Letter Sequence Other |
|---|
TAC:ME1476, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
Results
Other: ML092460553, ML092460595, ML092460596, ML100190073, ML100190074, ML100190075, ML100190076, ML100190077, ML101300006, ML101900448, ML101900449, ML101900450, ML101950497, ML101950498, ML103050187, ML110460160, ML110830414, ML110880302, ML11171A060, ML111950133, ML112031112, ML11221A013, ML112450479, ML112460008, ML112460009, ML11321A257, ML113300047, ML113340186, ML120050150, ML120250137, ML12313A203, ML12313A204, ML12313A206, NRC-2010-0117, Final Environmental Assessment and Finding of No Significant Impact - Federal Register Notice - Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level
|
MONTHYEARML1001900772004-03-31031 March 2004 GE-NE-0000-0024-6517-R0, Safer/Gestr Loss-of-Coolant Accident Analysis for GE14 Fuel Project stage: Other ML0916101032009-05-27027 May 2009 License Amendment Request (LAR) Pursuant to 10 CFR 50.90: Extended Power Uprate Project stage: Request ML0918906662009-07-0808 July 2009 E-mail from R. Guzman to J. Dosa Acceptance Review Results of NMP2 Extended Power Uprate Application Project stage: Acceptance Review ML0919402542009-07-15015 July 2009 Acceptance Review of License Amendment Request Extended Power Uprate Project stage: Acceptance Review ML0921804072009-08-0303 August 2009 Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model Project stage: Request AEP-NRC-2009-54, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2009-08-28028 August 2009 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes Project stage: Request ML0924605532009-08-28028 August 2009 Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Project stage: Other ML0924605952009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2 Project stage: Other ML0924605962009-08-28028 August 2009 Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2 Project stage: Other ML0924605502009-08-28028 August 2009 Response to Acceptance Review Comments License Amendment Request for Extended Power Uprate Project stage: Request ML0924502742009-09-0202 September 2009 Acceptance Review Determination of Amendment Request and Supplemental Information Extended Power Uprate Project stage: Acceptance Review ML1019704202009-09-18018 September 2009 E-mail from R. Guzman to J. Dosa Request for Additional Information - Clarification of Applicability of GEH Methods Project stage: RAI ML0928100032009-10-0808 October 2009 Request for Additional Information Nine Mile Point Unit 2 (NMP2) Extended Power Uprate Application License Amendment Request Project stage: RAI ML0930800012009-11-13013 November 2009 Request for Additional Information Extended Power Uprate Project stage: RAI ML0931900032009-11-18018 November 2009 Request for Additional Information the License Amendment Request for Extended Power Uprate Project stage: RAI ML0934106852009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0934300032009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated August 28, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0932706132009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation Dated May 27, 2009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML0935110252009-12-23023 December 2009 Request for Additional Information Extended Power Uprate License Amendment Request Project stage: RAI ML1001900722009-12-23023 December 2009 Response to Request for Additional Information, Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1001900732009-12-31031 December 2009 C.D.I. Technical Note No. 09-17NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Nine Mile Point, Unit 2, Revision 0 Project stage: Other ML1001900742009-12-31031 December 2009 C.D.I. Report No. 08-08NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz, Revision 3 Project stage: Other ML1001900752009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Cover to Page 62, Revision 1 Project stage: Other ML1001900762009-12-31031 December 2009 CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Page 63 Through 130, Revision 1 Project stage: Other ML1019704362010-01-12012 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information - Extended Power Uprate LAR Standby Liquid Control System Project stage: RAI BVY 10-001, 10CFR50.46(a)(3)(ii) Annual Report for 20092010-01-14014 January 2010 10CFR50.46(a)(3)(ii) Annual Report for 2009 Project stage: Request ML1019704452010-01-27027 January 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate - Clarification for Piping NDE Review Project stage: RAI ML1019704532010-02-0101 February 2010 E-mail from R. Guzman to T. Darling Request for Additional Information Extended Power Uprate LAR - Clarification in Fire Protection Review RAI D1, D3 Project stage: RAI ML1005505992010-02-19019 February 2010 Response to Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1006301062010-03-10010 March 2010 Notice of Forthcoming Closed Meeting with Nine Mile Point Nuclear Station, LLC to Discuss the Review of Steam Dryer Analysis for the NMP2 Extended Power Uprate License Amendment Request Project stage: Meeting ML1006301122010-03-10010 March 2010 Request for Additional Information - Extended Power Uprate License Amendment Request Mechanical & Civil Engineering Review Project stage: RAI ML1006902762010-03-10010 March 2010 E-mail from R.Guzman to T.Darling Request for Additional Information - Containment & Ventilation Branch - Extended Power Uprate Project stage: RAI ML1006301082010-03-10010 March 2010 Request for Additional Information Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: RAI ML1005508412010-03-16016 March 2010 Letter Transmitting the Draft Environmental Assessment for Nine Mile Point Nuclear Station Extended Power Uprate for Unit No. 2 Project stage: Draft Other ML1006804292010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement Dated December 23, 2009 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804412010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement December 23,2 009 C.D.I Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1006804482010-04-0202 April 2010 Request for Withholding Information from Public Disclosure - Proposed License Amendment for Extended Power Uprate Operation, Supplement February 19, 2010 GEH Proprietary Documents - Nine Mile Point Nuclear Station Unit No. 2 Project stage: Withholding Request Acceptance ML1008500412010-04-0202 April 2010 Summary of Audit Related to the Review of the Extended Power Uprate License Amendment Request of Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Approval ML1008500512010-04-0202 April 2010 Correction Notice to Draft Environmental Assessment for Nine Mile Point Nuclear Station Proposed Extended Power Uprate Amendment for Unit No. 2 Project stage: Draft Other ML1008501072010-04-0202 April 2010 Letter Transmitting Correction to the Notice for the Draft Environmental Assessment and Finding of No Significant Impact for Nine Mile Point Nuclear Station, Unit No. 2 Project stage: Draft Other ML1013000062010-04-14014 April 2010 Follow-Up Questions - EPU Vessels and Integrity Review Project stage: Other ML1011206582010-04-16016 April 2010 Response to Request for Additional Information Re License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1011801752010-04-27027 April 2010 Comment (19) of David Lochbaum, on Behalf of Union of Concerned Scientists, on Petition for Rulemaking PRM-50-93, Regarding NRC Revise Its Regulations Based on Data from Multi-Rod (Assembly) Severe Fuel Damage Experiments Project stage: Request ML1013803072010-05-0707 May 2010 Response to Request for Additional Information Regarding Steam Dryer Review of the License Amendment Request for Extended Power Uprate Operation Project stage: Response to RAI ML1013200242010-05-10010 May 2010 E-mail from R. Guzman to T. Darling/J. Dosa Request for Additional Information - LOCA Analysis, Extended Power Uprate Project stage: RAI ML1012504242010-05-11011 May 2010 Request for Additional Information Extended Power Uprate License Amendment Request - Reactor System Review Project stage: RAI ML1016101682010-06-0303 June 2010 Response to Request for Additional Information Regarding the License Amendment Request for Extended Power Uprate Operation- Reactor Systems Review Project stage: Response to RAI RA-10-046, 10 CFR 50A6 Annual Report2010-06-0404 June 2010 10 CFR 50A6 Annual Report Project stage: Request ML1016101212010-06-0707 June 2010 G20100368/EDATS: OEDO-2010-0476 - Mark E. Leyse Ltr. 2.206 Petition to Lower the Licensing Basis Peak Cladding Temperature of Vermont Yankee in Order to Provide Necessary Margin of Safety in Event of LOCA Project stage: Request ML1015908092010-06-0808 June 2010 Request for Additional Information Extended Power Uprate - Probabilistic Risk Assessment Review Project stage: RAI 2010-01-14
[Table View] |
Text
From: Guzman, Richard Sent: Wednesday, April 14, 2010 2:05 PM To:
Darling, Theresa H Cc:
Dosa, John J
Subject:
Follow-up Question - EPU Vessels & Internals Integrity
- Theresa, We'd like to discuss the two items below in support of completing the safety evaluation in the Vessels & Internals Integrity review area:
- 1. NMPNS stated in its RAI Response dated February 19, 2010, Attachment 5, RAI Response G1, that they consider their commitment to maintain a RG 1.190 fluence program as adequate.
The NRC staff considers it appropriate for the licensee to commit to submit a revised relief request for elimination of the circumferential reactor vessel weld inspection a full year before the currently approved fluence is reached.
- 2. The NRC staff notes that the current P-T limits in the Technical Specifications, good up to 22 EFPY (approved in Amendment #240 by the NRC on Jan. 27, 2004), is based on a projected neutron fluence at the 1/4 T location on the limiting baseline material of 3.77E17 neutrons per square centimeter (n/cm2) for neutrons with > 1MeV energy. The proposed EPU will increase the neutron flux and the projected fluence level, and therefore, the staff anticipates that the limiting fluence for which the P-T limits are based upon will be reached before 22 EFPY. The staff requests the licensee to provide the revised EFPY value when the 3.77E17 n/cm2 neutron fluence will be reached at the 1/4 T location on the limiting baseline material with the assumption that proposed EPU is approved and implemented on schedule. If the new value invalidates the period of applicability (in EFPY) of the current TS figure, an updated TS page should be submitted which correctly expresses the period of applicability post-EPU.
Anytime Tues - Thurs next week works for us.
- Thanks, Rich Guzman 301-415-1030 E-mail Properties Mail Envelope Properties (92E0E77F3622DA40B501E8D45083D5D9508499C81C)
Subject:
Follow-up Question - EPU Vessels & Internals Integrity Sent Date:
4/14/2010 2:04:41 PM Received Date:
4/14/2010 2:04:00 PM From:
Guzman, Richard Created By:
Richard.Guzman@nrc.gov Recipients:
Theresa.Darling@cengllc.com (Darling, Theresa H)
Tracking Status: None John.Dosa@cengllc.com (Dosa, John J)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 4341 4/14/2010 Options Expiration Date:
Priority:
olImportanceNormal ReplyRequested:
False Return Notification:
False Sensitivity:
olNormal Recipients received: