Letter Sequence Supplement |
---|
TAC:ME1476, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting
Results
Other: ML092460553, ML092460595, ML092460596, ML100190073, ML100190074, ML100190075, ML100190076, ML100190077, ML101300006, ML101900448, ML101900449, ML101900450, ML101950497, ML101950498, ML103050187, ML110460160, ML110880302, ML11171A060, ML111920326, ML111950133, ML112031112, ML112081701, ML112160736, ML11221A013, ML112450479, ML112460008, ML112460009, ML113340186, ML120050150, ML120250137, ML12313A203, ML12313A204, ML12313A206, NRC-2010-0117, Final Environmental Assessment and Finding of No Significant Impact - Federal Register Notice - Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level
|
MONTHYEARML1001900772004-03-31031 March 2004 GE-NE-0000-0024-6517-R0, Safer/Gestr Loss-of-Coolant Accident Analysis for GE14 Fuel. Project stage: Other ML0916101032009-05-27027 May 2009 License Amendment Request (LAR) Pursuant to 10 CFR 50.90: Extended Power Uprate Project stage: Request ML0918906662009-07-0808 July 2009 E-mail from R. Guzman to J. Dosa Acceptance Review Results of NMP2 Extended Power Uprate Application Project stage: Acceptance Review ML0919402542009-07-15015 July 2009 Acceptance Review of License Amendment Request Extended Power Uprate Project stage: Acceptance Review ML0924605502009-08-28028 August 2009 Response to Acceptance Review Comments License Amendment Request for Extended Power Uprate Project stage: Request ML0924605962009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2 Project stage: Other ML0924605952009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2 Project stage: Other ML0924605532009-08-28028 August 2009 Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Project stage: Other ML0924502742009-09-0202 September 2009 Acceptance Review Determination of Amendment Request and Supplemental Information Extended Power Uprate Project stage: Acceptance Review ML1019704202009-09-18018 September 2009 E-mail from R. Guzman to J. Dosa Request for Additional Information - Clarification of Applicability of GEH Methods Project stage: RAI ML0928100032009-10-0808 October 2009 Request for Additional Information Nine Mile Point Unit 2 (NMP2) Extended Power Uprate Application License Amendment Request Project stage: RAI ML0930800012009-11-13013 November 2009 Request for Additional Information Extended Power Uprate Project stage: RAI ML0931900032009-11-18018 November 2009 Request for Additional Information the License Amendment Request for Extended Power Uprate Project stage: RAI ML0934300032009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated August 28, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0932706132009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0934106852009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0935110252009-12-23023 December 2009 Request for Additional Information Extended Power Uprate License Amendment Request Project stage: RAI ML1001900722009-12-23023 December 2009 Response to Request for Additional Information, Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1001900732009-12-31031 December 2009 C.D.I. Technical Note No. 09-17NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Nine Mile Point, Unit 2, Revision 0 Project stage: Other ML1001900742009-12-31031 December 2009 C.D.I. Report No. 08-08NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz, Revision 3 Project stage: Other ML1001900752009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Cover to Page 62, Revision 1 Project stage: Other ML1001900762009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Page 63 Through 130, Revision 1 Project stage: Other ML1019704362010-01-12012 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information - Extended Power Uprate LAR Standby Liquid Control System Project stage: RAI ML1019704452010-01-27027 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate - Clarification for Piping NDE Review Project stage: RAI ML1019704532010-02-0101 February 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate LAR - Clarification in Fire Protection Review RAI D1, D3 Project stage: RAI ML1005505992010-02-19019 February 2010 Response to Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1006301122010-03-10010 March 2010 Request for Additional Information - Extended Power Uprate License Amendment Request Mechanical & Civil Engineering Review Project stage: RAI ML1006902762010-03-10010 March 2010 E-mail from R.Guzman to T.Darling Request for Additional Information - Containment & Ventilation Branch - Extended Power Uprate Project stage: RAI ML1006301082010-03-10010 March 2010 Request for Additional Information Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: RAI ML1005508412010-03-16016 March 2010 Letter Transmitting the Draft Environmental Assessment for Nine Mile Point Nuclear Station Extended Power Uprate for Unit No. 2 Project stage: Draft Other ML1006804292010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated December 23, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804412010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement December 23,2 009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804482010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement February 19, 2010 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1008500412010-04-0202 April 2010 Summary of Audit Related to the Review of the Extended Power Uprate License Amendment Request of Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Approval ML1008500512010-04-0202 April 2010 Correction Notice to Draft Environmental Assessment for Nine Mile Point Nuclear Station Proposed Extended Power Uprate Amendment for Unit No. 2 Project stage: Draft Other ML1008501072010-04-0202 April 2010 Letter Transmitting Correction to the Notice for the Draft Environmental Assessment and Finding of No Significant Impact for Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Draft Other ML1013000062010-04-14014 April 2010 Follow-Up Questions - EPU Vessels and Integrity Review Project stage: Other ML1011206582010-04-16016 April 2010 Response to Request for Additional Information Re License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1013803072010-05-0707 May 2010 Response to Request for Additional Information Regarding Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1013200242010-05-10010 May 2010 E-mail from R. Guzman to T. Darling/J. Dosa Request for Additional Information - LOCA Analysis, Extended Power Uprate Project stage: RAI ML1012504242010-05-11011 May 2010 Request for Additional Information Extended Power Uprate License Amendment Request - Reactor System Review Project stage: RAI ML1016101682010-06-0303 June 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation- Reactor Systems Review Project stage: Response to RAI ML1015908092010-06-0808 June 2010 Request for Additional Information Extended Power Uprate - Probabilistic Risk Assessment Review Project stage: RAI ML1015906522010-06-10010 June 2010 Review of Extended Power Uprate Application and Revised Review Schedule Project stage: Approval ML1019604812010-06-15015 June 2010 E-mail from R.Guzman to T.Darling Request for Additional Information Follow-up RAI - Reactor Systems/Criticality Analysis Project stage: RAI ML1019004492010-06-30030 June 2010 C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 Project stage: Other ML1019004502010-06-30030 June 2010 Calculation SIA 100632.301, Revision 0, May 2010 Nine Mile Point Unit 2 Main Steam Line Strain Gage Data Reduction. Project stage: Other ML1019004482010-06-30030 June 2010 C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) Project stage: Other ML1019004472010-06-30030 June 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation - Steam Dryer and Probabilistic Risk Assessment Project stage: Response to RAI ML1019504952010-07-0909 July 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation, Non-Proprietary Version of Continuum Dynamics, Inc. Report 10-11 Project stage: Response to RAI 2010-02-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] |
Text
This letter forwards proprietary information in accordance with 10 CFR 2.390. The balance of this letter may be considered non-proprietary upon removal of Attachment 3.
Sam Belcher P.O. Box 63 Vice President-Nine Mile Point Lycoming, New York 13093 315.349.5200 315.349.1321 Fax CENG a joint venture of 0 Constellation eDF SEnemrg 0 NINE MILE POINT NUCLEAR STATION January 31, 2011 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Supplemental Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 -
Re: The License Amendment Request for Extended Power Uprate Operation (TAC No. ME1476) - Steam Dryer
REFERENCES:
(a) Letter from K. J. Polson (NMPNS) to Document Control Desk (NRC), dated May 27, 2009, License Amendment Request (LAR) Pursuant to 10 CFR 50.90:
Extended Power Uprate (b) Letter from R. Guzman (NRC) to S. L. Belcher (NMPNS), dated October 6, 2010, Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 - Re: The Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation (TAC No. ME 1476)
(c) Letter from J. Pacher (NMPNS) to Document Control Desk (NRC), dated November 5, 2010, Response to Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 - Re: The License Amendment Request for Extended Power Uprate Operation (TAC No. ME1476) - Steam Dryer (d) Letter from S. Belcher (NMPNS) to Document Control Desk (NRC), dated December 10, 2010, Response to Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 - Re: The License Amendment Request for Extended Power Uprate Operation (TAC No. ME1476) - Steam Dryer This letter forwards proprietary information in accordance with 10 CFR 2.390. The balance of this letter may be considered non-proprietary upon removal of Attachment 3.
Document Control Desk January 31, 2011 Page 2 Nine Mile Point Nuclear Station, LLC (NMPNS) hereby transmits supplemental information in support of a previously submitted request for amendment to Nine Mile Point Unit 2 (NMP2) Renewed Operating License (OL) NPF-69. The request, dated May 27, 2009 (Reference a), proposed an amendment to increase the power level authorized by OL Section 2.C.(1), Maximum Power Level, from 3467 megawatts-thermal (MWt) to 3988 MWt.
By letter dated October 6, 2010 (Reference b), the NRC staff requested additional information (RAI) regarding the steam dryer. NMPNS responded to the steam dryer RAI on November 5, 2010 (Reference c) and December 10, 2010 (Reference d). During a conference call between the NRC and NMPNS conducted on November 29, 2010, the NRC asked additional questions pertaining to the November 5, 2010, responses to requests NMP2-EMCB-SD-RAI-8 S01 (b) and NMP2-EMCB-SD-RAI-21 SO. (non-proprietary) and Attachment 3 (proprietary) provide supplemental information to address those NRC questions. is considered to contain proprietary information exempt from disclosure pursuant to 10 CFR 2.390. Therefore, on behalf of Continuum Dynamics Incorporated (CDI), NMPNS hereby makes application to withhold this attachment from public disclosure in accordance with 10 CFR 2.390(b)(1).
The affidavit from CDI detailing the reason for the request to withhold the proprietary information is provided in Attachment 2.
Should you have any questions regarding the information in this submittal, please contact John J. Dosa, Director Licensing, at (315) 349-5219.
Very truly yours,
Document Control Desk January 31, 2011 Page 3 STATE OF NEW YORK TO WIT:
COUNTY OF OSWEGO I, Sam Belcher, being duly sworn, state that I am Vice President - Nine Mile Point, and that I am duly authorized to execute and file this supplemental information on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
Subscribed and sworn before me, a Notary Public in and for the State of New York and County of
- /h i ,this day of h-,t/rr ,2011.
, J WITNESS my Hand and Notarial Seal: slid A/i Notary Public My Commission Expires:
____/,-_/ ______ Lsa M. Doran Date Notiy Public Inthe State of New York O9weg County Reg. No. 01 D06029220 SB/STD My n
I. Supplemental Information Regarding License Amendment Request for Extended Power Uprate Operation (Non-Proprietary)
- 2. Affidavit from Continuum Dynamics Incorporated (CDI) Justifying Withholding Proprietary Information
- 3. Supplemental Information Regarding License Amendment Request for Extended Power Uprate Operation (Proprietary) cc: NRC Regional Administrator, Region I NRC Resident Inspector NRC Project Manager A. L. Peterson, NYSERDA (w/o Attachment 3)
ATTACHMENT 2 AFFIDAVIT FROM CONTINUUM DYNAMICS INCORPORATED (CDI)
JUSTIFYING WITHHOLDING PROPRIETARY INFORMATION Nine Mile Point Nuclear Station, LLC January 31, 2011
Continuum Dynamics, Inc.
(609) 538-0444 (609) 538-0464 fax 34 Lexington Avenue Ewing, NJ 08618-2302 AFFIDAVIT Re: Supplemental Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 -
Re: The License Amendment Request for Extended Power Uprate Operation (TAC No.
ME 1476) - Steam Dryer I, Alan J. Bilanin, being duly sworn, depose and state as follows:
- 1. I hold the position of President and Senior Associate of Continuum Dynamics, Inc. (hereinafter referred to as C.D.I.), and I am authorized to make the request for withholding from Public Record the Information contained in the documents described in Paragraph 2. This Affidavit is submitted to the Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 2.390(a)(4) based on the fact that the attached information consists of trade secret(s) of C.D.I. and that the NRC will receive the information from C.D.I. under privilege and in confidence.
- 2. The Information sought to be withheld, as transmitted to Constellation Energy Group as attachments to C.D.I. Letter No. 11006 dated 17 January 2011, Supplement Information Regarding Nine Mile Point Nuclear Station, Unit No. 2 - Re: The License Amendment Request for Extended Power Uprate Operation (TAC No. ME 1476) - Steam Dryer.
- 3. The Information summarizes:
(a) a process or method, including supporting data and analysis, where prevention of its use by C.D.I.'s competitors without license from C.D.I. constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; (c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs 3(a), 3(b) and 3(c) above.
- 4. The Information has been held in confidence by C.D.I., its owner. The Information has consistently been held in confidence by C.D.I. and no public disclosure has been made and it is not available to the public. All disclosures to third parties, which have been limited, have been made pursuant to the terms and conditions contained in C.D.I.'s Nondisclosure Secrecy Agreement which must be fully executed prior to disclosure.
- 5. The Information is a type customarily held in confidence by C.D.I. and there is a rational basis therefore. The Information is a type, which C.D.I. considers trade secret and is held in confidence by C.D.I. because it constitutes a source of competitive advantage in the competition and performance of such work in the industry. Public disclosure of the Information is likely to cause substantial harm to C.D.I.'s competitive position and foreclose or reduce the availability of profit-making opportunities.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to be the best of my knowledge, information and belief.
Executedonthis ,/; dayof , 2011.
Continuu Dyn ics, Inc.
Subscribed and sworn before me this day: 7? & /
e~en t. ur4 i er, ýNotayPublic
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
Certain information, considered proprietary by Continuum Dynamics Incorporated, has been deleted from this Attachment. The deletions are identified by double square brackets.
Nine Mile Point Nuclear Station, LLC January 31, 2011
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
By letter dated May 27, 2009, as supplemented on August 28, 2009, December 23, 2009, February 19, 2010, April 16, 2010, May 7, 2010, June 3, 2010, June 30, 2010, July 9, 2010, July 30, 2010, October 8, 2010, October 28, 2010, November 5, 2010, December 10, 2010, December 13, 2010, and January 19, 2011 Nine Mile Point Nuclear Station, LLC (NMPNS) submitted for Nuclear 'Regulatory Commission (NRC) review and approval, a proposed license amendment requesting an increase in the maximum steady-state power level from 3467 megawatts thermal (MWt) to 3988 MWt for Nine Mile Point Unit 2 (NMP2).
By letter dated October 6, 2010, the NRC staff requested additional information (RAI) regarding the steam dryer. NMPNS responded to the steam dryer RAI on November 5, 2010 and December 10, 2010.
During a conference call between the NRC and NMPNS conducted on November 29, 2010, the NRC asked additional questions pertaining to the November 5, 2010, responses to requests NMP2-EMCB-SD-RAI-8 S01 (b) and NMP2-EMCB-SD-RAI-21 SOl. This attachment provides supplemental information to address those questions.
1 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
Supplemental Information for NMPNS Response to NMP2-EMCB-SD-RAI-8 S01 (b)
NRC Question: The NMP2 low power coherence data provided in the response to RAI NMP2-EMCB-SD-RAI-8 SO] (b) in the NMPNS submittal dated November 5, 2010 does not correlate with the Quad Cities Unit 2 (QC2) low power coherence data used as a benchmark. Provide additionaljustificationfor the use of the QC2 data.
NMPNS Response NMPNS concurs with the NRC that the coherence for the low power data provided in the NMPNS submittal dated November 5, 2010 (Figure RAI-8 SOI (b) - SI) does not correlate with the QC2 low power coherence data (Figure RAI-8 SO 1(b) - S2). The low power data set was collected during a NMP2 power ascension on May 2 through May 7, 2010 at Current Licensed Thermal Power (CLTP) conditions.
