ML101810266

From kanterella
Jump to navigation Jump to search

Acceptance Review Email, License Amendment Request, Adoption of TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications
ML101810266
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/2010
From: Lauren Gibson
Plant Licensing Branch IV
To: Stroud R
Arizona Public Service Co
Gibson, Lauren, NRR/DORL/LPL4, 415-1056
References
TAC ME3917, TAC ME3918, TAC ME3919
Download: ML101810266 (1)


Text

From:

Gibson, Lauren Sent:

Wednesday, June 30, 2010 8:37 AM To:

Russell.Stroud@aps.com Cc:

Hall, Randy; Burkhardt, Janet

Subject:

Acceptance Review Re: Application for TS Change TSTF-491, Removal of the Main Steam and Main Feedwater Valves from Technical Specifications (TAC Nos. ME3917, ME3918, ME3919)

By letter dated April 29, 2010, Arizona Public Service submitted a license amendment for Palo Verde Nuclear Generating Station. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Lauren Gibson, Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review Re:Application for T S Change TSTF-491,Removal of the Main Steam and Main Feedwater Valves from Technical Specifications (TAC Nos.ME3917, ME3918, ME3919)

Sent Date: 6/29/2010 4:47:05 PM Received Date: 6/30/2010 8:36:00 AM From: Gibson, Lauren Created By: Lauren.Gibson@nrc.gov Recipients:

Russell.Stroud@aps.com (Russell.Stroud@aps.com)

Tracking Status: None Randy.Hall@nrc.gov (Hall, Randy)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 5917 6/29/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: