CAC:MF6576, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) CAC:MF6577, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) CAC:MF6578, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement
|
MONTHYEARML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO Project stage: Request ML15218A3002015-07-31031 July 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times Project stage: Request ML15303A0982015-11-0909 November 2015 Acceptance Review Letter, License Amendment Request, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b Project stage: Acceptance Review ML16060A0022016-02-26026 February 2016 NRR E-mail Capture - Palo Verde, Units 1, 2, and 3: Draft Request for Additional Information Amendment to Adopt TSTF-505 Project stage: Draft RAI ML16064A4972016-03-0707 March 2016 Request for Additional Information, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b Project stage: RAI ML17200D1622017-07-19019 July 2017 License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Project stage: Request ML17307A1882017-11-0303 November 2017 License Amendment Request Supplement for Risk-Informed Completion Times Project stage: Supplement ML18037A9532018-02-0707 February 2018 Regulatory Audit Plan for February 20-23, 2018, Audit at the Licensees Site Facility in Tonopah, Arizona, in Support of LARs to Adopt TSTF-505-A 4B and 10 CFR 50.69 Project stage: Approval ML18074A0202018-03-20020 March 2018 Fpra FAQ 16-0011 Closure Memo Project stage: Request ML18094B1122018-04-0404 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) Project stage: RAI ML18099A0072018-04-0606 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) Project stage: RAI ML18116A0982018-05-0101 May 2018 Regulatory Audit Summary License Amd Requests to Adopt -TSTF-505-A Risk-Informed Extended Completion Times Initiative 4b, and 10 CFR 50.69, Project stage: Other ML18124A0112018-05-0303 May 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) Project stage: RAI ML18129A4482018-05-0909 May 2018 APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Response to RAI 05000528/LER-2018-002, Title Condition Prohibited by Technical Specification for Inoperable Excore Instrument Channel2018-05-0909 May 2018 Title Condition Prohibited by Technical Specification for Inoperable Excore Instrument Channel Project stage: Request ML18138A4802018-05-18018 May 2018 Response to Request for Additional Information for Risk-Informed Completion Times Project stage: Response to RAI ML18152B8742018-06-0101 June 2018 Response to Electrical Engineering Operating Reactor Branch (Eeob) Request for Additional Information for Risk-Informed Completion Times Project stage: Request ML18194A9142018-07-13013 July 2018 Supplemental Response to Request for Additional Information 3.a for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Supplement ML18223A0052018-08-10010 August 2018 Updated Proposed License Condition Regarding License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Request ML18221A5102018-08-23023 August 2018 Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) Project stage: RAI 05000530/LER-2018-001, Reactor Trip on Low Steam Generator Level2018-08-23023 August 2018 Reactor Trip on Low Steam Generator Level Project stage: Request ML18264A3182018-09-21021 September 2018 Response to Request for Additional Information for Risk-Informed Completion Times Project stage: Response to RAI ML18278A2952018-10-0505 October 2018 Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21 Project stage: Supplement ML18278A2892018-10-0505 October 2018 Revised Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update Project stage: Request ML18275A2752018-10-10010 October 2018 Summary of September 14, 2018, Clarification Call with Arizona Public Service to Discuss the Incomplete Responses in the May 18, 2018, Letter the Adoption of RICT (CAC Nos. MF6576, MF6577, MF6578; EPID L-2015-LLA-0001) Project stage: Approval ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) Project stage: Approval ML20013C7612019-05-16016 May 2019 NRR E-mail Capture - (External_Sender) FW: Risk-Informed Completion Times (RICT) NRC Draft SE Review Project stage: Draft Other ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) Project stage: Approval 2018-04-04
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML25003A1752024-12-30030 December 2024 Relief Request 73- Proposed Alternative for Pressurizer Lower Shell Temperature Nozzle Life of Repair ML24326A2002024-11-20020 November 2024 Acceptance Review of Palo Verde Valve Relief Request (VRR) - 02 ML24248A2632024-09-0404 September 2024 Acceptance Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Relief Request (RR) No. 71: Re?Submittal of RR?30 ML24120A2612024-05-0101 May 2024 Email Acceptance Review of Requested Licensing Action License Renewal Commitment 23A, Alloy 600 Management Program Plan ML24103A1222024-04-11011 April 2024 – Acceptance of Requested Licensing Action Re_ License Amendment Request to Revise Technical Specifications 3 ML18312A3322018-11-13013 November 2018 Acceptance Review for License Amendment and Exemption Requests Regarding the Implementation of Framatome High Thermal Performance Fuel ML16043A3892016-02-18018 February 2016 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML16012A0032016-01-11011 January 2016 Draft Unacceptable with Opportunity to Supplement Requested Licensing Action Email, Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15303A0982015-11-0909 November 2015 Acceptance Review Letter, License Amendment Request, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML15113A6362015-04-22022 April 2015 Acceptance of Relief Request 53 ML13358A0492013-12-24024 December 2013 Acceptance Review Following Supplement, License Amendment Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13247A5512013-09-0404 September 2013 Acceptance Review E-mail, Review of Pressurized-Water Reactor Internal Aging Management Program Plan ML13032A5372013-02-0101 February 2013 Acceptance Review Email, License Amendment Request to Adopt TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13025A2482013-01-25025 January 2013 Acceptance Review Email, License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML12243A4662012-08-30030 August 2012 Acceptance Review Results Email - for Relief Request Related to Phased Array Ultrasonic Examination Techniques ML1213103802012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 ML1202703432012-01-27027 January 2012 Acceptance Review Email, Request for Relief to Use Subsequent Edition/Addenda of ASME Code Section XI, for the 3rd 10-Year Inservice Inspection Interval ML1201800792012-01-18018 January 2012 Acceptance Review Email, Request for Approval of Proposed Changes to Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules IR 05000529/20110012011-12-16016 December 2011 Acceptance Review E-mail, License Amendment Request to Modify Technical Specifications to Implement Administrative Changes Including Corrective Actions from U2 Event in LER 50-529/2011-001 ML1113101402011-05-11011 May 2011 Acceptance Review Email, Adoption of Technical Specification Task Force (TSTF)-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML1027102522010-09-28028 September 2010 Acceptance Review E-mail, License Amendment Request to Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis ML1022405612010-08-12012 August 2010 Acceptance Review Email LAR for Cyber Security Plan ML1018102662010-06-30030 June 2010 Acceptance Review Email, License Amendment Request, Adoption of TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications ML1014404042010-05-24024 May 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification (TS) 2.2, Safety Limit Violations, and TS 5.2.1, Onsite and Offsite Organizations to Adopt TSTF-5 and TSTF-65 ML1014404232010-05-24024 May 2010 Acceptance Review Email LAR to Revise TS 5.5.8, Inservice Testing Program (TAC Nos., ME3914/5/6) ML1006807152010-03-0909 March 2010 Acceptance Review Email, Request for Exemption from 10 CFR Part 73, Physical Security Requirements ML1001404542010-01-14014 January 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification Table 3.3.5-1, Engineered Safety Features Actuation System, and Figure 3.5-1, Minimum Refueling Water Tank Volume (TAC ME2842-ME2844) ML0935212592009-12-18018 December 2009 Acceptance Review Email, Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies ML0934307842009-12-0909 December 2009 Acceptance Review Email, License Amendment Request to Revise License Condition for Maximum Power Level and Miscellaneous Technical Specification Changes ML0932302872009-11-19019 November 2009 Email, Acceptance Review, Relief Request No. 45 from Certain ASME Code Class 1 Weld and Component Volumetric Exams of Reactor Vessel Outlet Nozzles for Second 10-Year Inservice Inspection Interval ML0931601922009-11-12012 November 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of Inoperable Inverter ML0929501942009-10-22022 October 2009 Acceptance Review Email Relief Request No. 44, for Third 10-year Inservice Inspection Interval ML0919503422009-07-14014 July 2009 Acceptance Review Email, Relief Request No. 40, Deferral of Reactor Vessel Weld Inspection Frequency ML0918107982009-06-30030 June 2009 Acceptance Review Email, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0909102162009-04-0101 April 2009 Acceptance Review Email, Request for Exemption from Sections of 10 CFR 55, Operators Licenses ML0909101852009-04-0101 April 2009 Acceptance Review Email, License Amendment Request to Relocate RCS Pressure/Temperature Limits from Technical. Specifications to Technical Requirements Manual and Exemption Request from 10 CFR 50 Appendix G ML0906906552009-03-10010 March 2009 Acceptance Review Email, Relief Request No. 41 to Allow Use of Appendix I of Code Case N-729-1 for Remainder of Third 10-year Inservice Inspection Interval ML0904303902009-02-12012 February 2009 Acceptance Review Email, Relief Request 43 for Second 10-year Inservice Inspection Interval ML0904200552009-02-11011 February 2009 Acceptance Review E-mail License Amendment Requests for Hydrogen Monitoring ML0833802942008-12-0303 December 2008 Acceptance Review E-Mail, License Amendment Request to Revise TS 3.5.5 to Increase the Refueling Water Tank Minimum Water Level ML0830802872008-11-0303 November 2008 Acceptance Review of Application to Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, Risk-Informed ML0828407002008-10-0909 October 2008 Acceptance Review Email, License Amendment Request to Revise TS 5.6.5, Core Operating Limits Report (COLR) ML0900801172008-09-0505 September 2008 Acceptance Review Email, License Amendment Request, Revise Technical Specification 4.2.2, Control Element Assemblies ML0824609552008-08-28028 August 2008 Email Relief Request 39 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Randall K. Edington Executive Vice President Nuclear/
C~ief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 November 9, 2015
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
ACCEPTANCE LETTER FOR LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-505-A, REVISION 1 (CAC NOS. MF6576, MF6577, AND MF6578)
Dear Mr. Edington:
By letter dated July 31, 2015, Arizona Public Service Company (APS, the licensee) submitted a license amendment request (LAR) for Palo Verde Nuclear Generating Station (PVNGS),
Units 1, 2, and 3 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15218A300). The proposed amendment would revise the Technical Specifications (TSs) to permit the use of Risk-Informed Completion Times (RICTs) in accordance with TS Task Force (TSTF) traveler TSTF-505-A, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF [Risk-Informed TSTF] Initiative 4b." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to begin its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50. 90 of Title 10 of the Code of Federal Regulations ( 10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety c*onsiderations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to begin its detailed technical review and mak~ an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
Despite a determination that the request is acceptable to begin the technical review, during the acceptance review, NRC staff identified concerns that are more appropriate for being addressed during the technical review process (i.e. via the request for additional information (RAI) process, an audit, or a public meeting). The issues listed below impact the NRC staff's ability to complete the detailed technical review and impact the timeliness of the review.
A clarification call was held on August 28, 2015, with representatives from APS to discuss the linkage between the LAR to adopt TSTF-439, Revision 2, "Eliminate Second Completion Times Limiting Time From Discovery of Failure to Meet an LCO [Limiting-condition for Operation],"
dated February 27, 2015 (ADAMS Accession No. ML15065A031), and this amendment request.
TSTF-505-A states:
It is necessary to adopt TSTF-439, Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO, in order to adopt TSTF 505 for those Required Actions that are affected by both Travelers.
The licensee stated that adoption of TSTF-439 is not required to adopt TSTF-505 and that it will
~till pursue the adoption of TSTF-505 even if the TSTF-439 LAR is not approved. Your LAR to adopt TSTF-439 has not been approved by NRC; therefore, the NRC staff has decided to exclude the review of the TSs that are impacted by the approval of the LAR to adopt TSTF-439.
The following TSs will not be reviewed by NRC staff until the TSTF-439 LAR is approved:'
TS 1.3, "Completion Times" TS 3.7.5, "Auxiliary Feedwater (AFW) System TS 3.8.1, "AC [Alternating Current] Sources - Operating" TS 3.8.9, "Distribution Systems - Operating" If the TSTF-439 LAR is not approved, you will need to resubmit the TSs listed above with the second completion times included.
A clarification call was held on October 15, 2015 with representatives from APS to discuss the proposed Fire PRA, including the Fact and Observations (F&Os) provided, the Configuration Risk Management Program (CRMP) tool, and PRA functionality information requested in the model application. The LAR indicates that only Unit 1 currently has a Fire PRA. The NRC staff stated that in order to complete the TSTF-505 LAR review for PVNGS, the staff will request additional information on the Unit 2 and 3 Fire PRAs. The NRC staff also stated its plan to ask additional information on the Fire PRA F&Os and noted the need for a completed CRMP tool to be used for the RICT program in order to perform a complete evaluation of the TSTF-505 LAR.
In addition, information requested in the model application, Enclosure 1, related to PRA functionality would be necessary for the review.
A public teleconference was held on August 27, 2015, between NRC staff and NEI to discuss NRC's concerns related to the application of the industry guidance, Nuclear Energy Institute (NEI) 06-09, Revision 0-A, "Risk-Informed Technical Specifications Initiative 4b Risk-Managed Technical Specifications (RMTS) Guidelines," dated November 2006 (ADAMS Accession No. ML12286A322), and its implementation in TSTF-505. The August 27th meeting notice, slides, and summary can be found at ADAMS Package Accession No. ML15226A469. As a follow-up to the August 27th teleconference, NRC staff met with the NEI Risk-Informed Task
Force on October 22, 2015, to discuss* the definition of "PRA functionar' and if it will be used consistently by the licensees during full power operation with loss of a specified safety function or inoperability of all required trains or divisions of a system and in a manner that maintains safety margins,~defense in depth, a_nd conformance with regulatory requirements. Many insights came out of the October 22, 2015 including the need for additional information regarding degraded conditions, where an actuation logic channel is inoperable but PRA.
functional. The October 22, 2015, meeting notice and slides can be found at ADAMS Package Accession No. ML15268A006. The completion of your TSTF-505 LAR review is tied to the issues listed above, which may result in an RAI in order for NRC staff to complete its review and it could affect the review schedule.
If you have any questions, please contact me at (301) 415-1233 or via e-mail at Margaret. Watford@nrc.gov.
Docket Nos. STN 50-528, STN 50-529, and $TN 50-530 cc: Distribution via Listserv Sincerely, Margaret M. Watford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
~,_
ML15303A098 OFFICE NRR/DORL/LPL4-1 IPM NRR/DORLILPL4-1 ILA NRRIDSS/STSB/BC NAME MWatford JBurkhardt RElliott DATE 11 /02/15 10/30/15 11/06/15 OFFICE* NRR/DEIEICB/BC NRR/DSS/SBPB/BC NRC/DSSISCVB/BC NAME MWaters GCasto RDennig DATE 11/03/15 11/03/15 11/03/15 OFFICE NRR/DORL/LPL4-1 /PM NAME MWatford DATE 11/09/15