ML102720883

From kanterella
Jump to navigation Jump to search
Ltr. 09/24/10 Monticello Fire Protection Request for Information
ML102720883
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/24/2010
From: Robert Daley
Engineering Branch 3
To: O'Connor T
Northern States Power Co
References
IP71111.05T, IP71152, IR-11-006
Download: ML102720883 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 24, 2010 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION TO PERFORM A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION; INSPECTION REPORT 05000263/2011-006(DRS)

Dear Mr. OConnor:

On February 7, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection at your Monticello Nuclear Generating Plant. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs baseline fire protection inspection procedure.

The schedule for the on-site inspection activity is as follows:

  • MSO Inspection: February 7 - 11, 2011;
  • Information Gathering Visit: June 13 - 14, 2011;
  • B.5.b Requirements: June 15 - 17, 2011; and
  • Fire Protection Inspection: June 15 - 17, 2011; June 27 thru July 1, 2011; and July 11 - 15, 2011.

The one-week inspection scheduled in February will be part of the triennial fire protection inspection and all hours will be charged to the inspection report. This week long inspection is scheduled as a result of the Monticello decision to withdraw their intention to comply with 10 CFR 50.48(c), National Fire Protection Association Standard (NFPA) 805. The purpose of this inspection is to review a representative sampling of single and multiple spurious issues throughout the plant to evaluate: (1) if the plant successfully addressed single and multiple spurious issues in a way that meets regulations. This includes proper classification of equipment required for safe shutdown and equipment important for safe shutdown; (2) the adequacy of the plant evaluation of multiple spurious actuation in accordance with Regulatory Guide 1.189 and NEI 00-01, Revision 2 for alternative or dedicated shutdown areas; and (3) the adequacy of any compensatory actions taken for identified non-compliances.

J. OConnor The purpose of the information gathering visit in June 2011 is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Monticello Nuclear Generating Plant fire protection programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.

Based on the latest revision to IP 71111.05T, dated December 24, 2009, changes were made to the IP, which now requires the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first on-site week of the inspection starting on June 15, 2011.

Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into five groups. The first group lists information necessary to aid the inspectors in evaluating the Monticello plant progress in addressing single and multiple spurious issues to ensure their compliance with regulations. It is requested that this information be provided to the inspector via mail or electronically no later than January 7, 2011. The second group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection and become familiar with the licensing basis. It is requested that this information be provided to the lead inspector via mail or electronically no later than May 4, 2011.

The third group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (June 13 - 14, 2011). The fourth group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second on-site inspection week (June 27, 2011). The fifth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. Benny Jose. The one-week inspection visit scheduled in February 2011 will be conducted by a Region III inspector, Mr. Alan Dahbur. He can be contacted at (630) 829-9810 or via e-mail at alan.dahbur@nrc.gov. We understand that our regulatory contact for this inspection is Mr. D. Neve of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9756 or via e-mail at benny.jose@nrc.gov.

J. OConnor This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-263 License Nos. DPR-22

Enclosure:

Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS Inspection Report: 05000263/2011-006(DRS)

On-site Inspection Dates: February 7 - 11, 2011 (MSO Inspection)

June 13 - 14, 2011 (Information Gathering Visit)

June 15 - 17, 2011 (B.5.b Requirements)

June 27 - July 1, 2011 (Fire Protection Inspection)

July 11 - 15, 2011 (Fire Protection Inspection)

Inspection Procedures: IP71111.05T, Fire Protection (Triennial)

IP71152, "Identification and Resolution of Problems" Inspectors: B. Jose, lead Inspector (630) 829-9756 benny.jose@nrc.gov A. K. Dahbur G. M. Hausman (630) 829-9810 (630) 829-9743 alan.dahbur@nrc.gov george.hausman@nrc.gov D. Szwarc (630) 829-9803 dariusz.szwarc@nrc.gov I. INFORMATION REQUESTED FOR THE ONE WEEK INITIAL INSPECTION VISIT The following information is requested by January 7, 2011. If you have any questions regarding this request, please call the regional inspector Alan Dahbur as soon as possible.

All information should be sent to Mr. A. Dahbur (e-mail address alan.dahbur@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible.

1. The multiple spurious operation (MSO) expert panel process and their complete review/evaluation of multiple spurious actuations and existing safe shutdown analysis.
2. General information needed to support this inspection:
a. List of protected equipment required for safe shutdown;
b. Cable routing for equipment required for safe shutdown;
c. List of protected equipment important for safe shutdown; and
d. Cable routing for equipment important for safe shutdown.

1 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

3. Analysis performed in support of plant evaluation regarding the close out of noncompliances associated with EGM 07-004, which include the following:
a. List of identified single spurious fire-induced circuit failure configurations;
b. List of corrective actions for single spurious fire-induced circuit failures;
c. List of single spurious actuations evaluated and the result of the evaluations; and
d. List of manual actions evaluated and the result of the evaluations.
4. Analysis performed in support of plant evaluation regarding the close out of noncompliances associated with EGM 09-002, which include the following:
a. List of identified multiple spurious fire-induced circuit failure configurations.
b. List of corrective actions for multiple spurious fire-induced circuit failures.
c. List of generic multiple spurious actuations that have been screened out.

II. INFORMATION REQUESTED PRIOR TO THE INFORMATION GATHERING VISIT The following information is requested by May 4, 2011. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Mr. B. Jose (e-mail address benny.jose@nrc.gov). Electronic media is preferred.

The preferred file format is a searchable pdf file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide four copies of each CD submitted (one for each inspector).

1. The most risk significant fire areas as determined by probabilistic risk analyses, if available. Otherwise, the reactor plant's Individual Plant Examination for External Events (IPEEE) for fire and results of any post-IPEEE reviews for fire.
2. A copy of the current version of the fire protection program (FPP), fire hazards analysis (FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR),

technical specifications and license.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which 10 CFR Part 50, Appendix R, Section III G requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected.
4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included.

2 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

5. Licensing Information:
a. The facilitys license, including the fire protection license condition;
b. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs;
c. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG 0800), Section 9.5.1 or equivalent for licensing purposes;
d. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; III. INFORMATION REQUESTED DURING THE INFORMATION GATHERING VISIT (JUNE 13, 2011)

The following information is requested to be provided to the inspection team during the on-site information gathering visit. Except for Item 1, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 7.a. through 7.h.) provided on separate CDs. In addition, one set of hard copy drawings are requested for Items 3.a. through 3.e.

1. One set of hard-copy documents for facility layout drawings, which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment.
2. Fire Protection Program:
a. A listing of changes made to the FPP since the last triennial fire protection inspection;
b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area;
c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown evaluations);
d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA Codes of Record); and
e. List of plant deviations from code commitments and associated evaluations.

3 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

3. Facility Information:
a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot shutdown and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training;
b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac;
c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current (Vdc) and 125Vdc systems as applicable;
d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and
e. Safe shutdown cable routing database (requested electronically such as on compact disc, if available.
4. Operations Response for Fire Protection:
a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit); and
b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator;
c. Procedure for calling out the fire brigade and requesting off-site assistance.
5. Corrective Actions:
a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last triennial fire protection inspection; and
b. List of current fire impairments, including duration.
6. General Information:
a. A listing of abbreviations and/or designators for plant systems;
b. Organization charts of site personnel down to the level of fire protection staff personnel; and
c. A phone list for on-site licensee personnel.

4 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

7. The B.5.b Mitigating Strategies:
a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2);
b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.;
c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy;
d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies;
e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)

required to be used to implement the mitigation strategies;

f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report;
g. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies; and
h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (August 2008).
8. On-site Discussions:

In addition, during the information gathering visit, it is requested that licensee staff be available for the following:

a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology;
b. Informal discussion on the plants safe shutdown cable routing database and the plant-wide cable routing database, as applicable; and
c. A tour of alternative shutdown and risk significant fire areas.

5 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS IV. INFORMATION REQUESTED TO BE AVAILABLE ON FIRST DAY OF THE SECOND ON-SITE INSPECTION WEEK (JUNE 27, 2011)

The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:
a. Procedures for:
  • Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components;
  • Control of hot work.
b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and
c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
2. Design and Equipment Information:
a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train;
b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;
c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit);
d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit);
e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac electrical systems; and
f. List of all fire protection or Appendix R calculations.

6 Enclosure

FIRE PROTECTION INSPECTION DOCUMENT REQUESTS

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments.

4. Any updates to information previously provided.

V. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

7 Enclosure

J. OConnor In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-263 License Nos. DPR-22

Enclosure:

Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 092410 MON Fire Protection RFI AKD.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII RIII NAME AKDahbur:ls BJose RCDaley DATE 09/23/10 09/23/10 09/24/10 OFFICIAL RECORD COPY

Letter to Mr. Timothy OConnor from Mr. Robert C. Daley dated September 24, 2010.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION TO PERFORM A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION; INSPECTION REPORT 05000263/2011-006(DRS)

DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource