the licensee states that snubber surveillance requirements relocated to TRM. Please provide a copy of TRM.
Draft Item 4: In response to RAI 1(b) the KPS states that the snubber test program implements the ASME OM Code and ASME Section XI, 1998 Edition thru 2000 Addenda. Please explain how two Codes can be used for snubber program.
Draft Item 5: In response to RAI 3, KPS states that Since one snubber group is tested at each 18-months interval, the Snubber Test Program would allow up to 13.5 years between tests of individual small-bore snubbers. Please explain meaning of this statement.
Draft Item 6: SG large bore tested in 1996, 1998, 2001 and 2008 and 2009. Please explain what testing was performed during period between 2001 and 2008.
Draft Item 7: KPS did not provide any justification or hardship for relief, beyond the higher cost.
Draft Item 8: Please see Generic Issue 113, Dynamic Qualification and Testing of Large Bore Hydraulic Snubbers, and provide justification for relief.
Karl Feintuch USNRC 301-415-3079 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.