ML093431318
ML093431318 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood, River Bend, Vermont Yankee, Duane Arnold File:NorthStar Vermont Yankee icon.png |
Issue date: | 12/01/2009 |
From: | NRC/NRR/DPR/PFPB |
To: | |
Simmons, A, NRR/DPR, 415-2791 | |
References | |
Download: ML093431318 (1) | |
Text
Radiological Decom.
Requirement ($)
(1)
(2)
(3) 2H
$503,368,681
$203,073,403
$455,611,036 2/21/2014
($47,757,645) 2
$405,242,283
$165,100,000
$257,191,760 10/17/2027
($148,050,523) 2
$405,242,283
$183,200,000
$292,250,775 12/18/2028
($112,991,508) 2
$405,242,283
$185,800,000
$278,578,978 10/31/2025
($126,663,305) 2
$405,242,283
$180,000,000
$280,868,548 11/6/2027
($124,373,735) 1
$378,770,069
$133,100,000
$214,527,204 8/29/2025
($164,242,865) 2
$513,383,856
$372,010,000
$425,993,159 3/21/2012
($87,390,697)
Plant Name Braidwood Station, Unit 1 Braidwood Station, Unit 2 Arnold (Duane) Energy Center Vermont Yankee Power Station Date of Termination of Operations Difference in NRC Minimum Formula and Projected Trust Fund Amount NRC Minimum Formula (10 CFR 50.75)
"Target" Projected Trust Fund Amount Reported to the NRC as of December 31, 2008 Cat Byron Station, Unit 1 Byron Station, Unit 2 River Bend Station (Regulated)
Column (3) = Column (2) - Column (1)
Category 1 - Electric utilities and other licensees authorized to recover the total cost of decommissioning from nonbypassable charges.
Note:
Category 2 - Non-electric utilities without access to nonbypassable charges. (2H -
Plant with both Cat 1 and Cat 2 licensees, referred to here as a 'Hybrid' plant)