From:
Hall, Randy Sent:
Monday, May 24, 2010 2:40 PM To:
Russell.Stroud@aps.com
Subject:
Acceptance Review for L AR for Palo Verde Units 1, 2 and 3,Revisions to TS 2.2 "Safety Limit Violations," and TS 5.2.1,"Onsite and Offsite Organizations"(TAC NOs, ME3755/6/7)
May 24, 2010 Russell A. (Rusty) Stroud Licensing Section Leader Regulatory Affairs Palo Verde Nuclear Generating Station Arizona Public Service Company Rusty:
By letter dated April 8, 2010, Arizona Public Service Company (APS) submitted a license amendment request for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3.
The proposed amendments would revise Technical Specification (TS) 2.2, "Safety Limit Violations," to delete redundant reporting and operational restriction provisions, consistent with the Technical Specification Task Force (TSTF) Change Traveler TSTF-5. In addition, the amendments would revise TS 5.2.1, "Onsite and Offsite Organizations," to replace plant specific titles with generic titles, consistent with TSTF-65.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-4032.
Randy Hall, Senior Project Manager
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-4032 Randy.Hall@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Review for L AR for Palo Verde Units 1, 2 and 3,Revisions to TS 2.2 "Safety Limit Violations," and TS 5.2.1,"Onsite and Offsite Organizations"(TAC NOs, ME3755/6/7)
Sent Date: 5/24/2010 2:28:05 PM Received Date: 5/24/2010 2:39:00 PM From: Hall, Randy Created By: Randy.Hall@nrc.gov Recipients:
Russell.Stroud@aps.com (Russell.Stroud@aps.com)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11003 5/24/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: