Letter Sequence RAI |
---|
TAC:ME1476, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting
Results
Other: ML092460553, ML092460595, ML092460596, ML100190073, ML100190074, ML100190075, ML100190076, ML100190077, ML101300006, ML101900448, ML101900449, ML101900450, ML101950497, ML101950498, ML103050187, ML110460160, ML110880302, ML11171A060, ML111920326, ML111950133, ML112031112, ML112081701, ML112160736, ML11221A013, ML112450479, ML112460008, ML112460009, ML113340186, ML120050150, ML120250137, ML12313A203, ML12313A204, ML12313A206, NRC-2010-0117, Final Environmental Assessment and Finding of No Significant Impact - Federal Register Notice - Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level
|
MONTHYEARML1001900772004-03-31031 March 2004 GE-NE-0000-0024-6517-R0, Safer/Gestr Loss-of-Coolant Accident Analysis for GE14 Fuel. Project stage: Other ML0916101032009-05-27027 May 2009 License Amendment Request (LAR) Pursuant to 10 CFR 50.90: Extended Power Uprate Project stage: Request ML0918906662009-07-0808 July 2009 E-mail from R. Guzman to J. Dosa Acceptance Review Results of NMP2 Extended Power Uprate Application Project stage: Acceptance Review ML0919402542009-07-15015 July 2009 Acceptance Review of License Amendment Request Extended Power Uprate Project stage: Acceptance Review ML0924605502009-08-28028 August 2009 Response to Acceptance Review Comments License Amendment Request for Extended Power Uprate Project stage: Request ML0924605962009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2 Project stage: Other ML0924605952009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2 Project stage: Other ML0924605532009-08-28028 August 2009 Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Project stage: Other ML0924502742009-09-0202 September 2009 Acceptance Review Determination of Amendment Request and Supplemental Information Extended Power Uprate Project stage: Acceptance Review ML1019704202009-09-18018 September 2009 E-mail from R. Guzman to J. Dosa Request for Additional Information - Clarification of Applicability of GEH Methods Project stage: RAI ML0928100032009-10-0808 October 2009 Request for Additional Information Nine Mile Point Unit 2 (NMP2) Extended Power Uprate Application License Amendment Request Project stage: RAI ML0930800012009-11-13013 November 2009 Request for Additional Information Extended Power Uprate Project stage: RAI ML0931900032009-11-18018 November 2009 Request for Additional Information the License Amendment Request for Extended Power Uprate Project stage: RAI ML0934300032009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated August 28, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0932706132009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0934106852009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0935110252009-12-23023 December 2009 Request for Additional Information Extended Power Uprate License Amendment Request Project stage: RAI ML1001900722009-12-23023 December 2009 Response to Request for Additional Information, Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1001900732009-12-31031 December 2009 C.D.I. Technical Note No. 09-17NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Nine Mile Point, Unit 2, Revision 0 Project stage: Other ML1001900742009-12-31031 December 2009 C.D.I. Report No. 08-08NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz, Revision 3 Project stage: Other ML1001900752009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Cover to Page 62, Revision 1 Project stage: Other ML1001900762009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Page 63 Through 130, Revision 1 Project stage: Other ML1019704362010-01-12012 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information - Extended Power Uprate LAR Standby Liquid Control System Project stage: RAI ML1019704452010-01-27027 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate - Clarification for Piping NDE Review Project stage: RAI ML1019704532010-02-0101 February 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate LAR - Clarification in Fire Protection Review RAI D1, D3 Project stage: RAI ML1005505992010-02-19019 February 2010 Response to Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1006301122010-03-10010 March 2010 Request for Additional Information - Extended Power Uprate License Amendment Request Mechanical & Civil Engineering Review Project stage: RAI ML1006902762010-03-10010 March 2010 E-mail from R.Guzman to T.Darling Request for Additional Information - Containment & Ventilation Branch - Extended Power Uprate Project stage: RAI ML1006301082010-03-10010 March 2010 Request for Additional Information Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: RAI ML1005508412010-03-16016 March 2010 Letter Transmitting the Draft Environmental Assessment for Nine Mile Point Nuclear Station Extended Power Uprate for Unit No. 2 Project stage: Draft Other ML1006804292010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated December 23, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804412010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement December 23,2 009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804482010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement February 19, 2010 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1008500412010-04-0202 April 2010 Summary of Audit Related to the Review of the Extended Power Uprate License Amendment Request of Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Approval ML1008500512010-04-0202 April 2010 Correction Notice to Draft Environmental Assessment for Nine Mile Point Nuclear Station Proposed Extended Power Uprate Amendment for Unit No. 2 Project stage: Draft Other ML1008501072010-04-0202 April 2010 Letter Transmitting Correction to the Notice for the Draft Environmental Assessment and Finding of No Significant Impact for Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Draft Other ML1013000062010-04-14014 April 2010 Follow-Up Questions - EPU Vessels and Integrity Review Project stage: Other ML1011206582010-04-16016 April 2010 Response to Request for Additional Information Re License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1013803072010-05-0707 May 2010 Response to Request for Additional Information Regarding Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1013200242010-05-10010 May 2010 E-mail from R. Guzman to T. Darling/J. Dosa Request for Additional Information - LOCA Analysis, Extended Power Uprate Project stage: RAI ML1012504242010-05-11011 May 2010 Request for Additional Information Extended Power Uprate License Amendment Request - Reactor System Review Project stage: RAI ML1016101682010-06-0303 June 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation- Reactor Systems Review Project stage: Response to RAI ML1015908092010-06-0808 June 2010 Request for Additional Information Extended Power Uprate - Probabilistic Risk Assessment Review Project stage: RAI ML1015906522010-06-10010 June 2010 Review of Extended Power Uprate Application and Revised Review Schedule Project stage: Approval ML1019604812010-06-15015 June 2010 E-mail from R.Guzman to T.Darling Request for Additional Information Follow-up RAI - Reactor Systems/Criticality Analysis Project stage: RAI ML1019004492010-06-30030 June 2010 C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 Project stage: Other ML1019004502010-06-30030 June 2010 Calculation SIA 100632.301, Revision 0, May 2010 Nine Mile Point Unit 2 Main Steam Line Strain Gage Data Reduction. Project stage: Other ML1019004482010-06-30030 June 2010 C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) Project stage: Other ML1019004472010-06-30030 June 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation - Steam Dryer and Probabilistic Risk Assessment Project stage: Response to RAI ML1019504952010-07-0909 July 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation, Non-Proprietary Version of Continuum Dynamics, Inc. Report 10-11 Project stage: Response to RAI 2010-02-01
[Table View] |
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23012A2002023-01-13013 January 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401 ML22207A2162022-07-26026 July 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010 ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21125A1282021-05-0404 May 2021 OPC Document Request - Feb 2021 ML21110A5112021-04-20020 April 2021 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582 ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20365A0092020-12-30030 December 2020 Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) ML20358A2602020-12-28028 December 2020 Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency ML20272A2802020-09-28028 September 2020 Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20248H5192020-09-28028 September 2020 Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20246G6362020-09-0202 September 2020 Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-08-28028 August 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20212L8702020-07-30030 July 2020 Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) ML20213A9352020-07-30030 July 2020 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20045E3582020-02-14014 February 2020 Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates ML19296A1862019-10-23023 October 2019 Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test ML19025A1572019-01-25025 January 2019 Request for Additional Information Regarding Primary Containment Oxygen Concentration License Amendment Request ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18341A2212018-12-0707 December 2018 Request for Additional Information Regarding Emergency Tech Spec Change Re HPCS Completion Time (EPID -L-2018-LLA-0491) ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18184A2882018-07-0303 July 2018 Request for Additional Information Regarding Removal of Boraflex Credit from Spent Fuel Pool License Amendment Request(L-2018-LLA-0039) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17272A0112017-10-10010 October 2017 Request for Additional Information Regarding License Amendment Concerning Reactor Pressure Vessel Water Inventory Control ML17234A3592017-08-30030 August 2017 Request for Additional Information Regarding Relief Request NMP-RR-001 to Utilize Code Case N-702 ML17241A2752017-08-29029 August 2017 Request for Additional Information Response MSA (MF7946,7) and FE (MG0087,8) E-mail Attachment ML17240A3102017-08-15015 August 2017 NRR E-mail Capture - Nine Mile Point MSA and FE RAI ML17172A0842017-06-27027 June 2017 Request for Additional Information Regarding Relief Request to Utilize ASME Code Case N-702 ML17065A1622017-03-14014 March 2017 Request for Additional Information Regarding Proposed Alternative to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR Part 50, Appendix J 2023-09-21
[Table view] |
Text
Enclosure 2 Contains Sensitive Proprietary Information
\.~",i\ REG Ul_
UNITED STATES
~
"c, "'t r 0." NUCLEAR REGULATORY COMMISSION JJ ' .L WASHINGTON, D.C. 20555-0001
<t 0
~ ~
\"';: .f' 1<1] ~O
- i' Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING NINE MILE POINT NUCLEAR STATION, UNIT NO.2 - RE: THE LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (TAC NO. ME1476)
Dear Mr. Belcher:
By letter dated May 27,2009, as supplemented on August 28,2009, Nine Mile Point Nuclear Station, LLC, submitted for Nuclear Regulatory Commission (NRC) staff review and approval, a proposed license amendment requesting an increase in the maximum steady-state power level from 3467 megawatts thermal (MWt) to 3988 MWt for Nine Mile Point Unit NO.2 extended power uprate operation.
The NRC staff is reviewing the information provided in that letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on November 3, 2009, and it was agreed that your response would be provided within 45 days from the date of this letter.
Pursuant to 10 CFR 2.390, we have determined that the enclosed RAI contains proprietary information. We have prepared a non-proprietary version of the RAI (Enclosure 1) that does not contain proprietary information. The proprietary information is indicated in brackets and underlined in Enclosure 2.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
- 1. Request for Additional Information (Non-Proprietary)
- 2. Request for Additional Information (Proprietary) cc wlo Enclosure 2: Distribution via Listserv Enclosure 2 Contains Sensitive Proprietary Information
REQUEST FOR ADDITIONAL INFORMATION (RAI)
NINE MILE POINT NUCLEAR STATION, UNIT NO.2 (NMP2)
LICENSE AMENDMENT REQUEST (LAR) REGARDING EXTENDED POWER UPRATE DOCKET NO. 50-410 The Nuclear Regulatory Commission (NRC) staff is reviewing the Nine Mile Point Nuclear Station (NMPNS) license amendment request (LAR) application dated May 27,2009, as supplemented on August 28, 2009. The NRC staff has determined that additional information requested below will be needed to support its review.
It has come to the NRC staff's attention that there is an error in the linear heat generation rate (LHGR) uncertainty analysis provided in the approved interim methods licensing topical report (II\11LTR), NEDC-33173P, "Applicability of GE Methods to Expanded Operating Domains."
The LHGR uncertainty analysis includes the local power range monitor (LPRM) update uncertainty of (( )) percent. However, the basis for this value is the bundle power, whereas the LHGR is monitored on a nodal level with uncertainties that take into account the peak pin power uncertainty.
Appendix B of NEDC-32694P-A, "Power Distribution Uncertainties for Safety Limiting MCPR Evaluations," provides a revised LPRM update uncertainty for the LHGR evaluation of (( ))
percent. Appendix B of NEDC-32694P-A provides a calculation of the LHGR uncertainties and calculates this value as (( )) percent. When certain parameters are updated to account for
(( )), the LHGR uncertainty is (( )) percent.
When this update uncertainty is corrected in the IMLTR LHGR uncertainty calculation (see Table 2-11 from the IMLTR), the resultant LHGR uncertainty is (( )) percent. This value remains below the value assumed in the thermal-mechanical (T-M) analysis.
However, the value of the LPRM update uncertainty is a function of the exposure interval between LPRM calibrations. As the exposure interval increases, the uncertainty associated with the nodal power attributed to the update uncertainty component is expected to increase. The proposed NMP2 LPRM calibration interval is defined as 1000 effective full-power hours. Since the LAR requests an increase in the licensed thermal power, the calibration interval in terms of accumulated exposure would increase. The increased interval (in terms of exposure) may exceed the interval assumed in the development of the (( )) percent generic value.
- 1. Please quantify the LPRM exposure interval proposed for NMP2 in the units of mega watt-days per metric ton.
- 2. Please determine the LPRM update uncertainty for the nodal power consistent with, or conservatively larger than, the exposure interval between LPRM calibrations.
- 3. Please combine the update uncertainty with the other component uncertainties in Table 2-11 of the IMLTR and compare this value to the value assumed in the T-M analysis.
- 4. If the LHGR uncertainty exceeds the value assumed in the T-M analysis, please justify.
Enclosure 1
Enclosure 2 Contains Sensitive Proprietary Information November 18, 2009 Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING NINE MILE POINT NUCLEAR STATION, UNIT NO.2 - RE: THE LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE OPERATION (TAC NO. ME1476)
Dear Mr. Belcher:
By letter dated May 27,2009, as supplemented on August 28,2009, Nine Mile Point Nuclear Station, LLC, submitted for Nuclear Regulatory Commission (NRC) staff review and approval, a proposed license amendment requesting an increase in the maximum steady-state power level from 3467 megawatts thermal (MWt) to 3988 MWt for Nine Mile Point Unit NO.2 extended power uprate operation.
The NRC staff is reviewing the information provided in that letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on November 3, 2009, and it was agreed that your response would be provided within 45 days from the date of this letter.
Pursuant to 10 CFR 2.390, we have determined that the enclosed RAI contains proprietary information. We have prepared a non-proprietary version of the RAI (Enclosure 1) that does not contain proprietary information. The proprietary information is indicated in brackets and underlined in Enclosure 2.
Sincerely, IRA!
Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
- 1. Request for Additional Information (Non-Proprietary)
- 2. Request for Additional Information (Proprietary) cc wlo Enclosure 2: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPM RGuzman RidsNrrLASLittle RidsNrrDssSpnb LPLI-1 R/F RidsOGCRp RidsRgn1 MailCenter RidsNrrAcrsAcnw&mMailCenter PYarsky, NRR RidsNrrDssSrxb RidsNrrPMDPickett Accession N um ber: ML093190003 *Concurrence bly memo NRR -058 OFFICE LPL1-1/PM LPL 1-1/LA SPNB/BC LPL 1-1/BC NAME RGuzman SLittie AMendiola* NSalgado DATE 11/17/09 11/16/09 10/7/09, memo dtd 11/18/09 OFFICIAL RECORD COPY Enclosure 2 Contains Sensitive Proprietary Information