ML102210188

From kanterella
Jump to navigation Jump to search
2010 Perry Nuclear Power Plant Initial Examination Outline Submittal
ML102210188
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/14/2010
From:
NRC/RGN-III
To:
Shared Package
ML100621103 List:
References
Download: ML102210188 (4)


Text

2010 PERRY NUCLEAR POWER PLANT INIT1AL EXAM1NATION OUTLINE SUBMITTAL

Perry Nuclear Power Plant 10 Center Road FENOC P.O. Box 97 Perry, Ohio 44081 February 26, 2010 Mr. Dell McNeil USNRC Chief Examiner United States Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle. Illinois 60532-4351 Perry Nuclear Power Plant Docket No. 50-440 NRC Initial License Examination Outline Submittal

Dear Mr. McNeil:

Enclosed for your review and approval are the outlines for the Perry Initial Licensed Operator Examination scheduled to begin June 14, 2010. These outlines are submitted in accordance with NUREG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 9, Supplement 1).

The following materials are enclosed:

Form ES-201-2, Examination Outline Quality Checklist - (Signed)

Form ES-201-3, Examination Security Agreement (Copy)

Form ES-301-1, Administrative Topics Outline RO - Rev. 0 Form ES-301-1, Administrative Topics Outline SRO - Rev. 0 Form ES-301-2, Control Room/ln-Plant Systems Outline RO - Rev. 0 Form ES-301-2, Control Room/ln-Plant Systems Outline SRO-I - Rev. 0 Form ES 301 2, Control Room/ln Plant Systems Outline SRO-U - Rev. 0 Form ES-301-4, Simulator Scenario Quality Checklist - Rev. 0 (Unsigned)

Form ES-301-5, Transient and Event Checklist - Rev. 0 (4 pages)

Form ES-301-6, Competencies Checklist - Rev. 0 Form ES-401-4, Record of Rejected WAS - Rev. 0 Form ES-D-1, Scenario Outlines and Narrative Summary - Rev. 0 (5 New, 1 Bank)

RO and SRO Written Outlines Form ES-401-1, BWR Examination Outline - Rev. 0 Form ES-401-3, Generic Knowledge and Abilities Outline Tier 3 - Rev. 0 The unsigned Form ES-301-4, Simulator Scenario Quality Checklist, is being sent to support Form ES-201-2, Examination Outline Quality Checklist. A signed version of this form will be sent with the exam materials.

USNRC Page 2 of 2 February 26, 2010 The Written Exam Outline was compiled using the Random Selection Process described in ES-401, , Example Systematic Sampling Methodology and the WA Elimination Guidance provided in ES-401. Rejected WAS were documented on Form ES-401-4, Record of Rejected WAS.

The expected additions to the Exam Security Agreement are additional Operation's Validation Team members.

We request these materials be withheld from public disclosure until after the completion of the exam. If you have any questions, please feel free to contact me at 440-280-4017, or Ray Torres at 440-280-5277.

Sincerely, David 0' Donnell Raymond Torres Nuclear Shift Manager - Facility Representative Staff Nuclear Specialist - Author

Subject:

Perry Training Memo 0001

ES-201 Examination Outline Qualitv Checklist Form ES-201-2 Facility: Perry Date of Examination: 6/14/2010 Item Task Descriotion I Initials

1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. - ,

w b. Assess whether the outline was systematically and randomly prepared in accordance with R

Section D.1 of ES-401 and whether all KIA categories are appropriately sampled.

I ft T

T E

N 2.

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
d. Assess whether the justifications for deselected or rejected WA statements are appropriate.
a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number 2,r' 4

I "

of normal evolutions, instrument and component failures, technical specifications, and S major transients.

I

b. Assess whether there are enough scenario sets (and spares) to test the projected number and M

mix of applicants in accordance with the expected crew composition and rotation schedule U

without compromising exam integrity, and ensure that each applicant can be tested using at L

A T

0 R

least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative

, I! ,d and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(I) the tasks are distributed among the topics as specified on the form I

I (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations / ', 1"1 [ y ~

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. . "rs
a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.

Inn

b. Assess whether the 10 CFR 55,41143 and 55.45 sampling is appropriate.

r/z/1" -

c. Ensure that WA importance ratings (except for plant-specific priorities) are at least 2.5. 4. I
d. Check for duplication and overlap among exam sections.
e. Check the entire exam for balance of coverage. 4%
f. Assess whether the exam fits the appropriate job level (RO or SRO). +

,/prmted Name/Signature Date /I

a. Author b Facility Reviewer (*) c -. ,

c NRC Chief Examiner (#) 03/03/50,0 d NRC Supervisor ,?I, hRc' I 8 e / LJ y &2?&Lh( (L/ 4 7 P ,-..,2-, ~7 3 / 2 L,/dd/u L

Note # Independent NRC reviewer initial items in Column 'c', chief examiner concurrence required

  • Not applicable for NRC-prepared examination outlines ES-201, Page 26 of 28