NMPNS reviewed the 2010 NMP2 data against a low power data set collected in 2008. The coherence for the data set collected in 2008 was provided to the NRC in Attachments 4 and 14 of a NMPNS submittal dated December 23, 2009. The coherence is reproduced in Figure RAI-8 SO I (b) - S3. As can be seen in the figures, there is a difference between the 2008 and 2010 low power data sets. ((
(3)))
Figure RAI-8 SO 1 (b) - S 1: Low Power Coherence for NMP2 Data Set Collected in 2010 2 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
[F (3)))
Figure RAI-8 SO1(b) - S2: Low Power Coherence for QC2 (3)))
Figure RAI-8 SO1(b) - S3: Low Power Coherence for NMP2 Data Set Collected in 2008 3 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
NMPNS evaluated the impact that the application of the 2008 low power data would have on the dryer stresses. This evaluation was performed by using the 2008 low power data with 2010 CLTP data and Rev. 4.1 of the Acoustic Circuit Model (ACM). The computed CLTP stresses utilizing the 2008 low power data are lower than those calculated using the 2010 low power data. This conclusion may be seen by examining the 18 nodes with the lowest stress ratios from the use of the 2010 low power data, and comparing these stress ratios with the stress ratios obtained from the use of the 2008 low power data, as summarized below:
Location Node 2010 2010 2008 2008 SR-P SR-a SR-P SR-a
- 1. ClosurePlate/Middle Hood 89317 2.86 3.52 2.85 3.47
- 2. Outer Cover Plate/Outer Hood 95236 5.32 3.09 5.39 3.27
- 3. Hood Support/Outer Cover Plate/Outer Hood 95267 1.97 3.13 1.42 3.13
- 4. Hood Support/Inner Hood 95644 6.41 3.38 5.10 3.41
- 5. Top Thick Plate/Inner Hood/Top Plate 85512 6.24 3.22 6.44 3.26
- 6. Hood Support/Outer Base Plate/Middle Backing Bar 98067 2.10 3.31 2.09 3.41
- 7. Thick Vane Bank Plate/Thin Vane Bank Plate/Side 90170 6.05 3.42 5.91 3.34 Plate/Side Plate Ext/End Plate
- 8. Hood Support/Inner Hood 99540 5.53 3.17 4.37 3.21
- 9. Hood Support/Inner Hood 95638 7.03 3.51 5.52 3.53
- 10. Side Plate/Top Plate 93031 5.94 3.64 5.91 3.51
- 11. Closure Plate/Inner Hood 95975 2.56 4.00 2.56 4.22
- 12. Entry Bottom Perforated/Side Plate/End Plate 91154 5.16 3.52 5.30 3.67
- 13. Top Thick Plate/Side Plate/Closure Plate 96096 3.73 4.09 3.73 4.39
- 14. Side Plate/Brace 89646 5.79 4.22 3.44 4.23
- 15. Hood Support/Inner Hood 90430 6.89 3.65 5.43 3.67
- 16. Hood Support/Middle Hood 96037 6.44 3.78 5.25 3.79
- 17. Outer Cover Plate/Man Way Overlap 87488 5.84 3.76 5.85 4.10 The minimum altemating stress ratio (SR-a) with the 2010 low power data is 3.09 (location 2 in the above table), while the minimum alternating stress ratio with the 2008 low power data is 3.13 (location 3).
Based on this evaluation, NMPNS concludes that the use of the 2010 low power data provides a conservative result, and is therefore acceptable.
4 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
Supplemental Information for NMPNS Response to NMP2-EMCB-SD-RAI-21 S01 NRC Question No. 1. Item (1) in RA 21 is not explicitly addressed.
NMPNS Response Item (1) of the RAI concerns the deviation between the sub-model and global model stresses on the cut boundary when the boundary is close to a structural discontinuity. The November 5, 2010, RAI response addressed the general case of higher order stress variations on the intersection boundaries without explicitly identifying the origins of these higher order variations. This response discussed that the loads applied to the intersected edges of the sub-model consist of distributed forces and moments that are obtained by integrating the global model stresses, ag, along the intersection line. Subsequent imposition of these forces and moments upon the sub-model boundaries produces stresses, rm,that, though somewhat different from (g on the sub-model boundaries, nevertheless integrate to the same forces and moments on the edge. The mismatch stress, ah=ag-am, has zero net force and moment and decays rapidly as one moves away from the intersection boundary, in accordance with the St. Venant's principle.
Calculation results provided in Table RAI-21 S01-1 in the RAI response dated November 5, 2010, reported that the effect of omitting these higher order variations upon the computed stress reduction factor is small; specifically, the error between calculation CO (higher order variation omitted) and C2 (higher order variations retained) is 0.8%.
The allusion to a structural discontinuity in Item (1) of the RAI was originally intended to exemplify one instance under which such a mismatch stress, Oh, might arise. When a structural discontinuity or stress concentration lies near an intersection boundary, but outside the volume occupied by the sub-model, one would expect to see a stronger stress variation on the portion of the intersection boundary nearest to the discontinuity. Thus, the local mismatch stress, ah, would then naturally be higher than when no such stress concentrations outside the model were present. However, as explained above and in the RAI response, the stress mismatch would still produce zero net forces/moments and adheres to the St.
Venant's principle. Therefore, the conclusions of the RAI response are unchanged.
5 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
NRC Question No. 2. Compare stress distributionsbetween the global and sub-models.
NMPNS Response Tables RAI-21 S01 - SI and RAI-21 SO1 - S2 list the component stresses at the maximum stress stations for two points on the drain channel (the component that is most highly stressed). The first point (node 56724) is on the bottom edge of the drain channel and the second point (node 56197) is located higher up on the drain channel and closer to the weld. These locations are selected because they are away from both the weld and the intersection boundaries. The stress distributions are provided prior to application of step 4 (discussed at length in the original RAI response), so that only the forces and moments extracted from the global model are applied to the perimeter edges. Both locations are depicted in Figure RAI-21 So0- Si.
Stress Stress [psi]
component Global Shell Solid submodel submodel (Y 92.12 74.05 61.26 0yy 575.96 565.25 577.91 a,, N/A (identically zero at free edge) ax_ 191.39 203.04 188.63 GyZ N/A (identically zero at free edge)
Gzx N/A (identically zero at free edge)
Table RAI-21 SO1 - S1 - Stress results at node 56724 at bottom of the drain channel Stress Stress [ psi ]
component Global Shell Solid submodel submodel (7x -28.00 -5.72 -8.36 Ovy -645.87 -659.20 -700.74 U_ _ -293.98 -313.37 -317.99 Gxy 38.11 56.16 75.81 Ow -26.19 27.37 63.33 0" 4.00 -2.17 -6.86 Table RAI-21 SO1 - S2 - Stress results at node 56197 6 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
Figure RAI-21 S01 - S1 - Global model node indices in the vicinity of the drain/skirt weld. Stress components are compared at node 56724 with (x,y,z) = (-91.91, 80.18, -101.5) located on the bottom edge of the drain channel, and at node 56197 located on the drain channel at (x,y,z) = (-92.08, 78.91, -98.48).
7 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
NRC Question No. 3. Because of(( between (3)))
calculationsC1 and CO listed in Table RAI-21 SO]-1.
NMPNS Response NMPNS concurs that, like any numerical method, the sub-modeling approach is subject to modeling, numerical, and discretization errors. NMPNS also agrees that the (( (3))) in the cited Table RAI-21 S01 - 1 in the RAI response dated November 5, 2010 (NMP2-EMCB-SD-RAI-21 S01), is a reasonable estimate of the (((3)fl.
The following provides the rationale for this conclusion:
(3)))
8 of 9
ATTACHMENT 1 SUPPLEMENTAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (NON-PROPRIETARY)
Another way to understand this rationale is to note that the primary purpose of utilizing a sub-model is to obtain more accurate stress estimates at a location through the use of higher resolution and more detailed analysis. This is true of any sub-modeling or sub-structuring approach, including the displacement-driven sub-structuring method in ANSYS that is considered standard. At some point in each such approach, the boundary displacements, stresses, or integrated forces must be extracted from a global model whose mesh resolution is coarser than that of the sub-model. Subjecting the sub-model result to both ((
(3))). However, no credit for such a reduction is taken.
9 of 9